--- title: Gordon County Zoning Ordinance, 6.04.06. Detention and Retention collection: local-codes id: local-code:gordon-county/zoning/6.04.06 cite_as: Gordon County, Ga., Zoning Ordinance ยง 6.04.06 canonical_url: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.06 md_url: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.06.md text_url: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.06/text source_url: https://library.municode.com/ga/gordon_county/codes/unified_land_development_code date: 2024-03-19 status: active jurisdiction: county:gordon jurisdiction_name: Gordon County county_fips: "13129" corpus_version: local-codes-gordon-county-1c9bbdb767b1 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/gordon-county/zoning/~chapter-6.md previous: https://georgiacommons.org/code/local/gordon-county/zoning/6.04.05.md next: https://georgiacommons.org/code/local/gordon-county/zoning/chapter-8.md index: https://georgiacommons.org/code/local/gordon-county.md branch: zoning edition: As published by Municode, current through 2024-03-19 edition_date_kind: current_through source_publisher: Municode version_id: local-code:gordon-county/zoning/6.04.06@2024-03-19-fcbffa6729 --- # Gordon County Zoning Ordinance, 6.04.06. Detention and Retention > As published by Municode, current through 2024-03-19 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 6 - INFRASTRUCTURE IMPROVEMENTS A. When determined as necessary by an independent state approved professional, developments shall be required to submit a certified hydrology study which shall discuss the effects of drainage on any affected lots and any resulting effects of drainage on off-site locations. The study shall show that drainage from this development will not adversely affect downstream property owners. B. If hydrologic studies and examinations show that the proposed development will increase stormwater runoff by more than seven (7) cfs for a 100-year storm, then the proposed development may be required to include storage and release mechanisms such that rainwater from impervious areas will leave the site at the same rate, over the same period, as was characteristic of the unmodified site. No building permit shall be granted unless storage and release is provided for the water volume generated by a 100-year storm. C. The following criteria shall be used in determining the needs for detention ponds: 1. If the amount of increase runoff due to the development is no more than seven (7.0) cfs for a 100-year storm, detention facilities are not required if downstream street culverts are adequately sized to pass the 100-year storm without overtopping the road. 2. If the development abuts and drains into a studied stream, detention facilities are not required, provided that existing street culverts are adequately sized to pass the 100-year storm without overtopping the road and the property immediately upstream of the culvert is undeveloped. The County may determine that the detention facilities requirement can be waived if the developer upgrades the street culvert. 3. If there are adequately sized street culverts downstream of the proposed development that will pass the 100-year storm without overtopping the road and the runoff can be adequately conveyed to a studied stream, then no detention facilities are required. 4. If the downstream system is inadequate to pass the 100-year storm, the developer is required to detain the increased runoff (provided the runoff increase is greater than seven (7.0) cfs for a 100-year storm), and only release that amount of runoff produced by the property prior to development. The hydrology study necessary to design retention and detention facilities must be certified by an appropriate state approved professional. D. Detention facilities shall be designed for the two (2), five (5), ten (10), 25-year, 50-year and 100-year storm events. The reservoir routing method or an equivalent method shall be used in sizing the detention facility. The bowstring method is not allowed. E. The emergency outflow device for the detention facility shall be designed to pass the one hundred (100) year developed inflow without overtopping the dam. F. Detention facility discharge locations shall be defined drainage ditches. The developer's appropriate state approved professional shall include in the hydrology study a discussion of existing conditions downstream of the detention pond and show that downstream property owners will not be adversely affected by the concentrated runoff. G. Adequate access shall be provided for maintenance of all detention facilities. H. It is the responsibility of the owner/developer, future owners, and successors and assigns to maintain detention/retention facilities. I. On a detention pond the steepest fill slopes shall be 2:1, and the steepest cut slopes shall be 2:1. J. Fences a minimum of five (5) feet in height with a minimum ten (10) feet wide gate will be required on all detention ponds where the sides of the pond have a slope of two (2) horizontal to one (1) vertical or greater and the depth of water in the pond is greater than two (2) feet at one (1) hour after the duration of the storm event, and shall be deeded to the County. Normally dry headwater pools are exempt from the fencing requirement. Said fences shall be constructed of chain-link and be brown or black in color within all zoning districts excluding industrial.