Skip to content
Georgia Commons
Menu

Grantville · Zoning Ordinance

Appendix A - ZONING / Article 14 - SIGNS

Sec. 14.10. Construction Standards.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. All signs for which a permit is required under this ordinance shall be constructed and maintained in accordance with the provisions of the city building code.

b. Signs for which a permit is not required under this ordinance that are constructed of degradable material may be posted for a maximum of sixty (60) days unless replaced with another sign of the same material. Any such replacement signs may be posted for a maximum of sixty (60) days.

History

The history line the source prints at the end of the section.

(Ord. No. 11-2012, 11-26-2012; Ord. No. 05-2013, 6-10-2013)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:grantville/zoning/14.10@2026-11-11-c0f50cee3e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Grantville Zoning Ordinance, Sec. 14.10. Construction Standards | Georgia Commons