Skip to content
Georgia Commons
Menu

Grantville · Zoning Ordinance

Appendix A - ZONING / Article 17 - ADMINISTRATION

17.15-1. Permit Applications. Each application for

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a permit, with the required fee, shall be filed with the building official on a form furnished by the City of Grantville for the specific work to be done, including a general description and the location of the proposed work. The application shall be signed by the owner or his agent or contractor. The application shall indicate the proposed occupancy.

a. Each application for the construction, and/or the enlargement of a building or premises greater than 200 square feet will require two sets of plans drawn to scale. The official seal of a Certified Architect or engineer legally registered under the laws of this state will be required for all residential and commercial buildings and as required by Georgia Building and Fire Codes.

b. Each application shall contain two copies of the land plat from the Coweta County tax office showing the exact

location, size of building, distance to property and building lines, total acreage and square footage of lot or parcel. These copies may duplicates.

c. Where private sewerage system are used, a copy of the permit for the septic system, issued by the Coweta County Health Department, shall accompany the application for permit.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:grantville/zoning/17.15-1@2026-11-11-89fa8e1a0e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Grantville Zoning Ordinance, 17.15-1. Permit Applications. Each application for | Georgia Commons