147.51. Street lights shall be provided by the developer in new subdivisions which propose the construction of a new street to be dedicated to the city, or which propose lot access to existing city streets. All fees, materials, labor, poles, fixtures, and any other associated items shall be furnished, paid for and installed by the developer. Street lighting shall be installed and operating prior to approval of the final plat. 147.52 In all cases, guidelines related to materials, distances between poles, height, and any other relevant specifications shall be adhered to as set forth in the American National Standard Practice for Roadway Lighting and as specified by the power provider for the project. 147.53 A street lighting plan developed by the supplying utility company shall accompany the preliminary plat. This plan shall be reviewed and approved by the city for compliance with the requirements of the national standard as part of the preliminary plat approval process. 147.54. The developer will be responsible for lighting costs until the city assumes responsibility. The city shall take over payment of the monthly energy charges from the owner/developer once the development is 50 percent complete based on issued certificate of occupancys, and after a written request is received from the developer/ builder to take over monthly costs. 147.55. All fixtures and poles shall meet the requirements of the city, and all maintenance costs shall be the responsibility of the utility company. Fixtures shall be mounted a minimum of 16 feet above the ground and each fixture shall have appropriate arm length to illuminate the street and be decarative in nature, unless otherwise approved by the city. The city, in addition to other requirements, may require a light to be located at street intersections within the development.