--- title: Gray Zoning Ordinance, Section 149. Storm drainage and stormwater management collection: local-codes id: local-code:gray/zoning/149 cite_as: Gray, Ga., Zoning Ordinance ยง 149 canonical_url: https://georgiacommons.org/code/local/gray/zoning/149 md_url: https://georgiacommons.org/code/local/gray/zoning/149.md text_url: https://georgiacommons.org/code/local/gray/zoning/149/text source_url: https://library.municode.com/ga/gray/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:gray jurisdiction_name: Gray place_fips: "1334512" corpus_version: local-codes-gray-04fe700514fb publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/gray/zoning/~appendix-a/~article-xiv.md previous: https://georgiacommons.org/code/local/gray/zoning/148.6.md next: https://georgiacommons.org/code/local/gray/zoning/article-xv.md index: https://georgiacommons.org/code/local/gray.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:gray/zoning/149@2026-11-11-c8794d2e09 --- # Gray Zoning Ordinance, Section 149. Storm drainage and stormwater management > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING AND SUBDIVISION REGULATIONS / Article XIV - REQUIRED SUBDIVISION IMPROVEMENTS Prior to commencement of construction, subdivider shall provide a storm drainage plan to the commission for approval. Said plan shall include accurate existing and proposed watercourses and the system of open channels, pipes, culverts, drains, inlet, catch basins, and similar facilities designed to handle stormwater in times of rainstorms. The calculations used in the design of such systems and plans shall clearly indicate the easements required in the construction and maintenance of the drainage system and said easements shall be shown on the final plat. Further, the subdivider shall comply with all stormwater ordinance requirements of the City of Gray. No development will be approved to proceed that does not address runoff and drainage issues. ## History (Ord. No. 05-O-004, 4-4-2005; Ord. No. 07-O-002, 3-5-2007)