Sec. 121-201. Planned unit development (PUD) and commercial planned unit development (CPUD).

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Generally. The provisions of this section shall become applicable upon and after completion of rezoning any tract of land to a PUD or CPUD. Upon successful rezoning, at the time the developer desires to commence development, the developer shall make submissions for development approvals pursuant to chapter 113, which shall include, but shall not be limited to, preliminary and final plats and construction drawings all as set out in chapter 113. Each such submission shall be accompanied by a development timetable for the proposed and submitted phase or subdivision, the original plans or those plans amended as a result of recommendations or requirements of the commission and any other data or proof of compliance to the conditions provided in chapter 113, all of which shall conform to the guidelines therein. The planning commission may recommend for approval or denial such applications as submitted, or may recommend for approval the application subject to specified conditions in addition to those described herein. City council approval of any detailed construction plan shall lapse unless construction is started in the approved section, within one year. No conveyances of subdivided land within the development shall be made until the developer has complied with chapter 113 for said phase or subdivision.

(b) Dimensional requirements for PUD only.

(1) A maximum of 67 percent of the total PUD may be occupied for residential use which includes streets, alleys, parking areas, private open spaces and courts which abut and service adjacent residences or groups of residences. It does not include usable open space available for use by the general public.

(2) A minimum of 33 percent of open-air recreational uses and other usable spaces. Usable open space shall be defined as an open area designed and developed for use by the occupants of the development or by others for recreation (commercial, public, or private), courts, or gardens. The space shall be effectively separated from auto traffic and parking and shall be readily accessible. Open space does not include space devoted to streets, parking, rights-of-way, or utility easements.

(3) A maximum of 20 percent for other uses.

(4) The density of residences shall not exceed four dwelling units per acre in the total PUD. Land devoted to residential use, as defined in subsection (b)(1) of this section, shall not exceed ten units per acre of land.

(5) There is no minimum lot size or width. However, every single-family dwelling shall have access to a street, court, or walkway or other area dedicated to public use. No single-family or two-family dwellings and accessory building shall be erected within 30 feet of any other structure.

(6) Maximum height of all other structures is 40 feet, excluding religious institutions and approved towers or antennas.

(7) Maximum length of a continuous structure of townhouse or condominiums is eight dwelling units.

(8) Parking shall meet the requirements of section 121-92.

(9) Signs shall meet the requirements of chapter 109.

(c) Development plan approval procedure for PUD and CPUD. Upon rezoning, at the time the developer desires to commence development, which, unless extended by resolution of the mayor and council, shall commence within two years of rezoning or the rezoning shall lapse, a development plan prepared by an architect, landscape architect, engineer, land surveyor, planning consultant or other qualified person shall be presented to the planning commission and shall include the following:

(1) Survey of the property showing existing features of the property, including contours, buildings, structures, streets, utility easements, rights-of-way, and land use.

(2) Site plan showing proposed building locations and land use areas.

(3) Traffic circulation, parking areas and pedestrian walks.

(4) Preliminary landscape plans, including site grading and landscape design.

(5) Preliminary drawings for buildings to be constructed in the current phase, exterior elevations and cross-sections.

(6) Preliminary engineering plans, including street improvements and construction, drainage system, water and sewerage system, and public utility extensions.

(7) Engineering feasibility studies of any anticipated problems which might arise due to the proposed development.

(8) Construction sequence and time schedule for completion of each phase for buildings, parking spaces, and landscaped areas.

a. Phasing of construction activities shall be indicated on the development plan and estimated dates of ground breaking and completion shall be included.

b. Facility and utility development shall be completed in current phase before following phase is implemented except where applicable utility lines may be extended to development in future phases.

c. Phasing needs to be indicated and done in conjunction with the overall development plan.

(Zoning Ord. 2007, § 9.17)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:greensboro/zoning/121-201@2026-11-14-9f86e41c67

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.