--- title: Greenville Zoning Ordinance, 12.3. Manufactured Home Parks collection: local-codes id: local-code:greenville/zoning/12.3 cite_as: Greenville, Ga., Zoning Ordinance § 12.3 canonical_url: https://georgiacommons.org/code/local/greenville/zoning/12.3 md_url: https://georgiacommons.org/code/local/greenville/zoning/12.3.md text_url: https://georgiacommons.org/code/local/greenville/zoning/12.3/text source_url: https://library.municode.com/ga/greenville date: 2026-11-11 status: active jurisdiction: city:greenville jurisdiction_name: Greenville place_fips: "1335016" corpus_version: local-codes-greenville-0774e526ae8d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/greenville/zoning/~appendix-a/~article-12.md previous: https://georgiacommons.org/code/local/greenville/zoning/12.2.md next: https://georgiacommons.org/code/local/greenville/zoning/12.3-2.md index: https://georgiacommons.org/code/local/greenville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:greenville/zoning/12.3@2026-11-11-befbc13a84 --- # Greenville Zoning Ordinance, 12.3. Manufactured Home Parks > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article 12 - MANUFACTURED HOMES AND MANUFACTURED HOME PARKS 12.3-1. Procedures for Development. All manufactured home parks developed after adoption of this ordinance shall meet the following site plan requirements: a. Site Plan Approval Required. All manufactured home park developments shall require site plan approval by the Planning Commission in accordance with the procedures and requirements established herein. Site plans required herein for the placement of three (3) or more residential units shall contain the seal of a Georgia Registered Engineer or Surveyor. No building permits shall be issued for sites within any development until final approval is granted subject to all park plan requirements. b. Park Plan Submittal Requirements. All park plans shall be submitted to the City Clerk accompanied by the required fee payment as established by the City of Greenville. The City Clerk will convey the plans to the Planning Commission for approval. c. The name of the proposed park, and the name, address and telephone number of the applicant. d. Location map and legal description of the manufactured home park, north arrow (designated, magnetic or true). e. Complete plans to scale of one inch equals not more than one hundred (100) feet and specifications of the proposed park showing: • The area and dimensions of the tract of land; including topographic data at a contour interval of not more than five (5) feet or an interval appropriate for decision making on the tract; and including the location and type of soils on the tract. Statement of accuracy signed by surveyor or engineer as applicable. • The number, location and dimensions of all manufactured home lots. • The location and width of streets; the location and size of drainage mechanisms proposed, including the size of each application drainage area. • The location of service buildings (laundry service, office, community building etc.) and other proposed structures. • The location of water and sewer lines and riser pipes. • Plans and specifications of the water supply and refuse and sewerage disposal facilities. • Plans and specifications of all buildings constructed or to be constructed with the park. • The location of street lights, if applicable. • The location of bulk refuse containers, perimeter walls, and park identification signs. • A soil erosion and sedimentation plan meeting the requirements of the Soil Erosion and Sedimentation Act. • Certification from the appropriate authority on water and sewer acceptability. f. Development Compliance. All required improvements, according to the site plan approved by the Planning Commission, shall be installed in each phase before the issuance of building permits.