--- title: "Grovetown Zoning Ordinance, Sec. 201(9). Appendix B; Article II; Section 201(9) of the Code of Ordinances, City of Grovetown, GA is hereby modified as follows:" collection: local-codes id: local-code:grovetown/zoning/201-9 cite_as: Grovetown, Ga., Zoning Ordinance ยง 201(9) canonical_url: https://georgiacommons.org/code/local/grovetown/zoning/201-9 md_url: https://georgiacommons.org/code/local/grovetown/zoning/201-9.md text_url: https://georgiacommons.org/code/local/grovetown/zoning/201-9/text source_url: https://library.municode.com/ga/grovetown/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:grovetown jurisdiction_name: Grovetown place_fips: "1335716" corpus_version: local-codes-grovetown-72d2331ab54b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/grovetown/zoning/~appendix-a/~article-ii.md previous: https://georgiacommons.org/code/local/grovetown/zoning/201.md next: https://georgiacommons.org/code/local/grovetown/zoning/202.md index: https://georgiacommons.org/code/local/grovetown.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:grovetown/zoning/201-9@2026-11-11-04cfc434b7 --- # Grovetown Zoning Ordinance, Sec. 201(9). Appendix B; Article II; Section 201(9) of the Code of Ordinances, City of Grovetown, GA is hereby modified as follows: > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article II - PROCEDURE FOR PLAT APPROVAL "the placement of water/utility meters within impervious locations such as driveways, sidewalks, asphalt, concrete, brick, stone or other similar types of construction material is hereby prohibited. Should a water/utility meter be installed in such a location are previously noted, the full cost of relocation of said meter shall be at the cost of the developer/contractor/homeowner. At no time shall the City of Grovetown bear the cost of relocation of said water/utility meter. The City of Grovetown shall not accept ownership/maintenance of any area that is noted to be in violation of this provision." ## History (Ord. No. 219, 6-11-2012)