--- title: Gwinnett County Enabling Legislation, Sec. 3 (Part I, Article II, Division 9). Definitions collection: local-codes id: local-code:gwinnett-county/charter/part-i-article-ii-division-9-3 cite_as: Gwinnett County, Ga., Enabling Legislation, Part I, Article II, Division 9, § 3 canonical_url: https://georgiacommons.org/code/local/gwinnett-county/charter/part-i-article-ii-division-9-3 md_url: https://georgiacommons.org/code/local/gwinnett-county/charter/part-i-article-ii-division-9-3.md text_url: https://georgiacommons.org/code/local/gwinnett-county/charter/part-i-article-ii-division-9-3/text source_url: https://library.municode.com/ga/gwinnett_county/codes/code_of_ordinances date: 2026-04-14 status: active jurisdiction: county:gwinnett jurisdiction_name: Gwinnett County county_fips: "13135" corpus_version: local-codes-gwinnett-county-a0bcf2e4abff publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/gwinnett-county/charter/~part-i/~article-ii/~division-9.md previous: https://georgiacommons.org/code/local/gwinnett-county/charter/part-i-article-ii-division-9-2.md next: https://georgiacommons.org/code/local/gwinnett-county/charter/part-i-article-ii-division-9-4.md index: https://georgiacommons.org/code/local/gwinnett-county.md branch: charter edition: As published by Municode, current through 2026-04-14 edition_date_kind: current_through source_publisher: Municode version_id: local-code:gwinnett-county/charter/part-i-article-ii-division-9-3@2026-04-14-7b8dabb718 --- # Gwinnett County Enabling Legislation, Sec. 3 (Part I, Article II, Division 9). Definitions > As published by Municode, current through 2026-04-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part I - RECREATION DISTRICT / Article II - AUTHORITIES, BOARDS AND COMMISSIONS / Division 9 - STORM-WATER AUTHORITY; CREATION As used in this act, the terms: (1) "Cost of the project" shall embrace the cost of construction; the cost of all lands, properties, rights, easements, and franchises acquired; the cost of all machinery and equipment; financing charges and interest prior to and during construction and for one year after completion of construction; cost of engineering, architectural, fiscal, and legal expenses and of plans and specifications and other expenses necessary or incident to determining the feasibility or practicability of the project; administrative expenses and such other expenses as may be necessary or incident to the financing authorized by this act; the construction of any project; and the placing of the same in operation. Any obligation or expense incurred for any of the foregoing purposes shall be regarded as a part of the cost of the project and may be paid or reimbursed as such out of the proceeds of revenue bonds issued under the provisions of this act for such project. (2) "Project" means and includes the acquisition, engineering, construction, equipping, maintenance, operation, repair, and replacement of storm-water management systems and facilities useful and necessary for the collecting of storm water, and the treatment and release of storm water of any and every type, and additions and improvements to and extensions of such facilities so as to assure an adequate stormwater system. (3) "Revenue bonds," "bonds," or "obligations" as used in this act shall mean revenue bonds as defined and provided for in article 3 of chapter 82 of title 36 of the O.C.G.A. [(O.C.G.A. § 36- 82-60 et seq.)], the "Revenue Bond Law," and such type of obligations may be issued by the storm-water authority as authorized under the "Revenue Bond Law" and any amendments thereto and, in addition, shall also mean obligations of the storm-water authority the issuance of which are specifically provided for in this act. (4) "Storm-water authority" means the Gwinnett County Storm-water Authority created in section 2 of this act. (5) "Storm-water management systems and facilities" or "Gwinnett County's Municipal Separate Storm Sewer System" shall mean those natural and manmade channels, swales, ditches, rivers, streams, creeks, branches, reservoirs, ponds, drainageways, inlets, catch basins, pipes, headwalls, storm drains, curbs and gutters, lakes and other physical works, properties, and improvements which transfer, control, convey, or otherwise influence either the movement of storm-water runoff or water quality, which are either owned by the county or over which the county has accepted an offer of dedication of an easement or other legally binding permanent right of use for storm-water drainage and for which the county has the obligation of maintenance for storm-water drainage purposes.