Gwinnett County · Zoning Ordinance
Gwinnett County Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2026-04-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Part 5 of 6. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
3. Exception: Any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and,
4. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:
a. Stream crossings for water lines; or,
b. Stream crossings for sewer lines.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-40. Proof or Presumption of Violation by Injury.
The fact that land-disturbing activity for which a land disturbance permit has been issued results in injury to the property of another shall neither constitute proof of, nor create a presumption of, a violation of the standards provided for in this UDO or the terms of a land disturbance permit.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-50. Permit Application and Plan Requirements.
400-50.1 General. The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of Gwinnett County that affect the tract to be disturbed and the area surrounding it. They shall review the UDO and any other ordinances, regulations, or permits that regulate the development of land within the unincorporated areas of Gwinnett County. However, the operator is the only party who may obtain a land disturbance permit.
400-50.2 Application Requirements.
A. Land Disturbance Permit Required. Land-disturbing activities within the jurisdictional boundaries of Gwinnett County shall not be conducted by any person without first obtaining a land disturbance permit from the Gwinnett County Department of Planning and Development to perform such activity and providing a copy of the NOI submitted to the Environmental Protection Division if applicable. If land is to be disturbed or developed in phases, then a separate land disturbance permit shall be required for each phase.
B. Application Submittal. The application for a permit shall be submitted to the Gwinnett County Department of Planning and Development and shall include the applicant's Erosion, Sedimentation, and Pollution Control Plan accompanied by supporting data as necessary. Plans shall include, as a minimum, the data specified in Section 400-30.2 and 400-30.3. Erosion, Sedimentation, and Pollution Control Plans, together with supporting data, shall demonstrate affirmatively that the land-disturbing activity proposed will be carried out in such a manner that the provisions of Sections 400-30.2 and 400.30.3 will be met. Applications for a permit will not be accepted unless accompanied by a full set of the applicant's Erosion, Sedimentation, and Pollution Control Plans. All applications shall contain a certification stating that the plan preparer, or the designee thereof, visited the site prior to creation of the plan in accordance with the Environmental Protection Division Rule 391-3-7.10.
C. Fees. A land disturbance permit fee, in an amount as established by the Board of Commissioners, shall be charged for each acre or fraction thereof in the project area. In addition to the land disturbance permit fee, fees shall be assessed pursuant to O.C.G.A. § 12-5-23(a) (5), provided that such fees shall not exceed $80.00 per acres of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant O.C.G.A. § 2-7-8(a), half of such fees levied shall be submitted to the Georgia Environmental Protection Division; except that any and all fees due from an entity that is required to give notice pursuant to O.C.G.A. § 12-7-17(9) and (10) shall be submitted in full to the Georgia Environmental Protection Division regardless of the existence of a Local Issuing Authority in the jurisdiction. The local issuing authority with plan review authority shall approve or disapprove a revised plan within 35 days of receipt.
D. Review by County Departments. After having received a complete land disturbance permit application, having reviewed same by the Department of Planning and Development, and finding it to be in compliance with all titles of this UDO, the requirements of Chapter 400 and any variances required by Subsections 400-30.3.O. and 400-30.3.P. are obtained, the Department of Planning and Development shall issue the land disturbance permit.
E. Permit Suspension, Revocation, or Modification. The land disturbance permit may be suspended, revoked, or modified by the Department of Planning and Development, as to all or any portion of the land affected by the plan, upon finding that the holder or the holder's successor in the title is not in compliance with the approved Erosion, Sedimentation, and Pollution Control Plan or that the holder or the holder's successor in title is in violation of this Chapter. A holder of a land disturbance permit shall notify any successor in title to the holder as to all or any portion of the land affected by the approved plan of the conditions contained in the permit. If a permit applicant has had two or more violations of previous permits of this Chapter, of this ordinance section or of the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application.
400-50.3 Plan Requirements.
A. Plans shall be prepared as outlined in Chapter 330 of this UDO.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-60. Inspections.
400-60.1 The Department will periodically inspect the sites of land-disturbing activities for which land disturbance permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures and practices required in the plan are effective in controlling erosion and sedimentation. Also regulated by Gwinnett County are both primary; secondary, and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities.
400-60.2 The Director shall have the power to conduct such investigations as reasonably deemed necessary to carry out the duties as prescribed in this ordinance, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
400-60.3 Entry or access shall not be refused by any person to any authorized representative or agent of the Department who requests entry for the purpose of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-70. Violations, Enforcement, and Penalties.
Any action or inaction that violates the provisions of this Chapter 400 shall be subject to the enforcement actions and penalties identified in Chapter 120 of this UDO.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-80. Education and Certification Required.
400-80.1 Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the Georgia Soil and Water Conservation Commission in consultation with the Environmental Protection Division (EPD) of the Department of Natural Resources and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
400-80.2 For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the Georgia Soil and Water Conservation Commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
400-80.3 Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this ordinance.
400-80.4 If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-90. Variance and Appeal.
400-90.1 Variance and Appeal.
A. A variance from the requirements of this chapter or of the decision or interpretation of the Director shall be submitted by the property owner on an application form as prescribed by the Department, along with such fees as may be established from time-to-time by the Board of Commissioners.
B. The suspension, revocation, or modification with condition of a permit by the Department of Planning and Development upon finding that the holder is not in compliance with the approved erosion and sediment control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of this chapter of the UDO; shall entitle the person submitting the plan or holding the permit to a hearing before the Board of Construction Adjustments and Appeals to be scheduled in their normal course of business after receipt by the Department of Planning and Development of written notice of appeal.
C. The property owner shall state clearly why the requirements of this chapter cannot be met or why the interpretation or decision of the Director is in error.
D. The Director shall transmit a copy of the appeal application to all affected County departments, including the Soil and Water Conservation District, soliciting their respective recommendations and coordinate the recommendations of each respondent. The other responses together with the director's recommendation shall be forwarded to the Board of Construction Adjustments and Appeals, with the exception of appeals from buffer variance request decisions, for final action in their normal course of business.
E. Buffer variance appeals shall be decided upon by the Soil and Water Conservation District in their normal course of business whose decision shall be final. An appeal in conflict with the provisions of the Georgia Erosion and Sedimentation Act, O.C.G.A. § 12-7-1 et seq., shall not be considered or approved by the Board of Construction Adjustments and Appeals.
F. After final action by the Board of Construction Adjustments and Appeals, the Director shall transmit a copy of said action to the Soil and Water Conservation District of Gwinnett County and to the property owner.
G. Any person aggrieved by a decision or order of Gwinnett County, after exhausting his or her administrative appeals, shall have the right to appeal de novo to the Superior Court of Gwinnett County.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Chapter 500. Riparian Buffers* Section 500-10. Stream Buffer Protection.
500-10.1 Applicability.
A. Chapter 500 of this UDO shall apply to all land development activity on property containing a stream protection area as defined in Chapter 110 of this UDO. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under State law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under State law or from other applicable local, State or Federal regulations.
B. After April 1, 2005, this Section 500-10 shall apply to new subdividing, land development, and platting activities
500-10.2 Grandfather Provisions. This Section 500-10 of the UDO shall not apply to the following types of applications, but such work shall be subject to the provisions of stream buffer protection regulations in effect at the time of the subject application:
A. Work consisting of the repair, maintenance or replacement within the same disturbed area of any lawful use of land that is zoned and approved for such use on or before the effective date of this UDO.
B. Any lawful land development activity that is under construction, has a valid permit, or has submitted a valid and complete application for a permit as of April 1, 2005, which has not expired.
C. Any lawful land development activity that has not been submitted for approval, but that is part of a larger approved master development plan, such as a house in a subdivision, building in an office park, or planned greenway, which has a valid master plan development permit and a partially or wholly recorded plat prior to April 1, 2005.
500-10.3 Exemptions.
A. The following specific activities are exempt from this Section 500-10, however any activity within a state waters' buffer must meet State requirements:
1. Activities for the purpose of building one of the following:
a. A perpendicular stream crossing by a driveway, transportation route including but not limited to bike paths and pedestrian trails, or utility line.
b. Public water supply intake or public wastewater outfall structures.
c. Land development necessary to provide access to a property.
d. Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the water body, fishing platforms and overlooks.
e. Unpaved foot trails and paths.
f. Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used.
g. Stormwater outfalls to the stream, by pipe or channel, necessary to protect the buffer from erosion caused by high flow velocities due to steep slopes.
2. Public sewer line installation in easements running parallel with the stream where necessary, except that all easements (permanent and construction) and land disturbance within a state waters' buffer must meet State requirements. This includes such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in Subsection 500-10.3A.1., above.
3. Land development activities within a dedicated transportation right-of-way existing at the time this UDO takes effect or approved under the terms of this UDO.
4. Within an easement of any utility existing at the time this UDO takes effect or approved under the terms of this UDO, land-disturbing activities and such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures.
5. Emergency work necessary to preserve life or property. However, when emergency work is performed under this subsection, the person performing it shall report such work to the Department of Planning and Development on the next business day after commencement of the work. Within 10 business days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by the Department of Planning and Development to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area.
6. Forestry and silviculture activities on land that is zoned for forestry, silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be prohibited, then no other land-disturbing activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the buffer.
B. Exemption of these activities does not constitute an exemption for any other activity proposed on a property.
500-10.4 Land Development Requirements.
A. Buffer and setback requirements.
1. All land development activity subject to this UDO shall meet the following requirements:
a. An undisturbed buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank. The land forming the bank is also considered part of the buffer for purposes of this UDO.
b. An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed buffer, in which all impervious cover shall be prohibited including, but not limited to, buildings, parking areas, driveways, and concrete retaining walls. Grading, filling and earthmoving shall be minimized within the setback.
c. No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback.
B. Any land development activity within a buffer established hereunder or any impervious cover within a setback established hereunder is prohibited unless a variance is granted pursuant to Subsection 500-10.4C below.
C. Variance Procedures. Variance requests from the requirements of this Section 500-10 shall be submitted on an application form as prescribed by the Director of the Department of Planning and Development or the Director's designee, along with such fees as shall be established by the Board of Commissioners. The Director of the Department of Planning and Development or the Director's designee shall coordinate the review of each variance request with all other affected County departments and shall forward such comments or recommendations as may be received to the Board of Construction Adjustments and Appeals for action in their normal course of business. This section describes how to apply for a variance from this chapter, however any activity within a state waters' buffer must meet State requirements. Variances may be granted in accordance with the following provisions:
1. The Board of Construction Adjustments and Appeals shall grant no variance from any provision of this UDO without first conducting a public hearing on the application for variance and authorizing the granting of the variance by an affirmative vote of the Board of Construction Adjustments and Appeals. The Department of Planning and Development shall give public notice of each such public hearing in the local organ of Gwinnett County at least once a week for two consecutive weeks before it is heard. The Department of Planning and Development shall require that the applicant post a sign giving notice of the proposed variance and the public hearing at least 15 days prior to the date of the hearing. The sign shall be of a size and posted in right-of-way.
2. No application or reapplication for a variance affecting the same stream segment on a property shall be heard within 12 months from the date of last action by the Board of Construction Adjustments and Appeals unless such 12- month period is waived by the Board of Construction Adjustments and Appeals, and in no case may such application or reapplication be reconsidered in less than six months from the date of last action by the Board of Construction Adjustments and Appeals.
3. Variances will not be considered when, following adoption of this UDO, actions of any property owner of a given property have created conditions of a hardship on that property. Variances will be considered only in the following cases:
a. The applicant provides evidence that impacts to the buffer have been avoided or minimized to the fullest extent practicable.
b. The project involves the construction or repair of a structure that, by its nature, must be located within the buffer. Such structures include dams and detention/retention ponds.
c. Paved recreational foot trails and viewing areas, providing that impacts to the buffer are minimal; or
d. The proposed land-disturbing activity within the buffer will receive a permit from the United States Army Corps of Engineers (USACE) under Section 404 of the Federal Water Pollution Control Act Amendment of 1972, 33 U.S.C. Section 1344, and the Corps of Engineers has received a mitigation plan to be implemented as a condition of such a permit. In addition, land-disturbing activities in the buffer that are outside the USACE's jurisdiction must be mitigated.
e. The buffer intrusion is mitigated using the procedure established in the Gwinnett County Stormwater Management Manual.
f. A valid and complete application for rezoning of the property is submitted prior to the effective date of this UDO and approval of the rezoning by the Board of Commissioners occurs after the effective date of this UDO, and the variance request is consistent with the intent of this UDO factoring into account the property owner's reliance on standards in effect at the time of the rezoning.
4. At a minimum, a variance request shall include the following information:
a. A site map that includes locations of all streams, wetlands, floodplain boundaries and other natural features, as determined by field survey;
b. A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;
c. A dated site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the buffer and setback. The exact area of the buffer to be affected shall be accurately and clearly indicated;
d. Documentation that impacts to the buffer have been avoided or minimized to the fullest extent practicable;
e. A calculation of the total area and length of the proposed intrusion;
f. A stormwater management site plan, if applicable;
g. Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed;
h. A description of the project, with details of the buffer disturbance, including estimated length of time for the disturbance and justification for why the disturbance is necessary;
i. Any other reasonable information related to the project that the Department of Planning and Development may deem necessary to effectively evaluate the variance request;
j. A copy of the permit application, supporting documentation, and proposed mitigation plan as submitted to the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act Amendment of 1972, 33 U.S.C. Section 1344, if applicable;
k. A copy of the permit application, supporting documentation, and proposed mitigation plan as submitted to the Georgia Environmental Protection Division for a variance from the state waters' buffer; and
l. A buffer mitigation plan in accordance with the procedure outlined in the Gwinnett County Stormwater Management Manual.
5. The following factors will be considered in determining whether to issue a variance:
a. The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property.
b. The locations of all streams on the property, including along property boundaries as determined from field inspection.
c. The location and extent of the proposed buffer or setback intrusion.
d. Whether alternative designs are possible which require less intrusion or no intrusion.
e. The long-term and construction water-quality impacts of the proposed variance.
f. Whether issuance of the variance is at least as protective of natural resources and the environment.
g. The value of mitigation activities as calculated in accordance with the Gwinnett County Stormwater Management Manual.
6. Administrative variances may be considered for projects which have water quality impacts which have been determined equal to or less than 0.1 units for the entire project site or development area.
500-10.5 Special Buffer Regulations and Requirements. In addition to the other provisions of Section 500-10, the following requirements shall apply. Whichever provisions are more restrictive or impose higher protective standards for human health or the environment shall take precedence.
The Grandfather Provisions, Exemptions, and Variance Procedures Sections of Section 500-10, Stream Buffer Protection, do not apply to this subsection. Applicable exemptions and variances are given below.
A. Big Haynes Creek and Alcovy River Watershed protection requirements. This Section of this UDO is adopted pursuant to Georgia Department of Natural Resources Rules for Environment Planning Criteria for water supply watersheds (O.C.G.A 391-3-16).
1. Stream buffer zone/impervious surface setbacks shall meet minimum criteria for Large Water Supply Watersheds (O.C.G.A 391-3-16 (6)).
a. Roadways, bridges and drainage structures may encroach upon required buffers and setbacks where such structures are necessary to provide access. Such roadways and bridges shall cross streams perpendicularly where reasonably possible. The number of such stream crossings and associated structures shall be minimized to the greatest extent possible.
b. Limited minor land disturbances, such as trails and picnic areas are exempt.
2. Lots of record. All lots or parcels of record as of the October 28, 1997, in the Big Haynes Creek Watershed and November 28, 2000, in the Alcovy River Watershed and all lots or parcels which have been submitted by way of preliminary plat and approved by the Department of Planning and Development in accordance with the provisions of Title 2 of this UDO, as of October 28, 1997, within the Big Haynes Creek Watershed and November 28, 2000, within the Alcovy River Watershed, that are made unbuildable by the buffer and setback provisions, may still be developed on a case-by-case basis. Requests for development of these lots shall be made to the Director of the Department of Planning and Development as Administrative Variances. If development is allowed, the maximum possible impervious surface setback and stream buffer width, given the configuration of the lot, shall be maintained.
3. Limitation on variances. Variances from the provisions of Subsection A (Big Haynes Creek and Alcovy River Watershed Protection Requirements) are prohibited except as provided by Subsection A.2.
B. Chattahoochee Corridor.
1. Vegetation shall be left in its natural state, and impervious surfaces shall not be permitted, for a distance of 50 horizontal feet as measured from both banks of the Chattahoochee River and its impoundments, and for a distance of 35 horizontal feet as measured from both banks of all other flowing stream channels within the Chattahoochee Corridor, except for footpaths, designated public access areas, river or stream crossings by transportation facilities, public water supply intake structures, public wastewater treatment plant outfalls and utility line crossings.
2. Subject and in addition to the restrictions set forth in Subsection 500-10.5B.1. herein, impervious surfaces and structures shall not be permitted within, on or over any land that is 150 horizontal feet or less from either bank of the Chattahoochee River and its impoundments, except for footpaths, designated public access areas, river or stream crossings by transportation facilities, public water supply intake structures, public wastewater treatment plant outfalls and water supply and sewerage manholes that are designed and built at grade, unless it is determined by the Atlanta Regional Commission, after consideration by a Committee of the Atlanta Regional Commission as authorized by the Atlanta Regional Commission, and based in part upon the affidavit of, and substantial evidence submitted by, a registered professional engineer qualified in water quality and hydrology that the impervious surfaces and structures will not be harmful to the water and land resources of the Chattahoochee Corridor, will not significantly impede the natural flow of flood waters and will not result in significant land erosion, stream bank erosion, siltation or water pollution.
3. Not including the impervious surfaces and structures that are excepted above, any impervious surfaces or structures that, in the judgment of the Atlanta Regional Commission, must legally be permitted within, on or over any land that is 150 horizontal feet or less from either bank of the Chattahoochee River and its impoundments on lots of record as of March 16, 1973, for the portion of the Chattahoochee Corridor between Buford Dam and the downstream limit of the City of Atlanta water intake, which were designated by the local governing authority for a single-family detached residential use, shall meet the following standard: For each one foot incursion into the 150 foot impervious surface buffer, one foot of natural vegetation shall be added to the 50 foot natural vegetation buffer. In the event that the Atlanta Regional Commission determines that legal, physical, biological, or hydrologic conditions on the site prevent the addition of all the required natural vegetation, substitute measures satisfactory to the Atlanta Regional Commission shall be taken to provide an equivalent level of land and water resource protection.
500-10.6 Additional Information Requirements for Development on Buffer Zone Properties. Any permit applications for property requiring buffers and setbacks hereunder must include the following:
A. A site plan showing:
1. The location of all streams on the property.
2. Limits of required stream buffers and setbacks on the property.
3. Buffer zone topography with contour lines at no greater than 2-foot contour intervals.
4. Delineation of forested and open areas in the buffer zone.
5. Detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback.
B. Description. A description of all proposed land development within the buffer and setback.
C. Documentation. Any other documentation that the Department of Planning and Development may reasonably deem necessary for review of the application and to ensure that the buffer and landscaping requirements are addressed in the approval process. All buffer and setback areas must be recorded on the final plat of the property following plan approval.
500-10.7 Responsibility. Neither the issuance of a development permit nor compliance with the conditions thereof, nor with the provisions of this UDO shall relieve any person from any responsibility otherwise imposed by law for damage to persons or property; nor shall the issuance of any permit hereunder serve to impose any liability upon Gwinnett County, its officers or employees, for injury or damage to persons or property.
500-10.8 Inspection.
A. The Department of Planning and Development may cause inspections of the work in the buffer or setback to be made periodically during the course of work and shall make a final inspection following completion of the work. The permittee shall assist representatives of the department in making such inspections. The Director of the Department of Planning and Development or the Director's designee shall have the authority to conduct such investigations as he or she may reasonably deem necessary to carry out the duties as prescribed in this UDO, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the protection area.
B. No person shall refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out official duties.
500-10.9 Violations, Enforcement, and Penalties. Any action or inaction that violates the provisions of Section 500-10 shall be subject to the enforcement actions and penalties identified in Chapter 120 of this UDO.
500-10.10 Administrative Appeal and Judicial Review.
A. Administration. This Chapter of the UDO shall be administered, interpreted, and enforced by the Director of the Department of Planning and Development or the Director's designee.
B. Administration appeal. Appeals of the interpretation by the Director of the Department of Planning and Development or the Director's designee of the requirements of this Chapter of the UDO shall follow the procedures outlined in Section 270-90 of this UDO.
500-10.11 Fees.
A. Application filing, permit, inspection, and other fees shall be established from time-to-time by the Board of Commissioners.
B. Permit fees, if any, shall be submitted as a prerequisite to issuance of the permit. Nonpayment as a result of submission of a check having insufficient funds on account, or for any other reason, shall cause the permit to be voided and re-issuance subject to penalty as may be established by the Board of Commissioners.
C. Application fees, if any, shall be submitted with the application and upon acceptance of said submission for review and consideration shall not be refundable. Failure to pay a required application fee shall cause the application to be returned to the applicant without acceptance for review or consideration by the County.
D. Following the approval of development plans, and prior to authorization to begin construction, the developer shall provide the Department of Water Resources with mitigating fees. Such fees shall not be refundable following issuance of a development permit, except upon approval of the Board of Commissioners.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 40), 9-26-2023) Section 500-20. Other Riparian Buffers.
500-20.1 Wetlands.
A. Section 500-20.1 of this UDO shall apply to all new land development activity, not part of a previously approved master plan, on property containing wetlands as defined in Chapter 110 of this UDO with undisturbed designation. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under State law and approval or exemption from these requirements does not constitute approval or exemption from buffer requirements established under State law or from other applicable local, State or Federal regulations.
B. Construction Buffer Requirements. A temporary construction buffer shall be maintained for 10 feet, measured horizontally, from the outer most perimeter of areas delineated as undisturbed wetlands.
500-20.2 Lakes.
A. Section 500-20.2 of this UDO shall apply to all new land development activity, not part of a previously approved master plan, on property containing a lake defined in Chapter 110 of this UDO. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under State law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under State law or from other applicable local, State or Federal regulations.
B. Undisturbed Buffer Requirements. An undisturbed State Waters buffer shall be maintained for 25 feet, measured horizontally, from the water surface edge and including banks with wrested vegetation.
C. Construction Buffer Requirements. A temporary construction buffer shall be maintained for 10 feet, measured horizontally, from the undisturbed State water buffer.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 40), 9-26-2023) Chapter 600. Buffers, Landscaping and Tree Protection General Provisions* Section 600-10. Intent.
Chapters 600 through 640 of this UDO shall apply to all properties or portions thereof located within the unincorporated areas of Gwinnett County, Georgia, to the extent of the provisions contained herein. The Board of Commissioners hereby finds that the protection and preservation of trees, the planting of new trees and other landscape material, and the provision of buffers between dissimilar uses as part of the land development process is a public purpose and provides for the public health and general welfare.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 41), 9-26-2023) Section 600-20. Purpose.
600-20.1 The purpose of Chapters 600 through 640 of the UDO is to preserve and enhance the County's natural environment. This is accomplished through the preservation, protection and planting of trees and other landscape material, particularly those trees recognized herein as canopy and small trees, and the provision of natural and/or planted buffers between dissimilar uses as part of the land development process, as required by Title 2 of this UDO.
600-20.2 Chapters 600 through 640 of the UDO are intended to further the County's policy that all development sites where trees are most commonly removed will achieve upon project completion a uniform standard related to tree coverage, landscaping, and buffers. In addition, trees are recognized for their importance in shading and cooling, noise and wind reduction, prevention of soil erosion, production of oxygen, dust filtration, fostering air quality through carbon dioxide absorption, providing wildlife habitat, and contributing to the aesthetic and economic value of real property.
600-20.3 Chapters 600 through 640 of the UDO are also intended to further the County's policy of encouraging all individuals or firms who propose to develop land, and which are required to meet the requirements of this UDO, to consider the use of water-efficient landscaping principles and techniques (xeriscaping).
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 41), 9-26-2023) Chapter 610. Buffers* Section 610-10. Applicability.
600-10.1 Buffers shall be required between dissimilar districts or uses in accordance with the provisions of Title 2 of this UDO or as a condition of zoning, special use, or variance approval as provided in Chapter 270.
600-10.2 Buffers shall be established and maintained along required property lot lines in accordance with the landscaping policies and standards of this Chapter and any additional specifications that may be established by the Department of Planning and Development and approved by the Board of Commissioner
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 42), 9-26-2023) Section 610-20. Standards for Permanent Buffers.
610-20.1 Requirements.
A. In the event the buffer includes a utility or pipeline easement, a minimum buffer of no less than 20 feet in width will be required outside the easement. In no case will the buffer be less than 20 feet.
B. In cases in which both a buffer and landscape strip are required along the same lot line, the width of the required landscape strip shall be counted as part of the required buffer width. When a landscape strip tree is within the buffer it may be counted toward Tree Density Units.
610-20.2 Buffer Screening.
A. Buffers shall meet minimum screening requirements. Screening and/or buffers shall be required for purposes of obscuring features such as but not limited to, dumpsters, rear entrances, utility, and maintenance structures, and loading facilities.
B. Buffers shall be natural, undisturbed, and free of encroachments except as authorized by a condition of zoning, special use or variance approval, or as authorized herein, and shall contain the existing tree cover and vegetation as well as any supplemental plantings or replantings as may be required.
C. Buffers shall be of such nature and density so as to screen activities, structures and uses on the property from view from the normal level of a first story window on an abutting lot and shall further provide a year-round effective visual screen.
D. Screening shall be established within any buffer along the entire length of the property lines. However, this screening requirement may be adjusted in order to observe the sight distance required in this UDO or as a condition of zoning, special use, or variance approval or as approved by the Director.
E. Buffers required adjacent to side property lines shall extend to a street right-of-way line unless otherwise required by the Director in order to observe the sight distance requirements contained in this UDO, or as authorized by a condition of zoning, special use, or variance approval.
F. In situations where the required buffer width is partially or completely contained within an existing easement (e.g., power, or natural gas transmission, etc.), the screening requirements of this UDO shall be met outside of the easement area per Section 610-20.1.A.
G. Additional screening shall be required where a nonresidential use abuts a public street across from a residential district. For specifics on additional screening, see Section 610-20.5. However, this screening requirement may be adjusted in order to observe the sight distance required in this UDO or as a condition of zoning, special use, or variance approval or as approved by the Director.
610-20.3 Buffer Plan Standards and Structure Setbacks.
A. All buffers shall be designated on the appropriate permit application(s) and indicated on the required site plan or final subdivision plat.
B. All proposed improvements including, but not limited to, driveways, dumpsters, parking facilities, pavement, or retaining walls will be located a minimum of 5 feet from any buffer.
610-20.4 Reserved.
610-20.5 Non-Vegetative Screening.
A. Non-vegetative materials used to satisfy the screening requirements of this UDO, in addition to the use of existing vegetation and/or supplemental plantings, may consist of walls, fences, earthen berms or any combination thereof.
B. If walls or fences are to be used, their placement and installation shall be such so as to cause minimal disturbance of existing vegetation and located so as to provide an effective visual screen.
610-20.6 Supplemental Plantings.
A. Buffers in which vegetation is non-existent or is inadequate to meet the screening requirements of this UDO shall be supplemented with trees and shrubs to provide an effective year-round visual screen and shall be planted per the ratios as specified in paragraph G. below.
B. Buffers required as a condition of zoning, variance, or waiver, whether they are an enhanced or a landscaped buffer, shall be planted per the ratios as specified in paragraph G. below.
C. Buffer plantings shall consist of a combination of evergreen and deciduous trees and evergreen shrubs adaptable to the region. Deciduous trees shall be a minimum of 2 inches in caliper and evergreen trees shall be a minimum of 6 feet in height at time of planting. All shrubs shall be of a large growing species and chosen from the approved Gwinnett County Shrub Species List, listed in Section 4.0 of the Appendix, shall be a minimum of 3 feet in height at time of planting, and shall be a species which will achieve a height of at least 10 feet at maturity.
D. Trees, shrubs, grasses, and ground covers identified in the Gwinnett County Prohibited Plant Species List in Section 4.0 of the Appendix are invasive plant species and shall not be planted in buffers.
E. No genus of tree shall comprise more than 33 1/3 percent of plantings in any buffer. Calculations are required to be shown on Tree Preservation and/or Tree Replacement Plan.
F. Leyland Cypress, Cuppressus leylandii may be used in supplemental replanting in buffers but shall not exceed 33 1/3 percent of total buffer trees. Leyland Cypress trees are not allowed to fulfill regulatory density requirements but may be used for screening purposes.
G. Trees planted in buffers shall be small, medium, or large trees chosen from the Gwinnett County Tree Species List in Section 4.0 of the Appendix. Shrubs planted in buffers shall meet the specifications as outlines in paragraph C. above. Both trees and shrubs shall, at a minimum, meet the following ratios.
Calculation results shall be rounded up:
A. Qty. one (1) large hardwood tree per 2,000 sq. ft.
B. Qty. one (1) large evergreen tree per 1,000 sq. ft.
C. Qty. one (1) small or medium ornamental tree per 700 sq. ft.
D. Qty. one (1) large evergreen shrub per 200 sq. ft.
H. Example 1: The requirement is for an enhanced buffer that is 450 lineal feet and 50 ft. in width in which 70% of the buffer is heavily wooded and 30% is sparse and devoid of vegetation. Therefore 6,750 sq. ft. of buffer area must be planted with the following quantity of plants:
1. 6,750/2,000 = 3.375 = 4 large hardwood trees
2. 6,750/1,000 = 6.75 = 7 large evergreen trees
3. 6,750/700 = 9.64 = 10 small or medium ornamental trees
4. 6,750/200 = 33.75 = 34 large evergreen shrubs
I. Example 2: The requirement is for a landscaped buffer that is 450 lineal feet and 50 ft. in width. Therefore 22,500 sq. ft. of buffer area must be planted with the following quantity of plants:
1. 22,500/2,000 = 11.25 = 12 large hardwood trees
2. 22,500/1,000 = 22.5 = 23 large evergreen trees
3. 22,500/700 = 32.14 = 33 small or medium ornamental trees
4. 22,500/200 = 112.5 = 113 large evergreen shrubs (deciduous shrubs in a landscaped buffer may comprise a maximum of 25% of the shrubs)
J. Supplemental plantings shall be spaced and installed to allow for proper plant growth and maintenance.
610-20.7 Disturbance or Encroachments.
A. Ditches, swales, storm water conveyance facilities, storm water detention ponds, sanitary sewer conveyance facilities, similar facilities, and any associated easements, shall not encroach into a buffer except that necessary access and utility crossings (e.g., storm water or sanitary sewer pipes) may encroach into the buffer as near to perpendicular as practical.
B. Driveways and sidewalks shall not encroach into a buffer except that necessary access crossings may encroach into the buffer as near to perpendicular as practical.
C. Supplemental plantings or replanting's of vegetation, or authorized non-vegetative screening devices may encroach into a buffer provided there is minimal disturbance of any significant existing vegetation.
D. Fences are authorized in a buffer provided minimal disturbance occurs. Live trees shall not be removed for the placement of the fence.
E. Land disturbance is authorized per Director approval in areas of a buffer that are devoid of significant vegetation provided that the final grade and replanting of vegetation meet the screening requirements contained herein.
F. Dying, diseased or dead vegetation may be removed from a buffer provided minimal disturbance occurs.
Vegetation thus removed shall be replaced where necessary to meet the screening requirements contained herein.
G. Greenway paths or trails as identified in the official Gwinnett Trails Countywide Trails Plan are authorized in the buffer. The greenway path or trail shall be located so as to minimize encroachment in the buffer. In cases where there is not adequate existing vegetation to provide an effective year-round visual screen, supplemental plantings shall be planted between the greenway and the property line. When the greenway does not allow adequate space to supplemental plant inside the buffer, vegetation may be planted outside of the buffer.
610-20.8 Protection during Land-Disturbing Activities.
A. During authorized land-disturbing activities, undisturbed buffers shall be clearly demarcated and protected prior to commencement of, and during, construction.
B. The method of demarcation and protection used shall be in accordance with best management practices.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 42), 9-26-2023) Section 610-30. Standards for Construction Buffers.
610-30.1 Where Required. Construction buffers shall only be required where specifically provided as a condition of zoning, special use or variance approval.
610-30.2 Time Constraints. Construction buffers shall only be in effect during the construction period of a project and shall terminate upon project completion. In the case of a residential subdivision, a construction buffer shall terminate upon each individual lot with the issuance of a Certificate of Occupancy for the principal dwelling.
610-30.3 Disturbance or Encroachments.
A. Construction buffers shall be natural, undisturbed, and free of encroachments except as authorized by a condition of zoning, special use or variance approval, or as authorized herein.
B. The encroachment of ditches, swales, storm water conveyance facilities, stormwater management facilities, sediment basins, sanitary sewer conveyance facilities, similar facilities, and any associated easements, into a construction buffer shall not be authorized except that necessary access and utility crossings (e.g., stormwater or sanitary sewer pipes), and natural bottom detention ponds (sediment basins must be located outside of the construction buffer) and their appurtenant structures which require no grading and removal of trees, may encroach upon the construction buffer.
C. If the construction buffer on a residential lot is devoid of existing trees and vegetation, and a tree survey is submitted to document this situation prior to conducting land-disturbing activities (including clearing) on the lot, then the Department may authorize the encroachment of a building or structure into the construction buffer for a distance not to exceed 10 feet.
610-30.4 Protection during Land-Disturbing Activities.
A. During authorized land-disturbing activities, construction buffers shall be clearly demarcated and protected prior to commencement of, and during, construction.
B. The method of demarcation and protection used shall be in accordance with best management practices.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 42), 9-26-2023) Chapter 620. Landscape Regulations* Section 620-10. Applicability.
620-10.1 Nonresidential, Multi-family developments; and areas of commercial and civic uses of Traditional Neighborhood (TND) zoning districts shall provide for and maintain landscape plantings on-site as follows:
A. A Landscape Strip at least 10 feet in width adjacent to any street right-of-way abutting the property and running the length of the entire property frontage.
B. Trees are required for parking lots with five off-street parking spaces or more and may be planted in areas adjacent or internal to off-street parking lots.
C. Other landscape Strips, if required, by a condition of zoning, special use or variance approval.
620-10.2 The Director is hereby authorized to grant a modification of up to 20 percent of the 10-foot landscape strip width provided the strip is not required by a condition of zoning, special use, modification, variance, or waiver approval.
620-10.3 Topping trees is not allowed. Trees removed or having had their tops cut after compliance with this UDO shall be replaced with the equivalent inches of removed trees.
A. Trees removed due to death, disease, or insect infestation shall be replaced in accordance with the minimum standards contained in Chapter 630.
B. Appropriate pruning and healthy tree management shall be according to the standards as followed by the International Society of Arboriculture.
620-10.4 Residential Subdivisions. Residential subdivisions shall provide for and maintain landscape plantings on site as set forth in Section 620-60 and 620-70; and in the following circumstances:
A. In no-access easements that are required by this UDO along the line of double frontage lots abutting upon a major thoroughfare.
B. As required by a condition of zoning, special use, modification, variance, or waiver approval.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-20. Landscape Strip Planting Requirements.
620-20.1 Minimum Requirements for Landscape Strips.
A. Landscape Strips shall be provided in conformity with the Guidelines for Landscape Strips provided in the UDO Section 4.0 of the Appendix and all other requirements of this Chapter 620.
B. Landscape strips shall be provided as required by Section 620-10.1.
C. Driveway widths and other ingress and egress areas may be subtracted from the landscape strip lineal feet calculation.
D. Utility easement widths that run perpendicular shall not be subtracted from the landscape strip lineal feet calculation. Utility easements that run parallel to the landscape strip shall be located outside of the landscape strip.
E. Shrubs planted to meet regulatory requirements shall be selected from the Shrub Species List, in Section 4.0 of the Appendix.
F. Trees, shrubs, grasses, and ground covers listed in the Prohibited Plant Species List in Section 4.0 of the Appendix are invasive plant species and shall not be used to meet landscape strip requirements.
620-20.2 Ten-Foot-Wide Landscape Strips.
A. Proposed developments, other than single-family detached developments in single-family residential districts, shall include at a minimum a 10-foot-wide landscape strip. The landscaping and shrub plantings within or adjacent to the strip shall contain as follows:
1. One tree for each 40 linear feet of strip length shall be provided. Deciduous trees shall be at least 2 inches caliper and evergreen trees shall be 6 feet in height at time of planting. Trees shall be a species native or suitable to this region as provided in the Tree Species List in Section 4 of the Appendix.
2. One evergreen shrub, for each 4 linear feet of strip length shall be provided. Each shrub shall be a species native or suitable to this region as provided in the Shrub Species List in Section 4.0 of the Appendix.
B. Trees and shrubs required herein may be planted and spaced singly or in groups so long as the total number of trees and shrubs are achieved
C. The remaining ground area shall be sodded, seeded or hydroseeded with turf, and/or planted with groundcover species and/or provided with other landscaping material, or any combination thereof.
620-20.3 Five-Foot-Wide Landscape Strips.
A. If required by zoning, landscape strips which are required to be 5 feet in width shall contain landscaping and plantings within or adjacent to the strip as follows:
1. One tree for each 50 linear feet of strip length shall be provided. Deciduous trees shall be at least 2 inches caliper and evergreen trees shall be at least 6 feet in height at time of planting. Trees shall be a species native or suitable to this region as provided in the Tree Species List as in Section 4.0 of the Appendix.
2. One evergreen shrub for each 8 linear feet of strip length shall be provided. Each shrub shall be a species native or suitable to this region as provided in the Shrub Species List in Section 4.0 of the Appendix.
B. Trees and shrubs required herein may be planted and spaced singly or in groups so long as the total number of required trees and shrubs are achieved.
C. The remaining ground area shall be sodded, seeded or hydroseeded with turf, and/or planted with groundcover species and/or provided with other landscaping material, or any combination thereof.
620-20.4 Landscape Strips Wider than 10 Feet. Tree and shrub quantities in landscape strips that are required to be wider than 10 feet by a condition of zoning, special use, variance or waiver approval shall be proportional in width to the requirements listed above for 10-foot wide landscape strips (e.g. a 20 foot wide landscape strip would require two trees for every 40 linear feet of strip length and two shrubs, quadruple row spaced, for each 4 linear feet of strip length).
620-20.5 Encroachments into Landscape Strips. Required Landscape Strips shall not be encroached upon by parking spaces, driveway surfaces or stormwater management facilities except that driveway crossings and sidewalks may traverse such strip as near to a perpendicular alignment as practical. Ground signs, walls and the two foot by eight-foot concrete pad used for benches and trash receptacles in Overlay Districts may be located in such strip.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-30. Off-Street Surface Parking Lot Planting Requirements.
620-30.1 Quantity, Spacing and Planting Standards.
A. Off-street surface parking lots which are required to contain more than five parking spaces shall contain landscaping and plantings as follows:
1. Trees shall be provided and maintained adjacent to, and in the interior portions of, parking lots in a ratio of one tree for each seven parking spaces. In addition, every parking space shall be within 60 feet of the trunk of a tree.
2. Deciduous trees shall be at least 2 inches caliper and evergreen trees shall be at least six feet in height at time of planting. Canopy trees listed in the Tree Species List in Section 4.0 of the UDO Appendix, shall be selected, planted, and maintained. Any plantings beyond the minimum requirements may come from any of the Tree Species Lists included in Section 4.0 of the UDO Appendix.
B. The minimum planting area or island for each canopy tree shall be at least 400 square feet. If shared with other trees, 100 square feet for each additional tree shall be added.
C. Trees shall be planted in areas surrounding the perimeter of the parking lot and/or shall be planted in planting areas or islands internal to the parking lot. Trees may be planted and spaced singly or in groups.
Each planting area or island shall not be less than four feet in width in any direction.
D. The use of at-grade planting areas in parking lots to promote stormwater runoff treatment and to supplement irrigation needs is encouraged; provided that the trees planted there will not be adversely impacted, and that the system is designed by a licensed, professional civil engineer in accordance with the Gwinnett County Stormwater Management Manual.
E. Newly planted trees and existing trees subjected to construction impacts typically need supplemental watering when rainfall is inadequate. Commercial project applicants should be prepared to discuss how trees are to be watered during their establishment or transition period, and to possibly note on the plan the proposed method of irrigation.
F. Parking lot islands, peninsulas and medians must have clean, cultivated soil to a total depth of two and one-half (2½) feet. Native subsoil is acceptable in parking lot islands, peninsulas, and medians if the entire area is amended with appropriate soil improvements and thoroughly tilled.
G. Ground areas shall be sodded, seeded or hydro-seeded with grass and/or planted with groundcover species, and/or provided with other landscaping material, or any combination thereof.
H. Paved or striped islands greater than 50 square feet shall not be allowed. These areas shall contain landscape plantings.
I. Parking lot lights and light poles are prohibited in landscape islands containing trees and are allowed in landscape islands containing shrubs.
J. The Director is hereby authorized to grant a modification of tree species in cases where parking lot trees are located under power easements.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-40. Street Tree Requirements in Non-residential Zoning Districts.
A. Street trees shall be provided by the developer in non-residential zoning districts under the following conditions:
1. In Overlay Districts along the right-of-way of the streets listed in Section 220-30.3D.4.
2. In zoning districts MU-N, MU-C, and MU-R.
3. As a condition of zoning.
B. When street trees are required in non-residential zoning districts the following regulations shall apply:
1. Street trees shall be located along the property frontage, either inside or outside of the right-of-way, in no case closer than 11 feet to the edge of pavement or back of curb. When the street trees are proposed inside the right-of-way, they shall be located outside of the clear zone per the current edition of the AASHTO Roadside Design Guide subject to Department of Transportation approval.
2. One tree per 50 linear feet of property frontage (both sides of street) shall be provided.
3. Street trees in Overlay Districts shall be selected from the Large Tree Species list in the UDO Appendix and shall be 3 inches caliper at time of planting.
4. Street trees shall be spaced as evenly as possible along the property frontage to create a unified and repetitive tree canopy at maturity with consideration given to lighting, underground utility placement, and utility easements.
5. Underground utilities are required when planting street trees.
6. Provide a minimum 200 square feet planting area per street tree. When 200 square feet of planting area is not possible, for example, in a streetscape setting, tree pits shall be utilized.
C. Prior to the issuance of a development permit a street tree plan shall be submitted for review and approval.
1. Street tree plan must show compliance with the above requirements and include details for hardscape, paver stones, landscape area, ground cover, tree grates, tree pits, and soil composition.
2. Street tree plan shall be reviewed and approved by the GCDOT for County maintained roads and by the GDOT for State Highways.
D. Street trees shall be planted as follows:
1. The owner/developer shall be responsible for planting of street trees on common area prior to the approval of the Final Plat.
2. The lot owner/developer shall be responsible for the planting of street trees in front of the affected lots prior to the issuance of a Certificate of Occupancy.
E. Street trees shall be cared for and maintained by the owner of the property on which they are located, except in developments where the property owners association provides maintenance and care.
F. A Right-of-Way Encroachment Maintenance Agreement shall be provided by the developer for street trees located within the right-of-way.
G. A maintenance responsibility statement shall be provided on the Final Plat that describes who is responsible for the maintenance and replacement of street trees and trees located in common areas.
H. When a Final Plat is not required the maintenance responsibility statement shall be provided on the Site Development Plan.
I. Street tree maintenance shall include replacement and pruning as necessary. Pruning and tree management shall be in accordance with standards of the International Society of Arboriculture.
J. The Director is hereby authorized to grant a modification for street tree location and genus and species variation.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-50. Tree Requirements in Single Family Attached Residential Zoning Districts.
In single family attached residential zoning districts developers shall comply with this Section by providing 16 Tree Density Units per acre as indicated in Section 630-30.5.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-60. Tree Requirements in Single Family Detached Residential Zoning Districts R-75 MOD, R-60, TND, R-SR, or R-ZT.
In single-family detached residential zoning districts listed above developers and homebuilders shall comply with this Section by planting street trees or two trees per lot and by providing 16 Tree Density Units per acre as indicated in Section 630-30.5.
A. When the lot trees option is selected in order to comply with this Section, individual lot trees shall be provided or preserved on each lot within the subdivision.
B. When the street tree option is selected in order to comply with this Section, street trees shall be provided.
C. Sixteen Tree Density Units per acre shall be provided.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-65. Tree Requirements in Single-Family Detached Residential Zoning Districts R-100 CSO, R-75 CSO and OSC.
In single-family detached residential zoning districts listed above developers and homebuilders shall comply with this Section by planting street trees and by providing 16 Tree Density Units per acre as indicated in Section 630-30.5.
A. Street trees shall be provided. Refer to Section 620-75.B for street tree requirements.
B. Sixteen Tree Density Units per acre shall be provided.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-70. Tree Requirements in Single Family Detached Residential Zoning Districts RA-200, R-100, R-75, or
R-100 MOD.
In single family detached residential zoning districts listed above, developers and homebuilders shall comply with this Section by planting street trees, by planting two trees per lot, and by providing 16 Tree Density Units per acre as indicated in Section 630-30.5.
A. Individual lot trees shall be provided or preserved on each lot within the subdivision.
B. Street trees shall be provided.
C. Sixteen Tree Density Units per acre shall be provided.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-75. Tree Requirements in Residential Zoning Districts.
Prior to the issuance of a development permit a Tree Preservation and/or Replacement Plan shall be submitted for review and approval that shows compliance with the tree requirements.
A. When planting lot trees in residential districts the following regulations shall apply:
1. Two trees per lot shall be provided or preserved in the front, side, or rear yard provided trees are not located in utility easements, drainage easements, or septic drain fields.
2. Homebuilder shall be responsible for planting or preserving the individual lot trees prior to the issuance of a Certificate of Occupancy.
3. Lot trees shall be selected from the Tree Species List in the UDO Appendix and shall be at least 2-inch caliper at time of planting.
B. When planting street trees in residential zoning districts the following regulations shall apply:
1. Underground utilities are required.
2. One tree per 50 linear feet of street (both sides of street) shall be provided.
3. Street trees shall be located outside of the street right-of-way, within 5 feet of the right-of-way.
4. Street tree spacing in residential subdivisions where street trees are required shall be spaced at about 35-40 feet centers and located a minimum of 30-50 feet from intersecting streets and a minimum of about 40 feet from streetlights as depicted in the UDO Appendix Section 4.0, unless otherwise indicated in this UDO.
4. Street trees shall be selected from the Tree Species List in the UDO Appendix and shall be at least 3-inch caliper at time of planting.
5. Maximum allowable genus of street trees shall be 33 percent of entire subdivision or one genus per street.
6. Prior to permit issuance an overall street tree plan shall be submitted for review and approval that indicates the location; size; genus, species, and variety; genus percentages, and planting details. The street tree plan may be a part of the Tree Preservation and/or Replacement Plan.
7. The developer shall be responsible for the planting of street trees on common area and conservation space lots prior to the approval of the Final Plat.
8. The homebuilder shall be responsible for the planting of street trees in front of the affected individual lots prior to the issuance of a Certificate of Occupancy.
9. Street tree planting shall be delayed from June through August.
10. Street trees shall be maintained and cared for by the property owner except in subdivisions in which the property owner's association provides maintenance and care. Maintenance shall include replacement and trimming as necessary. Pruning and tree management shall be in accordance with standards of the International Society of Arboriculture.
C. When 16 Tree Density Units per acre is required, the following regulations shall apply:
1. Density may be achieved by preserving existing trees, planting new trees, or a combination of the two methods.
2. Prior to permit issuance of a development permit a Tree Preservation and/or Replacement Plan shall be submitted, for review and approval that shows compliance with the tree requirements.
3. Trees planted to meet the two trees per lot and/or street tree requirement may be counted toward the tree density unit requirement.
4. New trees shall be selected from the Gwinnett County Tree Species List in the UDO Appendix and shall be a minimum of 2-inch caliper at time of planting. Existing trees shall be a minimum of 3 inches in diameter.
5. Preserved trees counted toward meeting the Tree Density Units shall be protected with Tree Protection Fence at the dripline or critical root zone (whichever is greater) prior to the start of construction.
D. A maintenance responsibility statement shall be provided on the Final Plat that describes who is responsible for the maintenance and replacement of lot trees, street trees, and trees located in common areas.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Section 620-80. No Access Easement Screening Requirements.
620-80.1 When no-access easements are required by the UDO the developer may choose from the following:
A. Six-foot-high opaque fence.
B. A single row of evergreen trees spaced no greater than 10 feet apart.
620-80.2 When a 5-foot landscape strip with a 6 feet in height screening wall (Type 4 landscape strip) is required for a no-access easement as a condition of zoning the developer shall provide the following:
A. Planted with a single row of street trees spaced every 50 linear feet of landscape strip and small evergreen shrubs spaced one shrub for every 8 linear feet of landscape strip.
620-80.3 When a 10-foot landscape strip with a 10 feet in height masonry screening wall (Type 5 landscape strip) is required for a no-access easement as a condition of zoning the developer shall choose from the following:
A. Planted with a single row of street trees spaced every 40 linear feet and evergreen shrubs that reach 10 feet in height at maturity spaced every 6 linear feet; or,
B. Planted with a single row of evergreen trees at least 6 feet in height at time of planting and spaced no greater than 10 feet apart; or,
C. Contain such other landscaping treatments or grade changes that will produce a partial screening effect as authorized by the Director.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 43), 9-26-2023) Chapter 630. Tree Preservation and Replacement Regulations* Section 630-10. Applicability and Exemptions.
630-10.1 Applicability. This Chapter shall apply to any activity on real property which requires the issuance of a Development or Land Disturbance Permit except as otherwise excluded in accordance to Table 630.1 Summary of Applicability and Exemptions at the end of this section, or as described herein. In applicable cases where the Gwinnett County Board of Commissioners has approved a streetscape plan, its provisions shall supersede the minimum requirements of those set forth in Section 630-20.4.B.
630-10.2 Grandfathered Projects.
A. In no event shall any grandfather clause be extended to permits that have not started and expired or are unfinished and expired for a greater time period than 24 months from the date of enactment of this UDO.
B. For those projects where a development permit was issued and where development was completed prior to the effective date of this UDO and is proceeding with additional development on a portion of the property see Section 630-90 for re-development thresholds.
630-10.3 Horticultural or Agricultural Operations.
A. All land-disturbing activities associated with plant or tree nurseries and botanical gardens shall be exempt from the terms and provisions of this Chapter in relation to those trees which are being grown for relocation and continued growth in the ordinary course of business, or for some public purpose.
B. All land-disturbing activities associated with orchards of trees in an active commercial operation shall be exempt from the terms and provisions of this Chapter for bona fide agricultural purposes only.
630-10.4 Removal of Disease or Insect Infestation. Upon the written advice of the Gwinnett County Cooperative Extension Service, the Georgia Forestry Commission, or a certified arborist, in accordance with commonly accepted forestry practices and a finding of disease or insect infestation, the Director may authorize the removal of trees to prevent the transmission of disease or infestation, to prevent the danger of these trees falling, or to prevent potential injury to life and property. The owner/developer, prior to the removal of these trees, shall notify the Director, identifying the location of the property where the infested trees are and shall submit to the Director the written finding of the County Extension Service, Georgia Forestry Commission, or certified arborist. The applicant shall also meet the site requirements below.
A. The property shall be required to meet a Tree Density Standard of 24 units per acre upon completion of authorized removal of diseased or insect infested trees. If applicable, a Tree Preservation and/or Tree Replacement Plan may be required to show compliance with 24 tree density units per acre.
B. Specimen trees that meet the identification criteria and are not diseased or insect infested shall be preserved and protected as outlined in Section 630-70.
C. The owner/developer shall use the recommended Best Management Practices (BMP's) as established by the Georgia Forestry Commission.
630-10.5 Site Requirements for Limited Land-Disturbing Activities.
A. Permits authorizing limited land-disturbing activities shall be required to follow these additional site requirements:
1. In zoning districts other than RA-200, properties which are not under the authorization of a Final Plat, and which exceed 1 acre in size, disturbance shall be authorized only in accordance with the issuance of a land disturbance permit and shall require the submittal and approval of a Tree Preservation and/or Replacement Plan.
2. A 50-foot undisturbed buffer (not a zoning buffer) shall be provided and maintained along the entire perimeter of the property, including road frontages, during the land-disturbing activity, except for authorized access crossings.
3. The property shall be required to meet a Tree Density Standard of 24 units per acre upon completion of authorized land-disturbing activities. The 50-foot perimeter buffer and specimen trees may be counted toward meeting the 24 tree density units per acre.
4. The owner/developer shall use the recommended Best Management Practices (BMP's) as established by the Georgia Forestry Commission.
630-10.6 Tree Thinning. Upon the written advice and findings of the County Extension Service, Georgia Forestry Commission, or a certified arborist, the thinning of trees (selective cutting only) in zoning districts other than RA-200, solely for the purpose of good forestry management, if permitted per zoning condition, shall require the submittal and approval of a land disturbance permit and a Tree Preservation and/or Replacement Plan. The applicant shall also meet the following requirements:
A. A 50-foot undisturbed buffer (not a zoning buffer) shall be provided and maintained along the entire perimeter of the property, including road frontages, during the land-disturbing activity, except for authorized access crossings.
B. The property shall be required to meet a Tree Density Standard of 24 units per acre upon completion of authorized land-disturbing activities. The 50-foot perimeter buffer and specimen trees may be counted toward meeting the 24 tree density units per acre. If applicable, a Tree Preservation and/or Replacement Plan may be required to show compliance with 24 tree density units per acre.
C. Specimen trees that meet the identification criteria shall be preserved and protected as outlined in Section 630-70.
D. The owner/developer shall use the recommended Best Management Practices (BMP's) as established by the Georgia Forestry Commission.
630-10.7 Timber Harvesting. Timber harvesting (selective cutting or clear-cutting) for pulpwood or sawtimber shall be exempt within the RA-200 zoning district. In other zoning districts, properties which are not under the authorization of a Final Plat, and which exceed 1 acre in size, timber harvesting shall be authorized only in accordance with the issuance of a land disturbance permit and shall require the submittal and approval of a Tree Preservation and/or Replacement Plan, and shall also meet the following requirements:
A. A 50-foot undisturbed buffer (not a zoning buffer) shall be provided and maintained along the entire perimeter of the property, including road frontages, during the land-disturbing activity, except for authorized access crossings.
B. The property shall be required to meet a Tree Density Standard of 24 units per acre upon completion of authorized land-disturbing activities. The 50-foot perimeter buffer and specimen trees may count towards meeting the 24 tree density units per acre.
C. Specimen trees that meet the identification criteria shall be preserved and protected as outlined in Section 630-70.
D. The owner/developer shall use the recommended Best Management Practices (BMP's) as established by the Georgia Forestry Commission.
TABLE 630.1 Summary of Applicability and Exemptions.
Project Type Type of Construction Applicability Grandfathered Projects In no event shall any grandfather clause be extended to permits that have not been started and expired, or are unfinished and expired, for a greater time period than 24 months from the date of enactment of this UDO. For those projects where a development permit was issued and where development was completed prior to the effective date of this UDO and is proceeding with additional development on a portion of the property see Section 630-90 for re-development thresholds.
Exempt (see 630-10.2.)
Horticultural or Agricultural Operations Land clearing for clearly agricultural purposes, including Plant or Tree Nurseries; Orchards Exempt (see 630-10.3.)
Diseased or Insect Infested Trees Removal upon advice and written finding of County Cooperative Extension Service, Georgia Forestry Commission, or Certified Arborist.
TP/RP Required (see 630- 10.4.)
Tree Thinning Thinning of trees (selective cutting) in zoning districts other than RA-200 solely for the purpose of good forestry management, utilizing recommended BMP's of the Georgia Forestry Commission, upon the advice and written findings of the County Extension Service, Georgia Forestry Commission, or Certified
Arborist.
TP/RP Required (see 630- 10.6.)
Timber Harvesting Properties which are not under the authorization of a Final Plat which exceed 1 acre in size, timber harvesting shall be authorized
only in accordance with the issuance of a land disturbance permit.
TP/RP Required (see 630- 10.7.)
Private or Public Utilities, and County Greenways Land clearing for utilities and greenways and construction of private or public utilities or greenways Exempt (see 630-20.3.)
Residential Lots or Subdivisions Clearing, Clearing and Grubbing, Grading, Development or Building Permit Two trees per lot and street trees and TP/RP meeting 16 TDU's *(see 630-20.4.)
Residential Recreation Areas, Multifamily and Non-residential Individual Sites Clearing or clearing and grubbing only. TP/RP required (see 630- 20.2.)
Project Type Type of Construction Applicability Grading or Development Permit TP/RP required (see 630- 20.2.)
Building Permit Covered by TP/RP as approved by LDP (see 630- 20.2) (Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-20. Permit Requirements.
630-20.1 Land Disturbance Permit Required. Land-disturbing activities shall not commence until such activities have been authorized by issuance of an appropriate land disturbance or development permit under the provisions of this UDO. Once a Final Plat has been recorded, land-disturbing activities on residential lots shall not occur until a lot disturbance permit for a specific lot has been obtained.
630-20.2 Tree Preservation and/or Replacement Plan Required.
A. For projects not exempt from the provisions of this Chapter, as described in Section 630-10, a Tree Preservation and/or Replacement Plan shall be submitted along with the Tree Canopy Calculation, and the other documents required by the UDO for the issuance of a Clearing, Clearing and Grubbing, Grading, or Development Permit.
B. Tree Preservation and/or Replacement Plans, including the Tree Canopy Calculation, and related documentation shall be reviewed by the Department for conformance to the provisions of this Chapter along with and at the same time as all other plans required for a requested land disturbance permit under the provisions of the UDO.
C. Clearing, grading and development activities shall conform in all respects with the approved Tree Preservation and/or Replacement Plan. Any revisions to the proposed development of a property, and any changes reflected in a subsequently submitted permit application, shall be shown on a revised Tree Preservation and/or Replacement Plan and be approved as part of the new or revised permit prior to the commencement of such changed activities.
630-20.3 Limited Land Disturbing Projects. Projects which propose only limited development activities may be issued a land disturbance permit without a Tree Preservation and/or Replacement Plan under the following circumstances:
A. Private or public utility easements and County greenways on public access easements and private or public utility easements shall not be required to submit a Tree Preservation and/or Replacement Plan if the proposed land-disturbing activities are strictly limited to those directly related to the placement of required soil erosion and sedimentation controls, the installation of public or private utilities, the installation of County greenways on public access easements and private or public easements, or other required improvements expressly required by the County or by a condition of zoning, special use, modification, waiver or variance approval.
B. Residential recreation areas, individual multifamily residential and attached townhomes (not on individual lots), and non-residential projects (not involving the subdivision of the property) may not be allowed to undertake activities limited to clearing, or clearing and grubbing only, without approval of a Tree Preservation and/or Replacement Plan. Additional areas may be designated by the Department to remain undisturbed as may be reasonably required with consideration given to the proposed use of the property, as well as adjacent properties, in accordance with the Gwinnett County Unified Plan.
C. The limits of clearing or clearing and grubbing shall be established no closer to the boundaries of all said undisturbed areas than the driplines of the trees that are located within said areas.
D. For any property for which a Tree Preservation and/or Replacement Plan was not required prior to issuance of a land disturbance permit under the provisions of Subsection 630-20.2, all areas required to be undisturbed shall be provided with protective tree fencing along the limits of clearing or grading which adjoin existing trees in accordance with the provisions found in Subsection 630-50.2. These measures shall be in place prior to beginning clearing or grading activities and shall be maintained throughout the land-disturbing period.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-30. Tree Density Requirements.
630-30.1 Tree Density Standard.
A. On each property for which a Tree Preservation and/or Replacement Plan is required, existing trees shall be retained and new trees shall be planted such that the property shall attain or exceed a Tree Density Standard of 16 Tree Density Units per acre, or 20 Tree Density Units per acre as specified in the Overlay Districts, or 24 Tree Density Units per acre for limited land-disturbing activities (Sections 630-10.4, 5, 6 and 7).
B. Trees, both existing and new, shall be reasonably distributed throughout the site, with emphasis on tree groupings to achieve aesthetic results following professional landscaping standards. Trees, including street trees, may be retained, or planted for credit within a public street right-of-way.
C. Trees located in a stream buffer may be counted toward fulfilling the Tree Density Standard provided the acreage within the stream buffer is included in the calculations used to fulfill the Tree Density Standard.
D. Trees, both existing and new, located in a temporary construction buffer may be counted toward fulfilling the Tree Density Standard provided the acreage within the temporary construction buffer is included in the calculations used to fulfill the Tree Density Standard.
E. If a specimen tree's Critical Root Zone (CRZ) falls outside of the buffer partial credit may be obtained toward fulfilling the Tree Density Standard. See Section 630-30.5 in this UDO.
630-30.2 Buffer Exclusion in Fulfilling the Tree Density Standard.
A. Existing trees proposed to be retained and preserved, and new trees proposed to be planted, in order to meet the buffer requirements as required per Table 610.1, as required by the Supplemental Use Standards, or as a condition of Zoning, Special Use, Variance, or Waiver approval shall not be considered in fulfilling the requirements of Tree Density Standard for the project.
B. The acreage within the buffer shall be excluded from the overall acreage used to calculate the Tree Density Standard.
630-30.3 Easement Exclusion. Properties possessing natural gas, petroleum or electric power transmission easements, or major sanitary sewer main (greater than 8 inches in diameter) or water main (greater than 16 inches in diameter) distribution easements, may exclude the land area contained in the easement from the total acreage of the property in fulfilling the Tree Density Standard provided that no improvements (e.g., parking lots, tennis courts, driveways, greenways, stormwater management facilities, etc.) are proposed within the easement. If any improvements are proposed within the easement, then the land area so used within the easement for the improvements, plus an additional 10-feet of land area surrounding the improvements, shall be included in the total acreage of the property to fulfill the Tree Density Standard.
630-30.4 Lake and Pond Exclusion. Properties with a lake or pond greater than 1 acre in size may exclude the land area contained in the lake or pond from the total acreage of the property in fulfilling the Tree Density Standard.
630-30.5 Tree Density Standard Calculation. The Tree Density Standard shall be calculated by summing the following credits and dividing by the total acreage of the project included within the limits of the permit application (but excluding any acreage included within a zoning buffer and other land area allowed to be excluded by this Chapter).
A. Existing trees.
1. Credit for existing trees proposed to be preserved on the site shall be calculated by multiplying the diameter of the tree times the units assigned in Table 630.2. Credit for Existing Trees. Credit shall be given for all trees preserved on a property having a diameter of 3 inches or more, except trees located in a required zoning buffer. Tree sample areas of similar vegetation of 50 square feet or larger may be used as a method of measuring Tree Density Units.
B. New trees.
1. Credit for new trees proposed to be replaced on the site shall be calculated based on the units assigned in Table 630.4, Credit for Replacement Trees. Credit shall be given for all new trees replaced on a property except for trees 1 inch or less in caliper and new trees planted in a required zoning buffer.
Deciduous trees shall be a minimum 2 inches in caliper and evergreen trees shall be a minimum of 6 feet in height. New multi-trunked trees shall only be given credit by measuring the single largest trunk and not the cumulative total of the various trunks. Tree-form shrubs shall not be given credit for satisfying the required Tree Density Standard.
C. Specimen trees.
1. Credit for specimen trees preserved on the site shall be calculated based on the units assigned in Table 630.3, Credit for Specimen Trees. When multi-trunked specimen trees split below diameter at breast height the trunk shall be measured at the narrowest point below the split.
2. The Critical Root Zone (CRZ) shall include no less than the minimum area beneath a tree that must be left undisturbed. The CRZ is a concentric circle centering on the specimen tree's trunk with a radius equal in feet to 1.5 times the number of inches of the trunk's diameter at breast height (4.5 feet) or the dripline, whichever is greater. For example, the CRZ for a 24-inch diameter tree trunk is a 36-foot radius concentric circle from the trunk of the tree. However, if the dripline extends further than the 36-foot circle that dripline shall take precedence.
3. Credit shall be given for all specimen trees preserved on a property except for those located in a required zoning buffer where partial credit may be given. A specimen tree located within a buffer with a CRZ extending beyond the buffer is allowed partial credit toward Tree Density Units. The partial credit is based on the percentage of CRZ that is outside of the buffer. For example: a 30-inch specimen tree's CRZ extends by 20 percent over the buffer line then the developer receives 20 percent of the credit for a 30-inch existing specimen tree (19.6 × .20 = 3.92 TDU's).
4. To determine the percentage of CRZ outside of the buffer, measure the area of the CRZ circle. Then measure the area of CRZ outside of the buffer. Divide the smaller number into the larger number and that is the percentage of CRZ. For example: a specimen tree's CRZ is 6,000 square feet, 1,200 square feet is outside of the buffer. Divide 1,200 by 6,000 and the answer is .2 or 20 percent of the CRZ is outside of the buffer.
D. Additional credits shall be granted under the following circumstances:
1. Existing trees to be preserved within a 100-year floodplain shall be granted a bonus credit of 50 percent of the units assigned in Table 630.2 unless the tree is located within a required zoning buffer.
E. Genus percentage for overall site.
1. There shall be no more than 33 percent of any one genus of tree for overall site. Provide calculations on the Tree Preservation and/or Tree Replacement Plan.
630-30.9 Trees Selected for Planting.
A. Replacement trees proposed to be planted for credit toward meeting the minimum required Tree Density Standard on a property shall comply with the following:
1. The spacing of replacement trees must be compatible with spatial site limitations and with responsible consideration towards species size when mature.
2. Trees selected for planting shall be a species listed in the Gwinnett County Tree Species List in Section 4 of the UDO Appendix. Standards for transplanting shall be in keeping with those established by the International Society of Arboriculture, as included in the "Tree and Shrub Transplanting Manual," latest edition. Refer to the American Association of Nurserymen publication "American Standard for Nursery Stock" (ANSI Z60, 1973) for plant material quality specifications. Refer to the "Manual of Woody Landscape Plants" (Michael Dirr, 1983, Castle Books) for information on tree species site requirements.
3. Trees selected for planting must be free from injury, pests, disease, nutritional disorders, or root defects, and must be of good vigor, so as to assure a reasonable expectation of survivability.
Table 630.2. Credit for Existing Trees (measured at 4.5 feet above the ground).
Conversion from tree diameter in inches to tree density units for trees remaining on site*
DIA. UNITS DIA. UNITS DIA. UNITS DIA. UNITS
3 .75 15 3.6 27 12.0 39 24.9 4 .90 16 4.2 28 12.9 40 26.1 5 1.05 17 4.8 29 13.8 41 27.6 6 1.35 18 5.4 30 14.7 42 28.8 7 1.50 19 6.0 31 15.6 43 30.3 8 1.65 20 6.6 32 16.8 44 31.8 9 1.8 21 7.2 33 17.7 45 33.0 10 1.95 22 7.8 34 18.9 46 34.5 11 2.1 23 8.7 35 20.1 47 36.0 12 2.4 24 9.3 36 21.3 48 37.8 13 2.7 25 10.2 37 22.5 49 39.3 14 3.3 26 11.1 38 23.7 50 40.8
* Tree diameter for existing trees is measured at 4.5 feet above the ground. Tree diameter fractions may be "rounded up" if 0.5 inches or greater or "rounded down" if less than 0.5 inches.
Table 630.3. Credit for Specimen Trees (measured at 4.5 feet above the ground).
Conversion from specimen tree diameter in inches to specimen tree density units for specimen trees on site*
DIA. UNITS DIA. UNITS DIA. UNITS DIA. UNITS
12 3.2 24 12.4 36 28.4 48 50.4 13 3.6 25 13.6 37 30.0 49 52.4 14 4.4 26 14.8 38 31.6 50 54.4 15 4.8 27 16.0 39 33.2 51 56.4 16 5.6 28 17.2 40 34.8 52 58.4 17 6.4 29 18.4 41 36.8 53 60.4 18 7.2 30 19.6 42 38.4 54 62.4 Conversion from specimen tree diameter in inches to specimen tree density units for specimen trees on site*
DIA. UNITS DIA. UNITS DIA. UNITS DIA. UNITS
19 8.0 31 20.8 43 40.4 55 64.4 20 8.8 32 22.4 44 42.4 56 66.4 21 9.6 33 23.6 45 44.0 57 68.4 22 10.4 34 25.2 46 46.0 58 70.4 23 11.6 35 26.8 47 48.0 59 72.4
* Tree diameter for existing trees is measured at 4.5 feet above the ground.
** Multi-trunked specimen trees shall be measured at the narrowest point below the split.
Table 630.4. Credit for Replacement Trees (measured at 6 inches above the ground).
Conversion from tree caliper to tree density units for proposed replacement trees* Caliper Units Caliper Units
2 .5 9 1.5 3 .6 10 1.7 4 .7 11 1.9 5 .9 12 1.1 6 1.0 13 2.3 7 1.2 14 2.5 8 1.3 15 2.7
* Tree caliper for new replacement trees is measured at 6 inches above the ground. Tree caliper fractions may be "rounded up" if
0.5 inches or greater or "rounded down" if less than 0.5 inches. New planted multi-trunked trees shall be given credit by measuring the single largest trunk only. Tree-form shrubs shall not be given credit.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-40. Tree Canopy Calculation Requirement.
630-40.1 The tree canopy calculation requirement is required for all new developments and existing developments adding structural or site improvements. Pre-construction and post construction calculations shall be provided on the Tree Preservation/ Replacement Plan and shall include the total net increase or decrease in canopy area for the site.
There is no minimum or maximum tree canopy percentage required at this time.
630-40.2 Tree Canopy Calculation Method.
A. The pre-construction tree canopy shall be calculated by assigning square feet of canopy to each existing tree based on the Tree Species List in Section 4.0 of the UDO appendix. Stands of three or more existing trees can be computed with polygons and canopy area noted in terms of square feet.
B. The post construction tree canopy shall be calculated by assigning square feet of canopy to each tree proposed and each tree preserved on the Tree Species List in Section 4.0 of the UDO Appendix. Existing trees whose critical root zone is protected during construction activities are counted toward meeting the post construction tree canopy calculations. Stands of three or more existing trees can be computed with polygons and canopy area noted in terms of square feet. Include existing and proposed buffer trees, landscape strip trees, parking lot trees and any tree preserved or replaced within the site in the tree canopy calculation.
C. Add the total square feet of canopy. Convert the total site acreage to square feet. Calculate the total square feet of canopy as a percentage of the total square feet for the site. Example of Tree Canopy Calculation.
Qty Botanical Name Canopy Area in square feet Total Canopy area in square feet 10 Fraxinus pennsylvanica 491 4,910 27 Juniperus virginiana 79 2,133 14 Quercus coccinea 1,590 22,260 8 Nyssa aquatica 1,256 10,048 23 Pinus taeda 491 11,293 6 Existing oak hardwoods 1,800 (avg.) 10,800 Existing (mixture of softwoods and hardwoods) polygon 23,400
4.0 Acres TOTAL 84,844 Total site acreage 174,240 Percentage of total site covered by canopy 84,844 divided by 174,240 49% (Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-50. Tree Preservation and Replacement Requirements.
The following guidelines and standards shall apply to trees proposed to be preserved for credit toward meeting the minimum required Tree Density Standard on a property and to all boundary trees extending into permitting property.
630-50.1 Tree Protection Areas.
A. The root system is generally within the dripline or Critical Root Zone. To protect these critical roots, a Tree Protection Area shall be established around each tree or group of trees to be retained.
B. The Tree Protection Area shall include no less than the total area beneath the tree canopy as defined by the dripline or Critical Root Zone of the tree or group of trees collectively.
C. Site Utility and Grading Plans shall clearly indicate that the Tree Protection Areas will not be disturbed.
D. Construction site activities such as parking, materials storage, concrete washout, burnhole placement, etc., shall be arranged so as to prevent disturbances within Tree Protection Areas.
630-50.2 Protective Barriers.
A. Protective tree fencing shall be installed between buffers, Tree Protection Areas and areas proposed to be cleared, graded, or otherwise disturbed on the site, prior to any land disturbance.
B. All Tree Protection Areas shall be designated as such with "tree save area signs" posted in addition to the required protective fencing. Signs requesting subcontractor cooperation and compliance with tree protection standards are recommended for site entrances.
C. All Tree Protection Areas must be protected from soil sedimentation intrusion through the use of silt screens or other acceptable measures placed up-slope from the tree protection area.
D. All protective tree fencing, and all erosion control barriers must be installed prior to and maintained throughout the land-disturbing and construction process and should not be removed until final landscaping is installed.
630-50.3 Encroachment. If encroachment into a Tree Protection Area occurs causing irreparable damage to the trees, the Tree Preservation and/or Replacement Plan shall be revised to compensate for the loss. Under no circumstances shall the developer be relieved of responsibility for compliance with the provisions of this Chapter of the UDO, nor shall plan revision activities stop the Department from instituting action for violation of this Chapter of the UDO.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-60. Tree Species List Requirements.
Tree species lists for small, medium, or large trees are found in Section 4.0 of the Appendix. The Director is authorized to administratively add and delete species from the list. Except as specifically approved by the Director as a modification, only the trees listed in Section 4.0 of the Appendix shall be given credit towards meeting the requirements of Chapters 610, 620, 630, and 640.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-61. Shrub Species List Requirements.
Allowed shrub species lists are found in Section 4.0 of the Appendix. Except as specifically approved by the Director as a modification, only the approved shrubs listed in Section 4.0 of the Appendix shall be given credit towards meeting regulatory requirements of Chapters 610, 620, 630 and 640. The Director is authorized to administratively add and delete species from the list.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-62. Prohibited Plant Species List.
The Gwinnett County Prohibited Plant Species List contains trees, shrubs, ground covers, vines and grasses that are defined as exotic plants that are serious to minor problems in Georgia natural areas based on the Georgia Exotic Pest Plant Council. The plants on Gwinnett County Prohibited Plant Species List are invasive plant species and shall not be used for meeting regulatory requirements. The Director is authorized to administratively revise the list based on current information from the Georgia Exotic Pest Plant Council.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-70. Specimen Trees.
630-70.1 Specimen trees are required to be preserved. For preliminary site visit criteria refer to Section 630-70.4 of this UDO. For plan preparation guidelines for the Specimen Tree Survey and Specimen Tree Concept Plan refer to Section 320-20 of this UDO.
630-70.2 A Specimen Tree Survey Plan is required to be submitted to the Department for all development that does not meet the exemptions listed in Section 630-70.8 below prior to the Specimen Tree Concept Plan submittal and shall be prepared by a certified arborist, authorized registered professional or registered forester. In cases where there is phasing of development a Specimen Tree Survey Plan and a Specimen Tree Concept Plan is required for the entire property boundaries prior to the Final Plat for the first phase. Any tree that meets the identification criteria for tree size in Section 630-70.3 below is considered a specimen tree and shall be shown on the Specimen Tree Survey Plan. Any tree that meets the identification criteria for tree size and condition in Section 630-70.3 shall be shown on the Specimen Tree Concept Plan. In general, the Specimen Tree Survey Plan shows where the existing specimen trees that meet the identification criteria for size are located, and the Specimen Tree Concept Plan shows where the existing specimen trees that meet the identification criteria for size and condition are located in relation to the preliminary plan design. For plan preparation guidelines for the Specimen Tree Survey and the Specimen Tree Concept Plan refer to Section 320-20 of this UDO.
630-70.3 Specimen Tree Identification.
A. Identification Criteria.
1. Tree Size: Tree must meet size criteria in number 1. and in number 2. below tree must meet conditions
a. through e. Conditions f. and g. are optional.
a. Large Hardwood: 28-inch diameter or larger
b. Large Softwood: 30-inch diameter or larger
c. Small Native Flowering: 12-inch diameter or larger
i. The list below indicates small native flowering specimen tree types:
• Cercis canadensis, Eastern Redbud
• Cornus florida, Flowering Dogwood
• Amelanchier arborea, Serviceberry
• Oxydendrum arboretum, Sourwood
2. Condition.
a. A life expectancy of greater than 10 years.
b. A sound and solid trunk with no extensive decay or hollow, and less than 20 percent radial trunk dieback.
c. No more than one major and three minor dead limbs (hardwoods only).
d. No major insect problem.
e. No major pathological problem (fungus, virus etc.).
f. Exceptional quality.
g. Of historical significance.
630-70.4 Site Visit.
A. Prior to the submission of specimen tree survey developer's certified arborist, authorized registered professional, or registered forester shall visit the site:
1. Locate and flag specimen trees that meet the size criteria with green and white striped tape.
2. Number specimen trees that meet the size criteria with tree ID tags.
3. Prepare Specimen Tree Survey Plan (Section 320-20.1).
4. Submit the Specimen Tree Survey to the Department of Planning and Development.
630-70.5 Specimen Tree Stands.
A. Specimen tree stands are required to be preserved. If groupings of trees are designated as specimen tree stands, they are required to be preserved and shown on the Specimen Tree Survey Plan and Specimen Tree Concept Plan. Specimen tree stands shall be marked as listed above in Section 630-70.4.
B. Identification Criteria (meeting one or more of the following):
1. Contiguous group of trees that contain one or more specimen trees and the specimen trees are interlocked with other members of the stand in such a manner as to endanger the specimen tree if other members of the stand were to be removed.
2. Stand of historical significance.
3. Exceptional aesthetic quality or striking characteristics.
4. Unique, of a rare or unusual species.
630-70.6 Specimen Tree Preservation:
A. Additional density credit will be given for the preservation of specimen tree(s) given tree preservation is followed per the guidelines listed below and in this Chapter. Credit for any successfully saved and maintained specimen tree is listed in Table 630.3, Credit for Specimen Trees.
630-70.7 Specimen Tree Protection.
A. Specimen trees identified as preserved on the Specimen Tree Concept Plan shall have tree protection fence at the Critical Root Zone or dripline, whichever is greater, after the pre-construction meeting and prior to any land disturbance.
B. The layout of utility lines, easements, and grading shall be outside the Critical Root Zone or dripline.
C. There shall be no parking, construction material storage, bury pits, concrete or gravel wash out, within Critical Root Zones, driplines, and Tree Save Areas.
D. Critical Root Zone or dripline of specimen tree(s) and Tree Save Areas shall remain undisturbed with the following exceptions:
1. Thinning is allowed and may include manual removal (no motorized/ wheeled or track vehicles) of non-specimen trees. Stumps may be ground provided there is no grading disturbance.
2. The manual removal of the following plants is allowed: Kudzu, Pueraria lobata; Bamboo spp.;
Japanese Honeysuckle, Lonicera japonica; Japanese Climbing Fern, Lygodium japonicum; Mimosa, Albizia julibrissin; Multiflora Rose, Rosa multiflora; Autumn Olive, Elaeagnus umbellata, Chinese Privet, Ligustrum sinense; Chinese Tallow Tree, Sapium sebiferum. A Commercial Applicator License and a Pesticide Contractor License are required by the contractor if the use of herbicides is necessary for noxious plant material removal.
3. Non-vegetative material may be removed manually.
4. Thinning and clearing of any vegetative material in the Critical Root Zone shall be done in the landscape installation phase of development.
E. The tree protection fence shall be placed at the dripline or Critical Root Zone of the trees.
F. Tree protective fencing shall be located at the dripline or the Critical Root Zone prior to any land disturbance. A certified arborist shall conduct a site visit after the pre-construction meeting and prior to any land disturbance to inspect tree protection fencing.
G. Specimen trees and clearing limits shall be shown on the Site Development Plan, Grading Plan, Erosion, Sedimentation and Pollution Control Plan, Utility Plan, and Tree Preservation and/or Tree Replacement Plan.
H. The top vegetative cover within the Critical Root Zone or dripline shall remain undisturbed. Mulch may be applied if the certified arborist, authorized registered professional or registered forester finds it will benefit the tree. If mulch is applied, it shall be aged hardwood mulch, and it shall be applied at the landscape installation phase of the project.
I. Tree protection fencing shall be a minimum of four feet in height and be one of the three options listed below:
1. Orange mesh type fabric or polyethylene laminar safety fencing.
2. Two inch by 4-inch wood posts and 1 inch by 4-inch wood rails.
3. Chain link fence, minimum 4 feet in height.
J. Tree protection fences must have signage that reads "Stay Out", and "Tree Save", posted on fence every 20 feet with a minimum of four signs.
K. Specimen trees and stands of specimen trees shall be protected from silt.
L. Type S silt fencing must be placed along the outer uphill edge of Tree Protection Zones where land disturbance is taking place.
M. A stop work order will be issued if a project is found to be out of compliance with the requirements of this Chapter.
630-70.8 Specimen Tree Exemptions. The following are exempt from a Specimen Tree Survey Plan and Specimen Tree Concept Plan:
A. Small sites (1 to 2 acres in size) in which it is clearly visible from one vantage point that there are no specimen trees on site are not required to submit a Specimen Tree Survey Plan or Specimen Tree Concept Plan. The Department of Planning and Development shall require a letter from the developer's certified arborist, authorized registered professional or registered forester certifying there are no specimen trees on site.
B. A site that has been previously graded or cleared under a development permit or land disturbance permit and in which there are no specimen trees on site is not required to submit a Specimen Tree Survey Plan or Specimen Tree Concept Plan. The Department of Planning and Development shall require a letter from the developer's certified arborist, authorized registered professional or registered forester certifying there are no specimen trees on site.
C. Private or public utility easements and County greenways on public access easements, and private or public utility easements shall not be required to submit a Specimen Tree Survey Plan or Specimen Tree Concept Plan if the proposed land-disturbing activities are strictly limited to those directly related to the placement of required utilities or placement of County greenways and the installation of private or public utilities, and County greenways on public access easements, private or public utility easements.
630-70.9 Specimen Tree Critical Root Zone (CRZ) Disturbance.
A. A maximum of 30 percent of disturbance is allowed within the Critical Root Zone given specific circumstances. Specific circumstances include and are not limited to sidewalks, boardwalks, and paths. Any proposed disturbance shall be reviewed and approved by the Director. Credit may be given for the specimen tree when the Critical Root Zone is disturbed up to 25 percent. Credit is listed in Table 630.3 (Credit for Specimen Trees) and is as follows:
1. 0—10 percent disturbance to the CRZ may receive 100 percent credit.
2. 10.1—15 percent disturbance to the CRZ may receive 75 percent credit.
3. 15.1—20 percent disturbance to the CRZ may receive 50 percent credit.
4. 20.1—25 percent disturbance to CRZ may receive 25 percent credit.
5. Any proposed disturbance to the specimen tree's CRZ from 25.1 to 30 percent may receive credit based upon what type of disturbance is proposed. Any proposed disturbance and specialty cut slopes shall be reviewed by the Director.
a. For example: Given a 36-inch specimen tree whose critical root zone is proposed to be disturbed by 15.4 percent: Table 630.3 assigns a 36-inch specimen tree 28.4 tree density units (TDU's).
That tree may receive credit for 50 percent of 28.4 TDU's which is equivalent to 14.2 TDU's.
B. When critical root zone disturbance exceeds 30 percent, the Director is hereby authorized to determine recompense.
C. In the event a specimen tree's Critical Root Zone has experienced unauthorized impact and the disturbance is documented by photos, the Director is hereby authorized to determine recompense.
630-70.10 Recompense/Specimen Tree Removal with Director Approval.
A. Director Approval is required for removal of specimen trees. The Director is hereby authorized to make a determination whether a specimen tree may be removed.
1. If a specimen tree previously identified on the Specimen Tree Concept Plan to be preserved cannot be preserved due to site constraints, the developer shall submit to the Director a statement of hardship alleging a necessity for removal of the specimen tree and site design alternatives. Examples of hardship include, but are not limited to, a tree's proximity to overhead transmission lines and topography after site design options have been exhausted. Hardship factors require due justification and shall include documentation.
a. Plans to be submitted to the Director showing hardship justification shall include the following:
i. Specimen Tree Survey Plan.
ii. Existing and proposed contours.
iii Limits of Disturbance iv. Specimen Tree Concept Plan.
B. The Director is hereby authorized to determine recompense requirements when a specimen tree requires removal based on site constraints. Recompense requirements shall not count toward existing specimen Tree Density Units.
C. If specimen tree removal is approved by the Director, recompense Tree Density Units generated from removal of a specimen tree(s) shall not be counted toward any landscape requirement such as parking lot, landscape strip, or buffer trees.
D. If specimen tree removal is approved by the Director, and if the existing Tree Density Units remaining post construction exceed the required Tree Density Units per acre requirement, recompense Tree Density Units may count toward any additional existing Tree Density Units.
E. The Director is hereby authorized to make a final determination whether a tree is a specimen tree or whether it has historical significance.
F. Trees shown on plan and planted on site for recompense shall be a minimum of 2 inches in caliper or greater, or a minimum of 6 feet in height or greater at time of planting and may be hardwood or softwood or a combination thereof.
G. Trees planted for recompense shall be included in the overall percentage of genus calculations for the site.
Refer to Subsection 630-30.5.E.
630-70.11 Recompense/Specimen Tree Removal without Director Approval.
A. If a specimen tree is removed without prior approval from the Director, the penalty to replace that tree is two times the Tree Density Units of the specimen tree removed. Replacement tree(s) shall be 3 inches caliper or greater.
B. If a specimen tree is removed without Director Approval with no residual evidence of its condition with the exception of the trunk, the diameter of the trunk will determine if the tree was of specimen quality.
Required recompense units shall be two times the Tree Density Units of the specimen tree removed.
Replacement trees shall be 3 inches caliper or greater.
C. If there is evidence that a specimen tree is removed without plan approval and there is no residual evidence of its condition or trunk diameter, recompense requirements shall be a minimum of two 28-inch hardwood trees. The property owner will be required to plant 34.4 Tree Density Units on site in addition to other site density and landscape requirements.
630-70.12 Specimen Tree Options. The following are suggested guidelines for successful specimen tree preservation.
A. Specimen Tree Value. At the option of developer and contractor a value of the tree can be computed and displayed on the tree protection fence during construction. Once the value is computed it can be written down on a weatherproof placard and placed on the tree protection fencing. The monetary replacement value of a specimen tree can be computed in two different ways.
B. The "replacement" value of the tree is defined as the cost to replace a tree. Compute the value by taking the diameter of the specimen tree and match it to the existing credit unit value for that tree. The result is the total number of credit units attributed to the specimen tree. For this example, the tree was removed without prior Director approval, therefore the Tree Density Unit for the specimen tree must be multiplied by two. Take the total and divide by .6 (a 3-inch caliper replacement tree is worth .6 units). The result is the number of trees necessary to replace the specimen tree. Multiply the number of trees needed by the cost of the tree including planting, labor, and materials. The result is the total cost to replace the specimen tree or "the value" of the specimen tree.
C. Example, Given: a 36-inch diameter oak tree.
1. Credit Value = 28.4 Credit Units
2. A 3-inch caliper replacement tree = .6 credit units (See Table 630.3)
3. 28.4 times 2 equals 56.8
4. 56.8 divided by .6 = 94.66 replacement trees needed
5. 95 × $250.00 (estimated cost) = $23,750 = Value of the tree (Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-80. Tree Bank for Alternative Compliance.
630-80.1 Purpose. The intent of the requirements of this Section is to ensure that a minimum number of trees are replaced and/ or preserved on newly developed or redeveloped sites. The Tree Bank is an alternative option and may be used in the event the site tree density or recompense tree density unit requirements cannot be met on-site due to hardship. Hardship must be documented by the developer and presented to the Director before the Tree Bank may be used.
Trees required by this Ordinance such as but not limited to parking lot, landscape strip, landscape setbacks, landscape frontages, street frontage buffer, supplemented buffer, and no access easement plantings must be planted on site and shall not utilize the Tree Bank.
630-80.2 Monetary Compensation for Trees. A developer may choose to provide the Gwinnett County Department of Planning and Development with monetary compensation for trees. If the Tree Bank is chosen, then the following criteria shall be observed:
A. Provide tree density calculations on the Tree Preservation / Tree Replacement Plan including the total number of Tree Density Units that cannot be met on-site.
B. Multiply the Tree Density Units that cannot be met on-site by the Monetary Compensation Value. The Department is authorized to determine the current Monetary Compensation Value for tree density units. To determine the tree bank monetary compensation, multiply this value times the Tree Density Units deficit to determine the dollar amount to be paid.
D. The monies collected for the Tree Bank may be used for:
1. Projects that collect data needed for management of urban community forests such as tree canopy mapping, assessments, tree management plans, and urban heat island mapping.
2. Street tree planting programs.
3. Community initiatives for the planting of trees.
4. Food forest projects.
5. Removal of invasive species.
6. Educational purposes.
7. Creation and/or updates to tree and landscape related regulations.
8. Matching funds for any grants associated with the above items.
E. The funds may be used by the Departments of Planning and Development, Community Services, and Support Services, community improvement districts, and neighborhood associations for the project types in 630-80.2D. Projects may be on public or private land as may be approved by the department.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-90. Redevelopment.
630-90.1 For redeveloped sites the Department of Planning and Development strongly recommends the developer, authorized registered professionals, design professionals and staff schedule a pre-submittal meeting with the department to discuss the potential of the site and any issues that may be present on the site.
630-90.2 Redeveloped sites shall comply with the buffer and specimen tree requirements as set forth in Chapter 610 and Section 630-70 respectively and provide compliance with parking lot, landscape strip and Tree Density Unit requirements.
630-90.3 Where the scope of a project results in disturbance, removal, and replacement of 25.1 percent or greater of the site area, a Tree Preservation and/or Tree Replacement Plan is required. The plan shall show landscape strip planting, parking lot trees, Tree Density Units, buffers and shall comply with the requirements of Chapters 600, 610, 620, 630 and 640 of this UDO.
630-90.4 Where the scope of a project results in disturbance, removal, and replacement of 25 percent or less of the site area, a Tree Preservation and/or Tree Replacement Plan is required. The plan shall include the existing and proposed landscape conditions that verify compliance with Chapters 600, 610, 620, 630 and 640 of this UDO.
A. At a minimum the plan must show the following existing and proposed elements with intent to comply:
1. Buffers.
2. Landscape strips.
3. Parking lot trees.
4. Tree Density Units.
5. Tree Save Areas.
B. Director shall review the proposed Tree Preservation and/or Tree Replacement Plan.
630-90.5 Disturbance as stated above in Redevelopment Section 630-90 shall include a building replacement where the footprint of the building counts toward the site disturbance.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-100. Water-Efficient Design Considerations.
630-100.1 It is the policy of Gwinnett County to encourage individuals or firms who prepare the plans and plats required by this UDO to consider the use of water-efficient landscaping principles and techniques as one of the criterion to be used in plant selection and design.
630-100.2 Principles and Techniques of Water-Efficient Landscaping (Xeriscaping). The recommended principles and techniques to be considered are as follows:
A. Proper Location and Design. Locating plants where they will naturally thrive and not require excessive water and maintenance to survive, as well as grouping plants by water needs, and limiting and concentrating high water using plants.
B. Turf Selection. Limiting turf areas, and selecting turf grasses that can survive the variable rainfall conditions in this region.
C. Efficient Watering. Once plants are established, avoid watering during periods of normal rainfall and during droughts, watering every week to 10 days or less depending on the drought tolerance of the plants.
D. Soil Improvements. Loosening and breaking up the soil beyond the immediate planting area to allow better water absorption and to promote deep roots.
E. Mulching. Using mulch to hold moisture in the soil which helps maximize the benefits of watering as well as preventing weeds.
F. Plant Selection. Selecting plants native or suitable to the region according to their watering requirements and optimum locations.
G. Maintenance. Maintaining the landscape to maximize water conservation such as increasing mowing heights and avoiding fertilizing during dry spells.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-110. Artificial Materials Prohibited.
630-110.1 Only live plant material may be used to fulfill the requirements of this UDO.
(Ord. No. UDOA2014-00002(GCID No. 2014-1014), 11-4-14; Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023)
Section 630-120. Warranty, Maintenance Surety, and Performance Surety.
630-120.1 All trees and landscape materials planted to meet the requirements of this UDO shall conform to the warrant and surety requirements of Chapter 1000.
630-120.2. Continuing Maintenance.
A. The owner, occupant, tenant, and respective agent of each, if any, shall be jointly and severally responsible for the perpetual maintenance and protection of buffers, trees and landscape plantings required by this
UDO.
B. The Department is hereby authorized to order diseased, infested, dying, dead or damaged landscaping required herein to be replaced.
C. Buffers that, over a period of time, lose their screening ability shall be replanted to meet the requirements of Section 610-20.
D. Replacement trees and landscaping shall be in accordance with the applicable provisions of this UDO.
E. Owner of the property or property owners association as the designated responsible party for the landscaping, shall provide continued proper maintenance, repair, and replacement of all landscaping materials and areas in accordance with the approved plan for perpetuity. Maintenance shall include weeding, cultivating, mulching, trimming, pruning, watering, and fertilizing as needed. Maintenance should begin immediately after planting.
F. Indemnification and maintenance agreements for developments must be recorded with the Gwinnett or Georgia Department of Transportation, as appropriate, prior to plan approval for landscaping and related site amenities within the right-of-way.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Section 630-130. Enforcement.
Enforcement of this Chapter shall be consistent with the terms of Chapter 120 of the UDO.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 44), 9-26-2023) Chapter 700. Floodplain Management* Section 700-10. General Provisions.
700-10.1 Findings.
A. The flood hazard areas of Gwinnett County are subject to periodic inundation which may result in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety, and general welfare.
B. Flood hazard areas can serve important stormwater management, water quality, streambank protection, stream corridor protection, wetland preservation and ecological purposes when permanently protected as undisturbed or minimally disturbed areas.
C. Effective floodplain management and flood hazard protection activities can:
1. Protect human life and health.
2. Minimize damage to private property.
3. Minimize damage to public facilities and infrastructure such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains.
4. Minimize expenditure of public money for costly flood control projects associated with flooding and generally undertaken at the expense of the general public.
D. Article IX, Section II of the Constitution of the State of Georgia and O.C.G.A. § 36-1-20(a), have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, Gwinnett County, Georgia, establishes this set of floodplain management and flood hazard reduction policies for the purpose of regulating the use of flood hazard areas. It is determined that the regulation of flood hazard areas and the prevention of flood damage are in the public interest and will minimize threats to public health and safety, as well as to private and public property.
700-10.2 Requirements. The requirements of Chapter 700 shall be applicable to all Areas of Special Flood Hazard within the jurisdiction of Gwinnett County.
700-10.3 Purpose. It is the purpose of Chapter 700 to protect, maintain, and enhance the public health, safety, environment, and general welfare and to minimize public and private losses due to flood conditions in flood hazard areas, as well as to protect the beneficial uses of floodplain areas for water quality protection, streambank and stream corridor protection, wetlands preservation and ecological and environmental protection by provisions:
A. Restricting or prohibiting uses or activities which are dangerous to health, safety, and property due to flooding or erosion hazards, or which increase flood heights, velocities, or erosion.
B. Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction or renovation.
C. Limiting the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of flood waters.
D. Controlling filling, grading, dredging and other development which may increase erosion or flood damage.
E. Preventing or regulating the construction of flood barriers which will unnaturally divert flood waters, or which may increase flood hazards to other lands.
F. Protecting the stormwater management, water quality, streambank protection, stream corridor protection, wetland preservation and ecological functions of natural floodplain areas.
700-10.4 Flood Area Maps and Studies. For the purposes of defining and determining "Area of Special Flood Hazard," "Areas of Future-conditions Flood Hazard," "Areas of Shallow Flooding," " Base Flood Elevations," "Floodplains," "Floodways," "Future-conditions Flood Elevations," "Future-conditions Floodplains," potential flood hazard or risk categories as shown on FIRM maps, and other terms used in Chapter 700, the following documents and sources may be used for such purposes and are adopted by reference thereto:
A. The Flood Insurance Study (FIS), dated September 29, 2006, or most current study, with accompanying maps and other supporting data and any revision thereto.
B. Other studies which may be relied upon for establishment of the base flood elevation (BFE) or delineation of the base or one percent (100-year) floodplain and flood-proned areas, including:
1. Any flood or flood related study conducted by the United States Army Corps of Engineers, the United States Geological Survey or any other local, State, or Federal Agency applicable to Gwinnett County.
2. Any base flood study conducted by a licensed professional engineer in the State of Georgia which has been prepared utilizing FEMA approved methodology and approved by the Department of Planning and Development.
C. Other studies which may be relied upon for establishment of the future conditions flood elevation or delineation of the future conditions floodplain and flood-proned areas, including:
1. Any flood or flood related study conducted by the United States Army Corps of Engineers, the United States Geological Survey or any other local, state, or federal agency applicable to Gwinnett County.
2. Any future-conditions flood study conducted by a licensed professional engineer in the State of Georgia which has been prepared utilizing FEMA approved methodology and approved by the Department of Planning and Development.
D. The repository for public inspection of the FIS, accompanying maps and other supporting data is located at the following location:
Gwinnett County Department of Water Resources Central Facility 684 Winder Highway Lawrenceville, GA 30045 700-10.5 Interpretation.
A. In the interpretation and application of Chapter 700 all provisions shall be:
1. Considered as minimum requirements.
2. Liberally construed in favor of Gwinnett County.
3. Deemed neither to limit nor repeal any other powers granted under state statutes.
B. Where interpretation is needed as to the exact location of floodplain or floodway boundaries (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the Department shall make the necessary interpretation based on data submitted by the applicant. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Chapter 700.
C. Where flood plain elevations have been defined, the floodplain shall be determined based on flood elevations rather than the area graphically delineated on the floodplain maps.
700-10.6 Drainage Easement Establishment. On behalf of the public, a drainage easement is hereby established for the sole purpose of preserving and protecting the free flow of surface waters inside the future conditions flood contour elevations and along all watercourses. Where debris has accumulated in such a manner as would increase the need for flood protection, raise the flood level, or increase the risk of hazardous inundation of adjacent communities or jurisdictions, the County is hereby authorized to enter upon such watercourse and clear or remove such debris or obstructions as are hazardous to the public safety. The cost thereof shall be charged to the owner of the property where such debris and/or obstruction was generated. Where erosion has occurred in such a manner as would endanger a building or a structure, the County is hereby authorized to enter upon such watercourse and stabilize the channel for public safety. The cost thereof shall be charged to the owner of the property where the erosion has occurred and/or caused the erosion.
700-10.7 Establishment of Development Permit. A development permit shall be required in conformance with the provisions of this UDO prior to the commencement of any clearing, grading, or development activities adjacent to, within, or affecting a future conditions floodplain.
700-10.8 Compliance. No structure or use of land shall hereafter be located, extended, converted, or structurally altered without full compliance with the terms of Chapter 700 and other applicable regulations.
700-10.9 Compatibility with Other Regulations. Chapter 700 is not intended to modify or repeal any other ordinance, rule, regulation, statute, easement, covenant, deed restriction or other provision of law. The requirements of Chapter 700 are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of Chapter 700 imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.
700-10.10 Warning and Disclaimer of Liability. The degree of flood protection required by Chapter 700 is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by man-made or natural causes. Chapter 700 does not imply that land outside the special flood hazard or flood prone areas or uses permitted within such areas will be free from flooding or flood damages. Chapter 700 shall not create liability on the part of Gwinnett County or on the part of any officer or employee thereof for any flood damages that results from reliance on this Chapter, or any administrative decision lawfully made thereunder.
700-10.11 Duties and Responsibilities of Ordinance Administrator. As the administrator of Chapter 700, the duties of the Director of the Department of Planning and Development or the Director's designee shall include, but shall not be limited to:
A. Review all development applications and permits to assure that the requirements of Chapter 700 have been satisfied and to determine whether proposed building sites will be reasonably safe from flooding.
B. Require that copies of all necessary permits from governmental agencies from which approval is required by federal or state law, including but not limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334, be provided and maintained on file.
C. When base flood elevation data or floodway data have not been provided, then the Director or Director's designee shall require the applicant to obtain, review and reasonably use any base flood elevation and floodway data available from a federal, state, or other sources in order to meet the requirements of Sections 700-20 and 700-30 and provisions of 700-40 herein.
D. Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures.
E. Review and record the actual elevation, in relation to mean sea level to which any substantially improved structures have been flood-proofed.
F. When flood-proofing is used for a non-residential structure, the director or director's designee shall review the design and operational maintenance plan and obtain certification of design criteria from a registered professional engineer or architect.
G. Notify affected adjacent communities and the Georgia Department of Natural Resources (GA DNR) prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).
H. Where interpretation is needed as to the exact location of boundaries of the special flood hazard area (e.g., where there appears to be a conflict between a mapped boundary and actual field conditions) the director or director's designee shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Chapter 120.
Where floodplain elevations have been defined, the floodplain shall be determined based on flood elevations rather than the area graphically delineated on the floodplain maps.
I. All records pertaining to the provisions of Chapter 700 shall be maintained in the office of the Director or Director's designee and shall be open for public inspection.
J. Coordinate all FIRM revisions with the GA DNR and FEMA.
K. Review variance applications.
700-10.12 Severability. If the provisions of any section, subsection, paragraph, subdivision, or clause of Chapter 700 shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision, or clause of Chapter 700.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 45), 9-26-2023; Ord. No. UDOA2024-00001(GCID 2024-0345), Exh. A, 6-18-2024)
Section 700-20. Permit Procedures and Requirements.
700-20.1 General Permit Procedures. An application for a development permit on any property where a special flood hazard area is located or is proposed to be altered or disturbed in any way shall include, but not be limited to, the following in addition to the requirements of Section 330 of this UDO: plans drawn to scale of the property showing the floodplain, floodway and the nature, location, dimensions, and elevations of existing or proposed structures, fill, storage of materials, and drainage facilities.
700-20.2 Permit Application Requirements.
A. No owner or developer shall perform any development activity on a site where an Area of Special Flood Hazard or Area of Future-conditions Flood Hazard is located without first meeting the requirements of this ordinance prior to commencing the proposed activity.
B. Unless specifically excluded by this Chapter, any landowner or developer desiring a permit for development activity shall submit to Gwinnett County a permit application on a form provided for that purpose.
C. No permit will be approved for any development activities that do not meet the requirements, restrictions, and criteria of this Chapter.
700-20.3 Encroachments.
A. Application Procedure.
1. An application for a development permit which proposes any encroachment into, or alteration of a floodway shall, in addition to the requirements of Chapter 330 of this UDO, require submittal to the Department of complete plans and engineering calculations as required by Chapter 700 for "no rise" certification.
2. The Department shall review and authorize such floodway encroachments prior to the issuance of a development permit and shall obtain from the applicant an engineering "no-rise" certification signed by a professional engineer stating that the proposed development will not create any change to the pre-project base flood elevations, floodway elevations, or floodway widths.
3. If the applicant proposes to revise the floodway boundaries or base flood elevations, no permit authorizing an encroachment into or the alteration of the floodway shall be issued by the Department until an affirmative Conditional Letter of Map Revision (CLOMR) or Conditional Letter of Map Amendment (CLOMA), whichever is applicable, is issued and "no rise" certification is approved by the Department.
4. An application for a map revision shall be submitted first to the Department. Record drawings and calculations shall be required to be provided to the Department by the applicant at the time of completion of the floodway encroachment.
5. Payment of any review fees associated with the review and approval of the encroachment shall be the responsibility of the applicant. Final plats or certificates of occupancy shall not be issued by the Department until an affirmative Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA), whichever is applicable, is issued.
B. Flood Levels Resulting from Floodway Encroachments. Located within Areas of Special Flood Hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity flood waters, debris, or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
1. Encroachments are prohibited, including but not limited to fill, new construction, substantial improvements, and other developments, within the regulatory floodway except for activities specifically allowed in Subsection 700-20.2.B.2 below.
2. Encroachments for bridges, culverts, roadways, and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
C. In areas where the floodplain has been established but the base flood elevation (BFE) and/or the floodway has not been established on FIS maps, no encroachments into areas of special flood hazard, including fill or structures, shall be authorized unless certification by a registered professional engineer is provided to the Department demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the floodplain more than 0.01 foot at any point. The study shall be submitted as a revision/amendment to the FIS maps showing the BFE and the floodway. Approval of the revision/amendment must be received before the final plat can be approved or a certificate of occupancy can be issued.
D. In areas beyond the limits of study on the flood boundary and floodways maps or FIRM, which contains a watercourse, and have greater than 100 acres of surface drainage area above the property, no increase in flood elevations off-site shall be authorized.
700-20.4 Engineering Study Requirements. An engineering study is required (as appropriate to the proposed development activities on the site) when a base flood or future conditions floodplain is located on the property proposed for development. This study shall be prepared by a currently registered professional engineer in Georgia and made a part of the application for a development permit. This information shall be submitted to and approved by the Department prior to the approval of any permit that would authorize the development. The engineering study shall contain, but not be limited to:
A. Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development.
B. Any report that must be submitted for review, in accordance with this Section, must use a step-backwater analysis approved by the Department. Cross-sections (which may be supplemented by the applicant) and flow information from the existing FIS will be obtained whenever available. Where applicable, computations will be shown duplicating FIS results and then computations will be rerun with the proposed modifications to determine the new base flood and future conditions flood profiles.
C. Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions must be provided to show that future conditions floodplain storage capacity will not be diminished by the development.
D. If changes to the base flood or future conditions flood elevation are proposed, profiles of the channel showing the existing and proposed base flood and future conditions flood elevations must be provided.
E. The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future conditions floodplain encroachments.
F. The floodway shall be determined when any encroachment in the floodplain is proposed, or a detailed study is performed to determine flood profiles.
G. Detailed flood studies in areas where the floodplain has been established but the Base Flood Elevation (BFE) and/or the floodway has not been established and in areas beyond the limits of study on the FIRM, which may contain a watercourse, and have greater than 100 acres of surface drainage area above the property, shall be submitted showing the base flood elevations, future conditions flood elevations, and the floodway. Approval of the study must be received before the final plat of the affected lots can be approved or a Certificate of Occupancy can be issued.
700-20.5 Floodplain Management Plan and Plat Requirements. An application for a development project with any Area of Special Flood Hazard or Area of Future-conditions Flood Hazard located on site shall include a floodplain management/flood damage plan. This plan shall include the following items:
A. Site plan drawn to scale, which includes but is not limited to:
1. Existing and proposed elevations of the area in question and the nature, location, and dimension of existing and/or proposed structures, earthen fill placement, amount and location of excavation material, and storage of materials or equipment;
2. For all proposed structures, spot ground elevations at the building corners and 20-foot or smaller intervals along the foundation footprint, or one foot contour elevations throughout the building site;
3. Proposed locations of water supply, sanitary sewer, and utilities;
4. Proposed locations of drainage and stormwater management facilities;
5. Proposed grading plan;
6. Base flood elevations and future-conditions flood elevations;
7. Boundaries of the base flood floodplain and future-conditions floodplain;
8. Location of the floodway, if applicable; and
9. Certification of the above by a licensed professional engineer or surveyor.
B. Building and foundation design detail, including but not limited to:
1. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
2. Design plans certified by a licensed professional engineer or architect for all proposed structure(s).
C. Hard copies and digital files of computer models, copy of work maps, comparison of pre- and postdevelopment conditions base flood elevations, future-conditions flood elevations, flood protection elevations, Special Flood Hazard Areas and regulatory floodways, flood profiles and all other computations and other information similar to that presented in the FIS;
D. The approved floodplain management/flood damage prevention plan shall contain certification by the applicant that all development activities will be done according to the plan or previously approved revisions.
Any and all development permits and/or use and occupancy certificates or permits may be revoked at any time if the construction and development activities are not in accordance with approved plans.
E. All residential lots in a proposed subdivision shall have sufficient buildable area outside of the future conditions floodplain such that encroachments into the future-conditions floodplain for residential structures will not be required.
F. All preliminary plats and site development plans will provide the elevations of proposed structures in accordance with this Chapter.
G. All preliminary plats and site development plans shall be consistent with the need to minimize flood damage.
H. All construction plans for land development shall show public utilities and facilities such as water, sanitary sewer, gas, and electrical systems located and constructed to minimize or eliminate infiltration of flood waters, and discharges from the systems into flood waters.
I. All construction plans for land development include adequate drainage and stormwater management facilities per the requirements of Chapter 800 to reduce potential exposure to flood hazards.
700-20.6 Building Permit Requirements. Prior to the issuance of a building permit for a site which contains or is adjacent to the floodplain, a drawing which shows the elevation of the proposed lowest floor of the building, including basement, the limits of the floodplain, and the highest future conditions flood elevation and base flood elevation (100-year) adjacent to the building, must be submitted to the Department for approval. If the proposed development is located in multiple flood zones or multiple base flood elevation cross the proposed building site, the higher or more restrictive base flood elevation or future condition elevation and development standards shall take precedence at the building site. Proposed grading encroachments must be shown on this drawing. Elevations shall be referenced to an accurate topographical reference (e.g., a recorded final plat whereon the future conditions and the base floodplain is shown).
700-20.6 Other Permits or Approvals.
A. Copies of any additional federal or state permits or approvals as may be required by the Corps of Engineers, Georgia Department of Natural Resources, FEMA, or others shall be provided by the developer upon their approval and maintained on file in the Department of Planning and Development.
B. The Department shall notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).
700-20.7 Construction Stage. For all new construction and substantial improvements on sites with a floodplain management/ flood damage prevention plan which may be shown on a Residential Drainage Plan, the permit holder shall provide to Gwinnett County a certified as-built Elevation Certificate, or Floodproofing Certificate for non-residential construction, including the lowest floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. A final Elevation Certificate shall be provided after completion of construction including final grading of the site. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a licensed land surveyor or professional engineer and certified by the same. When floodproofing is utilized for non- residential structures, said certification shall be prepared by or under the direct supervision of a licensed professional engineer or architect and certified by same using the FEMA Floodproofing Certificate. This certification shall also include the design and operation/maintenance plan to assure continued viability of the floodproofing measures.
Any work undertaken prior to submission and approval of the certification shall be at the permit holder's risk. No framing inspection shall be completed or approved by the Department until such required certification is received and verified by the Department. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit the survey or failure to make said corrections required thereby shall be cause to issue a stop work order for the project.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 45), 9-26-2023) Section 700-30. Standards for Development.
700-30.1 Definition of Floodplain Boundaries.
A. Studied "A" zones, identified in the Gwinnett County Flood Insurance Study identified in Section 700-10.4 shall be used to establish base flood elevations whenever available.
B. For all streams with a drainage area of 100 acres or greater, the base flood elevation and future conditions flood elevation shall be determined from the FIRM and FIS or provided by the Department. If base flood elevation and future conditions flood elevation data is not available, then it shall be determined by a registered professional using FEMA approved methodology. The method of analysis shall be subject to the approval of the Department.
C. The boundaries or limits of the floodplain shall be within 0.5 feet vertical accuracy on the development plan containing existing topographic information.
700-30.2 Definition of Floodway Boundaries.
A. The width of a floodway shall be determined from the FIS or FEMA approved flood study. For all streams with a drainage area of 100 acres or greater, the regulatory floodway shall be provided by the Department.
If floodway data is not available from the Department, then it shall be determined by a registered professional engineer using a method approved by FEMA and the Department.
B. Following a pre-design conference with the Department, the boundaries or limits of the floodway shall be shown on the development plan containing existing topographic information.
700-30.3 General Standards.
A. No development shall be allowed within any Area of Special Flood Hazard or Area of Future-conditions Flood Hazard that could result in any of the following:
1. Raise the base flood or future conditions flood elevation equal to or more than 0.01 foot.
2. Reduce the base flood or future conditions flood storage capacity.
3. Change the flow characteristics of the waters of the base flood or future conditions flood as they pass both the upstream and the downstream boundaries of the property. Verification shall be provided via a step-backwater analysis.
4. Create hazardous or erosion-producing velocities or result in excessive sedimentation.
B. Any development within any Area of Special Flood Hazard or Area of Future-conditions Flood Hazard allowed under 700-30.3 shall also meet the following conditions:
1. Compensation for storage capacity shall occur between the average ground water table elevation and the base flood elevation for the base flood, and between the average ground water table elevation and the future-condition flood elevation for the future-conditions flood. Compensation shall occur within the boundaries of ownership of the property being developed, or within a permanent, recorded flood control easement (which shall be a part of the Departmental record) and shall be within a reasonable proximity to the location of the encroachment. Acceptable means of providing required compensation include: lowering of natural ground elevations within the floodplain; or lowering of adjoining land areas to create additional floodplain; or raising of the future conditions flood elevation within the boundaries of ownership of the property being developed. All cut areas are to be graded to a slope of no less than two percent. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the top of the natural (pre-development) stream channel unless such excavation results from widening or relocation of the stream channel.
2. Cut areas shall be stabilized to a slope of no less than 2.0 percent;
3. Verification of no-rise conditions, flood storage volumes, and flow characteristics shall be provided via a step-backwater analysis meeting the requirements of 700-20.4;
4. Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased;
5. All proposed development shall have public utilities and facilities, such as sewer, gas, electrical and water systems, located and constructed to minimize or eliminate flood damage.
6. Any significant physical changes to the base flood floodplain shall be submitted as a Conditional Letter of Map Revision (CLOMR) or Conditional Letter of Map Amendment (CLOMA), whichever is applicable. The CLOMR submittal shall be subject to approval by the County using the FEMA Community Concurrence forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. Within six months of the completion of development, the applicant shall submit as-built surveys and plans for a final Letter of Map Revision
(LOMR).
C. All subdivision proposals shall identify the Area of Special Flood Hazard and Areas of Future-conditions Flood Hazard therein and provide base flood elevation data and future-conditions flood elevation data.
1. All residential lots in a subdivision proposal shall have sufficient buildable area outside of the future-conditions floodplain such that encroachments into the future-conditions floodplain for residential structures will not be required; and
2. All subdivision plans will provide the elevations of proposed structures in accordance with Section 700-20.5.
700-30.4 Maintenance Requirements. The property owner shall be responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on his property so that the flood-carrying or flood storage capacity is not diminished. Gwinnett County may direct the property owner (at no cost to the County) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not, in the opinion of the County pursuant to the approved plans and floodplain report on file with the Department, performed satisfactory maintenance.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 45), 9-26-2023) Section 700-40. Provisions for Flood Damage Reduction.
700-40.1 General Standards. All new construction and substantial improvement of structures adjacent (residential or non-residential) to special flood hazard areas shall comply with the applicable requirements of the Gwinnett County Construction Code and the following:
A. Buildings/structures, including manufactured homes, shall not be allowed within the limits of the futureconditions floodplain;
B. Buildings/structures shall be constructed with materials and utility equipment resistant to flood damage;
C. Buildings/structures shall be constructed by methods and practices that minimize flood damage;
D. Electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities shall be constructed or located three (3) feet above the base flood elevation or one (1) foot above the futureconditions flood elevation, whichever is higher, so as to prevent water from entering or accumulating within the components during conditions of flooding;
E. New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;
F. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;
G. New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse, or lateral movement of the structure;
H. On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding;
I. Other public utilities such as gas and electric systems shall be located and constructed to avoid impairment to them, or public safety hazards from them, during flooding;
J. New development shall include adequate drainage and stormwater management facilities per requirement of Gwinnett County to reduce exposure to flood hazards;
K. Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces;
L. When only a portion of a parcel is located within a flood zone or the future-conditions floodplain, all new and substantially improved structures on the parcel shall meet requirements of Chapter 700;
M. Any alteration, repair, reconstruction, or improvement to a structure which is not compliant with the provisions of Chapter 700, shall be undertaken only if the non-conformity is not furthered, extended, or replaced.
N. If the proposed development is located in multiple flood zones, or multiple base flood elevations cross the proposed site, the higher or restrictive base flood elevation or future condition elevation and development standards shall take precedence;
O. Subdivision proposals and other proposed new development, including manufactured home parks, shall be reasonably safe from flooding:
1. All such proposals shall be consistent with the need to minimize flood damage within the flood prone area;
2. All public utilities and facilities, such as sewer, gas, electrical, and water systems shall be located and constructed to minimize or eliminate flood damage; and
3. Adequate drainage shall be provided to reduce exposure to flood hazards.
700-40.2 Structures and Buildings Authorized in the Floodplain.
A. Residential Buildings.
1. New construction. New construction of principal residential structures shall not be allowed within the limits of the future-conditions floodplain.
2. Substantial improvements. For substantial improvements to all or part of an existing principal residential buildings, the requirements of Sections 700-20.1 through 700-20.3 and Sections 700-30.1 et seq., shall apply and the elevation of the lowest floor, including basement and access to the building, shall be elevated at least three feet above the level of the highest base flood elevation (100-year) adjacent to the building or at least 1 foot above the future conditions flood elevation whichever is highest. Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with Section 700-40.4 titled "Elevated buildings".
B. Non-Residential Buildings.
1. New construction. New construction of principal non-residential structures shall not be allowed within the limits of the future future-conditions floodplain.
2. Substantial improvements. Substantial improvements to all or part of an existing principal nonresidential buildings may be authorized by the Department to be flood proofed in lieu of being elevated, in accordance with Section 700-40.4 titled "Elevated buildings", provided that all areas of the building less than 1 foot above the base flood elevation or below the future conditions flood elevation, whichever is highest, are water tight with walls substantially impermeable to the passage of water, and use structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify to the Department that the standards of this subsection are satisfied and shall provide the Department a flood proofing certificate including flood proofing level immediately after flood proofing is completed. The certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. The requirements of Sections 700-20.1 through 700-20.3 and Sections 700-30.1, et seq., shall also apply.
C. Accessory and non-habitable buildings and structures. Accessory and non-habitable structures (i.e., barns, sheds, gazebos, and other similar structures) which are permitted to be located within the limits of the floodplain under the provisions of Title 2 of this UDO shall be designed and constructed of flood resistant materials to pass all floodwater and be anchored to prevent flotation, collapse, or lateral movement of the structure in a manner consistent with Chapter 700.
D. Drainage structures and impoundments. Drainage structures and impoundments may be authorized provided they are designed and constructed pursuant to the requirements of this UDO, are approved by the Department, and are consistent with the requirements of Chapter 700. Detention facilities may be located within the future conditions floodplain if the future conditions flood storage capacity is not reduced by the dam and water impounded behind the dam as required in Section 700-30.3.A.
E. Standards for Recreational Vehicles. All recreational vehicles placed on sites must either:
1. Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions).
2. The recreational vehicle must meet all the requirements for residential buildings including the anchoring and elevation requirements.
F. Standards for Manufactured Homes.
1. New manufactured homes shall not be allowed to be placed within the limits of the future-conditions floodplain.
2. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision shall be elevated so that both:
i. The lowest floor of the manufactured home is elevated no lower than three (3) feet above the level of the base flood elevation, or one (1) foot above the future-conditions flood elevation, whichever is higher; and,
ii. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
3. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement in accordance with standards of Section 700-40.1 (K).
700-40.3 Structures and Buildings Authorized Adjacent to the Future Conditions Floodplain.
A. Residential buildings. For new construction or substantial improvement of any principal residential building or manufactured home, the elevation of the lowest floor, including basement and access to the building, shall be at least three feet above the level of the highest base flood (100-year) elevation adjacent to the building or at least 1 foot above the future conditions flood elevation whichever is highest. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with Section 700-40.4.
B. Non-residential buildings. For new construction or substantial improvement of any principal nonresidential building, the elevation of the lowest floor, including basement and access to the building, shall be at least 1 foot above the level of the highest base flood (100-year) elevation adjacent to the building or at least as high as the future conditions flood elevation whichever is highest. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with Section 700-40.4.
700-40.4 Elevated Buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of flood water.
A. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide a minimum of two openings having a total net area of not less than 1 square inch for every square foot of enclosed area subject to flooding.
2. The bottom of all openings shall be no higher than 1 foot above grade.
3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions.
B. So as not to violate the "lowest floor" criteria of Section 700-40.1.A or Section 700-40.1.B, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area.
C. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
700-40.5 Building Standards for Residential Single-lot Developments on Streams without Established Base Flood Elevations and/or Floodway (A-Zones). For a residential single-lot development not part of a subdivision that has areas of special flood hazard, where streams exist but no base flood data have been provided (A-zones), the Director shall review and reasonably use any available scientific or historic flood elevation data, base flood elevation and floodway data, or future conditions flood elevation data available from a federal, state, local or other source, in order to administer the provisions and standards of Chapter 700.
If data is not available from any of these sources, the following provisions shall apply:
A. No encroachments, including structures or fill material, shall be located within an area equal to twice the width of the stream or 50 feet from the top of the bank of the stream, whichever is greater.
B. In special flood hazard areas without base flood elevation or future conditions flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with Section 700-40.6.
700-40.6 Building Standards for Areas of Shallow Flooding (AO-Zones). Areas of Special Flood Hazard may include designated "AO" shallow flooding areas. These areas have base flood depths of one (1) to three (3) feet above ground, with no clearly defined channel. In these areas the following provisions apply:
A. All new construction and substantial improvements of residential and non- residential structures shall have the lowest floor, including basement, elevated to no lower than one (1) foot above the flood depth number in feet specified on the Flood Insurance Rate Map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three (3) feet above the highest adjacent grade. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided in accordance with standards of Section 700-40.4;
B. New construction and substantial improvement of a non-residential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one (1) foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice, and shall provide such certification to the (ordinance administrator) using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan; and
C. Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 45), 9-26-2023; Ord. No. UDOA2024-00001(GCID 2024-0345), Exh. A, 6-18-2024)
Section 700-50. Variances.
700-50.1 Variance Procedures.
A. Requests for variances from the requirements of Chapter 700 shall be submitted to the Department. All such requests shall be heard and decided in accordance with the procedures outlined in the Gwinnett County Stormwater Management Manual and as set forth by the O.C.G.A. § 5-4-1 when certiorari shall lie.
At a minimum, such procedures shall include notice to all affected parties and the opportunity to be heard.
B. Any person adversely affected by any decision of a request for variance shall have the right to appeal the decision to the Board of Construction Adjustments and Appeals in their normal course of business. At a minimum, such procedures shall include notice to all affected parties and the opportunity to be heard.
700-50.2 Evaluation of Variance Requests.
A. In passing upon variance applications for relief from the provisions of Chapter 700, all technical evaluations, all relevant factors, all standards specified in other sections of this Chapter, and the items listed in the Gwinnett County Stormwater Management Manual shall be provided for review.
B. Upon consideration of the factors listed in the Gwinnett County Storm Sewer Pipe Standards and the stated purposes of Chapter 700, such conditions to the granting of a variance as the Board of Construction Adjustments and Appeals deems necessary or appropriate, consistent with the purposes of this Sections may be attached to the variance.
C. Variances shall not be approved within any designated floodway if any increase in flood levels outside the boundaries of ownership of the property being developed or drainage easement during the future conditions or the base flood discharge would result.
D. Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of Chapter 700 are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.
E. Any person requesting a variance shall, from the time of the request until the time the request is acted upon, submit such information and documentation as deemed necessary to the consideration of the request.
F. Variances shall not be issued "after the fact."
700-50.3 Historic Structures. Variances from the requirements of Chapter 700 may be approved for the reconstruction, rehabilitation or restoration of structures listed on the National Register of Historic Places or the State Inventory of Historic Places, and provided the proposed reconstruction, rehabilitation, or restoration will not result in the structure losing its historical designation and provided further that the requirements of Section 700-50.4 herein are met.
700-50.4 Conditions for Variance Approval.
A. Variances shall only be approved upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and in the instance of a historical building, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.
B. Variances shall only be issued upon a finding of the following:
1. A showing of good and sufficient cause.
2. A determination that failure to grant the variance would result in exceptional hardship.
3. A determination that the granting of the variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
C. No variance from the provisions of Chapter 700 may be approved which would allow a structure or use of land otherwise prohibited in the flood hazard area under the provisions of Title 2 of this UDO.
D. Any person to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.
700-50.5 Records and Reports. The Department shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 45), 9-26-2023) Chapter 800. Stormwater Management* Section 800-10. Stormwater Management General.
800-10.1 Stormwater management is intended to lessen the impacts of urbanization on the natural hydrology of the site. The goal is to reduce the amount of stormwater runoff and pollutants that are released, provide for natural on-site control and treatment of runoff, and optimize the location of stormwater management facilities. These goals are met through runoff reduction or water quality, channel protection, overbank flood protection and extreme flood protection.
800-10.2 Runoff reduction practices shall be sized and designed to retain the first 1-inch of rainfall on the site to the maximum extent practicable. Runoff reduction practices are stormwater best management practices, BMP's, used to disconnect impervious and disturbed pervious surfaces from the stormwater drainage system to reduce the post-construction stormwater runoff rates, volumes, and pollutant loads. Runoff Reduction shall be used where practical, prior to using water quality standards. If the Runoff Reduction requirements cannot be met in whole or part, then the water quality standards shall be used to treat the remainder.
800-10.3 Stormwater management systems shall be designed to detain or treat the runoff from 85% of the storms that occur in an average year and reduce the average annual post-development total suspended solids loadings by 80% in order to meet the water quality requirement. The water quality requirement can be waived if the entire 100% of runoff reduction is provided. Water quality and runoff reduction can also be provided in conjunction in order to meet the water quality requirements outlined in the Gwinnett County Stormwater Management Manual.
800-10.4 The increase in the frequency and duration of bankfull flow conditions in stream channels due to urban development is the primary cause of stream bank erosion and the widening and downcutting of stream channels. In order to reduce the effects from urban development within the stream channels, channel protection must be provided. Stream channel protection shall be provided using the following three approaches:
A. 24-hour extended detention storage of the 1-year 24-hour return frequency storm event
B. Erosion prevention measures such as energy dissipation and velocity control
C. Preservation of the applicable stream buffer 800-10.5 Stormwater management facilities shall be designed so that their peak release rates, when combined with those of all bypass areas in the same basin, produce peak flow rates and flow velocities at the site's boundary line no greater than those which occurred at the same location for pre-developed conditions. A downstream analysis may warrant a development to over-detain to protect downstream properties or may even warrant reduction/elimination of detention due to the timing of peak discharges within the watershed as outlined in Sections 800-50.2 and 800-50.3.
800-10.6 The positive effects of stormwater management via on-site stormwater management facilities diminish rapidly as the distance downstream from the point of discharge increases, and the smaller the facility's contribution is, as a percentage of the total runoff contributing to downstream flow, the shorter the distance downstream that the benefits are realized. Because of these limitations, on-site stormwater treatment is effective at controlling flooding only when flow from the facility is a significant percentage of the total flow at the point of interest, and only if the point of interest is immediately downstream. The concepts of immediately downstream and significant percentage of total flow are inseparable. The portion of a receiving watercourse (one which receives and conveys runoff from a site) which lies downstream from the site to the point where the area of the site is 10 percent of the total drainage area, shall generally be considered to constitute that portion of the watercourse which is immediately downstream.
800-10.7 Peak flow rate control shall normally be provided only for the 2-year, 5-year, 10-year, and 25-year frequency storm events in order to meet the requirements of overbank flood protection. The 100-year event shall be provided when failure to do so would result in flooding of other habitable dwellings, property damage, or public access and/or utility interruption (extreme flood protection).
800-10.8 Trout stream protection, when required, can be achieved by using the appropriate stormwater BMP's outlined in the Gwinnett County Stormwater Management Manual. A temperature increase greater than 2°F is not allowed within a trout stream.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-20. Stormwater Management Documentation.
800-20.1 The purpose of Stormwater management documentation is to support the development of the project site using Best Management Practices (BMP's) and diligent engineering. The report must follow the guidelines set forth in the Gwinnett County Stormwater Management Manual and is required for all developments. The report shall be certified by a qualified registered professional registered in the State of Georgia.
800-20.2 A stormwater management analysis shall identify the locations and quantities of stormwater runoff entering and exiting the site for both pre-and post-developed conditions. Analysis of the off-site properties shall anticipate future development in addition to addressing existing conditions.
800-20.3 For the purposes of these regulations, the words "downstream" and "analysis" shall have the following meanings. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage way "immediately" downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is 10 percent of the total basin area. The analysis shall be in accordance with the Gwinnett County Stormwater Management Manual.
800-20.4 The following criteria shall be evaluated by the authorized registered professional preparing the Stormwater Management Report, and in determining whether stormwater treatment is required for any portion of any site:
A. Existing land uses downstream.
B. Anticipated future land uses downstream.
C. Magnitude of increase in peak flows due to development.
D. Presence of existing drainage problems.
E. Capacity of existing and anticipated drainage systems.
F. Creation of concentrated flows where none had occurred previously.
G. Availability of feasible locations for stormwater management facilities.
H. Existing flows generated off-site which pass through the project site.
I. The nature of the receiving watercourse.
800-20.5 When a development uses an existing facility where the last approved certification and record drawing of the facility was over 18 months prior to the new development's submittal, the authorized registered professional shall provide one of the following:
A. A new survey, drawing and certification showing that the outlet structure is constructed as approved on the as-built plan and the flood storage and water quality volume of the facility is equal to or greater than the volume required when the facility was approved.
B. Construction plans and calculations showing that the outlet structure will function as designed and the flood storage and water quality volume of the facility will be equal to or greater than the volume required when the facility was approved once proposed maintenance has been performed.
C. A new record survey, drawing, study, and certification showing that the facility meets the development requirements when the facility was approved.
D. Current inspection of existing stormwater management structures with deficiencies noted
E. BMP Landscaping Plans if required at time of BMP construction.
800-20.6 All design related to stormwater shall be in accordance with the Gwinnett County Stormwater Management Manual and the Gwinnett County Storm Sewer Pipe Standards.
800-20.7 A certified record survey of each facility shall be prepared by an authorized registered professional currently registered in the State of Georgia. A certified record drawing of the facility shall be prepared based upon this survey. The authorized registered professional shall certify that the facility functions hydraulically as designed.
Documentation demonstrating the required testing outlined in the Gwinnett County Stormwater Management Manual for the proposed stormwater BMP shall also be provided. The record drawing shall be submitted to the Department at least one week prior to the issuance of a Certificate of Occupancy or Final Plat approval (as appropriate for the project). Record drawings of off-site facilities shall be recorded at least one week prior to the recording of the Final Plat.
800-20.8 The applicant shall certify and provide documentation that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management report.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-30. Stormwater Runoff Quality/Reduction.
800-30.1 Stormwater runoff quality/reduction can be provided through runoff reduction, water quality, or any combination of the two. The applicant shall provide runoff reduction in accordance with the requirements of the Gwinnett County Stormwater Management Manual. To the extent Runoff Reduction has been determined to be infeasible for all or a portion of the site using the Planning and Development Practicability Policy, then water quality shall apply for the remaining runoff from a 1.2-inch rainfall event. The design professional shall schedule a meeting with Planning and Development when requesting removal or reduction of the runoff reduction requirement.
800-30.2 All projects, unless exempt pursuant to Section 800-90.1, that meet one or more of the following criteria, shall provide water quality treatment or runoff reduction as outlined in the Gwinnett County Stormwater Management Manual.
A. New development that involves the creation or addition of 5,000 square feet or more of impervious cover.
B. New development that involves land-disturbing activities of 1 acre or more.
C. Redevelopment (excluding routine maintenance and exterior remodeling) that creates, add, or replaces 5,000 square feet or greater of new impervious surface area or that involves land disturbing activity of 1 acre or more.
D. New and redevelopment if land development activities that are part of a subdivision or other common plan of development and the sum of all associated impervious surface area or land disturbing activities that are being developed as of such development meets or exceeds the thresholds in A and B above.
E. Runoff from any new development or redevelopment, regardless of size, that is defined by the Director of Water Resources, or their designee, to be a hotspot land use or activity shall be adequately treated and addressed through the use of structural stormwater controls, nonstructural practices, and pollution prevention practices.
F. Linear transportation projects that exceed the threshold in (A) or (B) above.
800-30.3 Requirements for a certified record survey and applicable addendum as necessary to the Stormwater Management Report shall be the same for water quality facilities as for stormwater management facilities in Section 800-20.7.
800-30.4 Stormwater management facilities shall not be embedded within each other.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-40. Stream Channel Protection.
800-40.1 Stream channel protection shall be provided by using all of the following three approaches:
A. 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event. This standard is intended to reduce the frequency, magnitude, and duration of post-development bankfull flow conditions.
The volume to be detained is also known as the channel protection volume (CPv).
B. Erosion prevention measures, such as energy dissipation and velocity control to prevent downstream erosion and stream bank damage.
C. Preservation of the applicable stream buffer. Stream buffers not only provide channel protection but also water quality benefits and protection of streamside properties from flooding.
800-40.2 Channel protection volume is not required for post-development discharges less than 2.0 cfs at each individual discharge location for the 1-yr storm event.
800-40.3 The use of nonstructural site design practices and runoff reduction practices can reduce the channel protection volume by a proportional amount.
800-40.4 Channel protection criteria may be waived for sites that discharge into larger streams, rivers, wetlands, lakes, estuaries, or tidal waters where the reduction in the smaller flows will not have a negative impact on the stream banks or channel integrity.
800-40.5 Stormwater management facilities shall not be embedded within each other.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-50. Stormwater Peak Flow Design Criteria.
800-50.1 Whenever a stormwater management report indicates that an adverse impact from stormwater runoff is expected to result from the development of a property, that project shall be provided with stormwater management facilities that provide storage (i.e., detention, extended detention, or retention) as discussed in the Gwinnett County Stormwater Management Manual. The meaning of "adverse impact" shall apply when pre-development flows did not cause difficulties and post-development flows do. Difficulties shall include, but not be limited to, situations where 25-year velocities exceed the non-erosive velocity of the stream, habitable structures are shown to be subject to increased depth of flooding for any frequency up to and including the regulatory flood, and stormwater facilities that cannot carry the design storm in accordance with these regulations.
800-50.2 Stormwater management facilities required in Section 800-50.1 shall be provided, unless the authorized registered professional certifies and provides certified documentation supporting the conclusion to the Director that at least one of the following is true and correct as applicable.
A. The non-detained, post-development runoff will leave the project site as sheet flow and will not have an adverse impact upon downstream properties. The increase for a 25-year storm should not exceed 1 cfs over a length perpendicular to the flow of 100 feet.
B. The effect of stormwater treatment would be to concentrate flows where sheet flow had occurred under pre-developed- conditions, and any impact of increased sheet flows upon downstream properties would be less adverse than that which would result from the concentrated flows from a stormwater management facility even if energy dissipation devices were employed.
C. The undetained flow will pass through downstream properties, in drainage easements obtained by the developer, to an existing stormwater treatment facility, which has been designed to manage the upstream property's runoff, or to the point in the downstream analysis (see Section 800-20.3) which shows that stormwater treatment is not required.
D. Where the site runoff will flow directly into a stream or lake without crossing off-site properties:
1. 24-hour detention of the one-year storm is not required per section 800-40.4. In this case, the post-development peak flows in the receiving channel may exceed pre-development flows by the smaller value of up to 0.1 percent of the pre-development flows or 3 cfs in the downstream analysis.
2. Only peak detention for the two-year through the 25-year storm, Overbank Flood Protection, is not required if the downstream analysis using timing of the hydrographs shows no adverse impact from the exit of the site to the point immediately downstream from the project in the drainage basin where the project area is 10 percent of the total drainage basin area.
800-50.3 Should the authorized registered professional conclude that overbank flood protection and extreme flood protection may not be necessary because of anticipate compliance with Section 800-50.2, rigid compliance with all of the following criteria is mandatory:
A. A stormwater management report shall always be required whether stormwater detention is required.
B. If the applicant proposes to show that, the stormwater treatment requirement may be eliminated for all or a portion of a project, then a pre-submittal conference with the Department staff is required prior to preparation and submittal of construction plans for the project.
C. At the pre-submittal conference with the staff, the consultant shall be prepared to discuss the downstream analysis findings as follows:
1. The affected stream must be analyzed downstream from the project to a point where the project area is 10 percent of the total drainage basin. The analysis must include all culverts, obstructions, existing and potential erosion problems, elevations of existing improvements, and any other existing modifications to natural conditions.
2. If the existing downstream conditions are overburdened by the pre-developed flows in the stream, then stormwater treatment shall be required unless the developer elects to eliminate the downstream overburdened conditions at his or her expense when the development occurs.
D. If there are any existing drainage complaints downstream, then stormwater treatment shall be required unless the developer elects to minimize the conditions causing the complaint at his or her expense when the development occurs.
E. Even if the overbank flood protection and the extreme flood protection requirements are waived water quality and channel protection are still required as outlined in sections 800-30 and 800-40.
800-50.4 All stormwater management facility hydrologic and hydraulic analysis and design calculations shall be certified by the qualified registered professional. The design shall be in accordance with the Gwinnett County Stormwater Management Manual and the Gwinnett County Storm Sewer Pipe Standards.
800-50.5 All stormwater management facilities designed to treat peak flow, water quality or a combination of the two shall control the peak flow rates associated with storms having 2-year, 5-year, 10-year, and 25-year return frequencies so that flows from the developed site do not exceed those associated with pre-development conditions at the project boundary nor increase the peak flows downstream from the project to the point in the drainage basin where the project area is 10 percent of the total basin. Where adverse impacts, as defined in Section 800-50.1, occur during the 100-year storm, the 100-year storm shall also be regulated.
800-50.6 The hydrologic methodology used for any given project shall conform to the Gwinnett County Stormwater Management Manual.
800-50.7 Runoff coefficients and runoff curve numbers used for pre- and post-development conditions shall be consistent with those shown in the Gwinnett County Stormwater Management Manual.
800-50.8 The USGS Method shall be used to check the magnitude of peak flows.
800-50.9 Calculations shall be provided showing how all times of concentration or lag times were computed, both for pre- and post-developed conditions. Likewise, adequate support must be provided for all composite runoff coefficients or curve numbers used.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-60. Stormwater Management Facility Location and Easement Criteria.
800-60.1 For the purpose of this UDO, a stormwater management facility shall be deemed to consist of the total area of the approved stormwater BMPs outlined in the Gwinnett County Stormwater Management Manual. The stormwater BMPs outlined in the Gwinnett County Stormwater Management Manual are intended to be used in a series or as a standalone, where applicable, to meet the requirements outlined within the Gwinnett County Stormwater Management Manual and Chapter 800 of the UDO. If multiple BMPs are used to meet the stormwater requirements, then all BMP's will be marked a stormwater management facility.
800-60.2 Stormwater management facilities, to the greatest extent feasible, shall be located to minimize the amount of flow generated on the project that bypasses the facility.
800-60.3 No portion of any stormwater management facility shall disturb any required (as opposed to voluntary) buffer, landscape strip, or tree protection area, except that natural bottom stormwater management ponds and its appurtenant structures, which require no grading and removal of trees, may encroach into a required construction buffer.
800-60.4 No portion of a private stormwater management facility shall encroach upon a public right-of-way.
800-60.5 Stormwater management facilities may be located within utility easements or rights-of-way, or encroach upon utility easements or rights-of-way, upon receipt by the Department of written permission from both the property and utility owners.
800-60.6 Stormwater management facilities may be constructed within open space areas required under this UDO, if the following criteria are met:
A. Ownership of the area will be held by a Qualified Property Owner's Association, Homeowners Association, or other private parties.
B. Permanent structures, such as buildings and swimming pools, will not be constructed within the boundaries of the stormwater management facility.
C. Stormwater management facilities within recreation areas will be approved only if the design of the area includes recreation amenities such as ball fields, tennis courts, grassed open areas or other similar improvements. The intent is to provide recreation facilities with stormwater treatment as a secondary feature.
D. Permanent stormwater treatment features shall not interfere with the intended use of the recreation amenity, (i.e., a ditch or large swale shall not traverse a ball field, an inlet structure shall not be in a tennis court, etc.).
800-60.7 If a residential subdivision is provided with an on-site stormwater management facility not located within an open space area as specified in Section 800-60.6 above, then a mandatory property owners' association shall be established for the ownership and maintenance of all stormwater BMP's within a residential subdivision. All stormwater BMP's which are placed on an individual private parcel, or which crosses multiple private lots must be located within a private drainage easement, which will include access to the right-of-way, to be maintained by the HOA. If the project is provided with an off-site stormwater treatment facility, a mandatory property owners' association shall be established for its maintenance. The association bylaws shall be recorded concurrently with the recording of a Final Subdivision Plat.
A. The following stormwater BMP's must be located on a separate lot, owned by the HOA, if not located on a recreation area lot as specified in Section 800-60.6:
1. Bio-retention Areas
2. Dry/Dry Extended Ponds
3. Stormwater Ponds
4. Stormwater Wetlands
5. Submerged Gravel Wetlands
6. Multi-purpose Detention Areas 800-60.8. Residential Stormwater Management Facilities.
A. In a residential subdivision, the following stormwater management facilities are not permitted:
1. Oil-Grit Separator
2. Organic Filter
3. Proprietary Devices
4. Sand Filters
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.