The application of measures and practices applies to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures must be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with the requirements of this section and the NPDES general permit. B. Minimum requirements/BMPs. 1. Best management practices as set forth in Secs. 10.1.3.B. and 10.1.3.C. are required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices may constitute a complete defense to any action by the Director or to any other allegation of noncompliance with this section or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to subsection (f) of O.C.G.A. § 12-5-30. 2. A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained may constitute a separate violation of any landdisturbing permit issued by the local issuing authority or of any state general permit issued by the division pursuant to subsection (f) of O.C.G.A. § 12-5-30, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters must be measured in accordance with guidelines to be issued by the Director. This paragraph does not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres. 3. Failure to properly design, install, or maintain best management practices may constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to subsection (f) of O.C.G.A. § 12-5-30 for each day on which such failure occurs. 4. The Director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur. 5. The local issuing authority may set more stringent buffer requirements than stated in Secs. 10.1.3.C.19, 10.1.3.C.20, and 10.1.3.C.21, in light of O.C.G.A. § 12-7-6(c). 6. All soil, erosion, and sedimentation control measures will be checked daily by the operator and any deficiencies noted will be corrected by the end of each day. Additional soil, erosion, and sediment control measures must be installed if deemed necessary by the local issuing authority after an on-site inspection. 7. If, at any time, any reasonably notable and visible quantity of sediment leaves the property lot lines, impacts other property or any stream buffer zone, additional and appropriate soil erosion and sedimentation control measures shall be added immediately to prevent future violations. C. The rules and regulations, ordinances, or resolutions adopted pursuant to this section for the purpose of governing landdisturbing activities require, as a minimum, protections at least as stringent as the state general permit. Best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, must be consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia," published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following: 1. A construction exit designed in accordance with the "Manual for Erosion and Sediment Control in Georgia" must be the first element developed on a construction site. The construction exit must be maintained in such a way as to prevent any mud from being tracked onto public roads. 2. Stripping of vegetation, regrading and other development activities must be conducted in a manner to minimize erosion. 3. Cut-fill operations must be kept to a minimum. 4. Development plans must conform to topography and soil type, so as to create the lowest practical erosion potential. 5. Whenever feasible, natural vegetation shall be retained, protected, and supplemented. 6. The disturbed area and the duration of exposure to erosive elements must be kept to a practicable minimum. a. Projects with proposed disturbed areas of more than 20 acres will need to be graded in phases or comply with Hall County's Additional Best Management Practices for Large Developments list included in this section. If the project is going to be phased, a proposed phasing plan and schedule will need to be shown on the approved erosion, sedimentation, and pollution control plans. Mulch or temporary grassing must be applied immediately to all exposed soil areas that have been inactive for 14 days. The mulch or temporary grassing coverage must be maintained to a depth of two inches and must have a continuous 90 percent soil surface coverage, or greater until final stabilization has occurred. b. For development projects that disturb more than 20 acres and less than 50 acres, the approved erosion, sedimentation, and pollution control plans must include at least two of the additional BMP's from the Hall County's Additional Best Management Practices for Large Developments list. c. For development projects that disturb more than or equal to 50 acres, the approved erosion, sedimentation, and pollution control plans must include at least four of the additional BMP's from the Hall County's Additional Best Management Practices for Large Development list. 7. Hall County's Additional Best Management Practices for Large Development list include the following: a. Increase all temporary sediment basins and retrofitted storm water management basins to provide sediment storage of at least 3600 cubic feet (134 cubic yards) per acre drained. b. Use baffles in all temporary sediment basins and retrofitted stormwater management basins to at least double the conventional flow path length to the outlet structure. c. Use flocculants or coagulants and/or mulch to stabilize areas left disturbed for more than seven calendar days in accordance with Section III.D.1. of the current NPDES Permit. d. Conduct turbidity sampling after every rain event of 0.5 inch or greater within any 24-hour period, recognizing the exceptions specified in Section IV.D.6.d. of the current NPDES Permits. e. Comply with the applicable end-of-pipe turbidity effluent limit, without the "BMP defense" as provided for in O.C.G.A. § 12-7-6(a)(1). f. Reduce the total planned site disturbance to less than 50 percent impervious surfaces (excluding any state-mandated buffer areas from such calculations). All calculations must be included on the plan. g. Limit the amount of disturbed area at any one time to no greater than 25 acres or 50 percent of the total planned site, whichever is less. All calculations must be included on the plan. h. Use mulch filter berms, in addition to a silt fence, on the site perimeter wherever construction storm water (including sheet flow) may be discharged. Mulch filter berms cannot be placed in waterways or areas of concentrated flow. i. Use appropriate erosion control slope stabilization instead of concrete in all construction storm water ditches and storm drainages designed for a 25-year, 24-hour rainfall event. j. Use flocculants or coagulants under a passive dosing method (e.g., flocculant blocks) within construction storm water ditches and storm drainages that feed into temporary sediment basins and retrofitted management basins. k. Certified personnel for primary permittees shall conduct inspections at least twice every seven calendar days and within 24 hours of the end of the storm that is 0.5 inches rainfall or greater in accordance with Section IV.D.4.a.(3)(a)—(c); secondary permittees, Section IV.D.4.b.(3)(a)—(c); and tertiary permittees, Section IV.D.4.c.(3)(a)—(c). l. Limit the total planned site disturbance to less than 15 percent impervious surfaces (excluding any state mandated buffer areas from such calculations). All calculations must be included in the plan. m. Conduct inspections during the intermediate grading and drainage BMP phase and during the final BMP phase of the project by the design professional who prepared the plan in accordance with Section IV.A.5 of the permit. n. Install Post Construction BMPs (e.g., runoff reduction BMPs) which remove 80 percent TSS as outlined in the Georgia Stormwater Management Manual known as the Blue Book or an equivalent or stringent design manual. 8. Disturbed soil shall be stabilized as quickly as practicable. 9. Temporary vegetation or mulching shall be employed to protect exposed critical areas during development. 10. Permanent vegetation and structural erosion control measures shall be installed as soon as practicable. 11. To the extent necessary, sediment in run-off water must be trapped using debris basins, sediment basins, silt traps, sediment barriers (silt fences, hay bales, rock dams, etc.) or similar measures until the disturbed area is stabilized. Silt fences shall incorporate Georgia Department of Transportation approved fabrics and utilize posts and proper post spacing in conformance to the "Manual for Erosion and Sediment Control in Georgia." As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et seq. and meets the definition of final stabilization as defined in this section. 12. Any land disturbance within 200 feet of stream buffers, wetlands, or other critical areas designated by the Hall County Engineering Department shall require two rows of Type "C" silt fence, or one row of Type "C" silt fence backed by hay bales, appropriately installed, as per the "Manual for Erosion and Sediment Control in Georgia." In addition, for projects that disturb greater than 20.0 acres, any required double rows of silt fence shall be fortified by hay bales below the lower row of silt fence. Furthermore, any site development adjacent to Lake Lanier Boundary shall require double row silt fence with supplemental hay bales for drainage areas directly flowing to the lake. 13. Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping surface of fills. 14. Cuts and fills may not endanger adjoining property. 15. Cuts and fills may be no steeper than a ratio of two units horizontal to one unit vertical, unless a slope stabilization technique, such as a retaining wall, is used with written approval from the local issuing authority. 16. Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners. 17. Grading equipment must cross flowing streams by means of bridges or culverts, except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum. 18. Erosion, sedimentation, and pollution control plans shall include provisions for treatment to control any source of sediments and adequate sedimentation control facilities to retain sediments on site or preclude sedimentation of adjacent streams beyond the levels specified in 10.1.3.B.2. of this section. 19. Adequate erosion and sedimentation control measures which are approved by the "Manual for Erosion and Sediment Control in Georgia" shall be installed prior to, or concurrently with, any grubbing or grading activity, and be maintained until 'final stabilization' has been achieved. 20. There is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except: a. As provided in paragraphs 20 and 21 of this subsection. b. Where the Director determines to allow a variance that is at least as protective of natural resources and the environment. c. Where otherwise allowed by the Director pursuant to O.C.G.A. § 12-2-8. d. Where a drainage structure or roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented. e. Along any ephemeral stream. As used in this provision, the term "ephemeral stream" means a stream: i. That under normal circumstances has water flowing only during and for a short duration after precipitation events; ii. That has the channel located above the groundwater table year round; iii. For which ground water is not a source of water; and iv. For which runoff from precipitation is the primary source of water flow. f. Where shoreline stabilization is installed; provided, however, that this exception shall be limited to the construction of bulkheads and sea walls only to the extent required to prevent the erosion of the shoreline. This exception shall be limited to Lake Oconee and Lake Sinclair and shall be limited to the duration of such construction. g. Unless exempted under division (v) of this subparagraph, buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, O.C.G.A. the "Georgia Water Quality Control Act," shall remain in force unless a variance is granted by the Director as provided in this paragraph. h. No land-disturbing activities shall be conducted within any such buffer; and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed, except as otherwise provided by this paragraph. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed. i. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: i. Stream crossings for water lines; ii. Stream crossings for sewer lines; or iii. Permitted uses specified in Sec. 10.4.6.D.; and j. All requirements of Sec. 10.4.6 shall also be complied with. 21. There is established a 50-foot buffer, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to O.C.G.A. tit. 12, ch. 5, art. 2, the "Georgia Water Quality Control Act," except where a roadway drainage structure must be constructed, provided however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board providing for notice to the division or local issuing authority of the location and extent of the piping and prescribed methodology for minimizing the impact of such piping and for measuring the volume of water discharged by the stream. As any such pipe must stop short of the downstream landowner's property, and the landowner must comply with the buffer requirement for any adjacent trout streams. The Director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer: a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; they cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: i. Stream crossings for water lines; ii. Stream crossings for sewer lines; or iii. Permitted uses specified in subsection 8.170.060.D.; and c. All requirements of Official Code of Hall County, Georgia, section 8.170.060 shall also be complied with. 22. There is established a 25-foot buffer along coastal marshlands, as measured horizontally from the coastal marshland-upland interface, as determined in accordance with O.C.G.A. tit. 12, ch. 5, the "Coastal Marshlands Protection Act of 1970," and the rules and regulations promulgated thereunder, except: a. Where the Director determines to allow a variance that is at least as protective of natural resources and the environment; b. Where otherwise allowed by the Director pursuant to O.C.G.A. § 12-2-8; c. Where an alteration within the buffer area has been authorized pursuant to O.C.G.A. § 12-5- 286; d. For maintenance of any currently serviceable structure, landscaping, or hardscaping, including bridges, roads, parking lots, golf courses, golf cart paths, retaining walls, bulkheads, and patios; provided, however, that if such maintenance requires any landdisturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented; e. Where a drainage structure or roadway drainage structure is constructed or maintained; provided, however, that if such maintenance requires any landdisturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented; f. On the landward side of any currently serviceable shoreline stabilization structure; and g. For the maintenance of any manmade stormwater detention basin, golf course pond, or impoundment that is located entirely within the property of a single individual, partnership, or corporation; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. h. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed, except as otherwise provided by this paragraph. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat. i. The buffer shall not apply to crossings for utility lines that cause a width of disturbance of not more than 50 feet within the buffer, provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. j. The buffer shall not apply to: i. Any land-disturbing activity conducted pursuant to and in compliance with a valid and effective landdisturbing permit issued subsequent to April 22, 2014, and prior to December 31, 2015; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented; or ii. Any lot for which the preliminary plat has been approved prior to December 31, 2015, if roadways, bridges, or water and sewer lines have been extended to such lot prior to the effective date of this Act and if the requirement to maintain a 25-foot buffer would consume at least 18 percent of the high ground of the platted lot otherwise available for development; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. k. Activities where the area within the buffer is not more than 500 square feet or that have a "minor buffer impact" as defined in section 391-3-7- .01(r) of the Rules of the Department of Natural Resources, provided that the total area of buffer impacts is less than 5,000 square feet, are deemed to have an approved buffer variance by rule. Bank stabilization structures are not eligible for coverage under the variance by rule and notification shall be made to the division at least 14 days prior to the commencement of land disturbing activities. D. The board shall promulgate rules and regulations that contain specific criteria for the approval or denial by the Director of requests for variances for road construction and maintenance projects undertaken by the Department of Transportation when: 1. An alteration within the buffer area has been authorized pursuant to a permit issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act of 1972, as amended, or Section 10 of the Rivers and Harbors Act of 1899; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented; or 2. The land-disturbing activity is not eligible for a permit issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act of 1972, as amended, and involves the piping, filling, or rerouting of waters that are not jurisdictional waters of the United States regardless as to whether or not such waters have been classified as primary or secondary trout waters. E. Nothing contained in this section shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in Secs. 10.1.3.B. and 10.1.3.C. F. The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this section or the terms of the permit.