Hall County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE
10.1.4. Application, Permits Process, Generally
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
There are three types of land-disturbing permits:
minor land disturbing, new home construction grading, and general land disturbing.
A. Minor land disturbing permit. Where required pursuant to Sec. 10.1.2.A.8., no person shall conduct any land-disturbing activity within the unincorporated area
of Hall County without first obtaining a minor land-disturbing permit from Hall
County Development Services to perform such activity. Additionally, a minor land disturbing permit shall be required for
the construction of secondary driveways.
The application for a minor land-disturbing permit must contain a current plat or drawing of the property containing the
project which indicates all easements, streams, buffer zones, wetlands, and roadways. Said application must be submitted to Hall County Development Services. A fee as established in the Hall County Plan Review and Inspection Fee
Schedule will be charged for each application. From time to time, upon the recommendation of the county engineer and approval of the board of commissioners of Hall County, Georgia, said schedule may
be revised as deemed necessary. The permit will expire six months from the date of issuance. Additionally, where a minor land-disturbing permit is required Sec. 10.1.4.C.4.f. shall apply.
B. Residential grading permit. The residential grading permit will apply where land disturbance activities (i.e.
grading) are to be performed on residential properties but prior to issuance of a
building permit. The total disturbed area for this permit shall not exceed one acre on single or adjoining properties. The
application for a residential permit must contain a current plat or drawing of the property containing the project which
indicates all easements, streams, buffer zones, wetlands, and roadways. Said
application must be submitted to Hall County Planning and Development. A fee as established in the Hall County Plan Review and Inspection Fee Schedule will be charged for each application. From time to time, upon the recommendation
of the county engineer and approval of the board of commissioners of Hall County, Georgia, said schedule may be revised as deemed necessary. The permit will expire six months from date of issuance.
Additionally, where new home construction grading permit is required Sec.
10.1.4.C.4.f. shall apply.
C. General land-disturbing permit. All other required land-disturbing sites not fitting the minor land-disturbing requirement.
1. General. The property owner, developer, and designated planners and engineers shall review the general development plans and detailed plans of the local issuing authority that affect the tract to be developed and the area surrounding it. They shall review the zoning regulations, watershed protection regulations, subdivision regulations, flood damage prevention regulations, this section, and the other provisions of the Hall County Unified Development Code, and the laws of the State of Georgia which
regulate the development of land within the jurisdictional boundaries of the local issuing authority.
However, the operator is the only party who may obtain a permit.
2. Application requirements.
a. No person shall conduct any land-disturbing activity within the unincorporated area of Hall County without first obtaining an appropriate permit from Hall County Planning and Development to perform such activity and providing a copy of notice of intent submitted to the EPD if applicable.
b. The application for a permit shall be submitted to the local issuing authority and must include the applicant's erosion, sedimentation, and pollution control plan with supporting data, as necessary.
The plans shall include, as a minimum, the data specified in 10.1.4.C.3. of this section.
Erosion, sedimentation, and pollution control plans shall conform to the provisions of Secs. 10.1.3.B. and 10.1.3.C.
Applications for a permit will not be accepted unless accompanied by the appropriate number of copies of the applicant's erosion, sedimentation, and pollution control plans. All applications shall
contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan or that such a visit was not required in accordance with rules and regulation established by the board. Upon plan approval, one reduced size set of plans shall be submitted to Hall County Development Review Division.
c. A fee established in the Hall County Plan Review and Inspection Fee Schedule shall be charged for each application. This application fee allows for an initial review of plans
and a second review of plans to ensure that redlined comments are addressed as well as an additional fee for plans that require third and subsequent reviews. After plans have been permitted, a fee shall be charged for each revision submitted to the county for review, as established in the Hall County Plan Review and Inspection Fee Schedule. From time to time, upon the recommendation of the county engineer and approval of the
board of commissioners of Hall County, Georgia, the fee schedule may be revised as deemed necessary.
d. In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A.
§ 12-5-23(a)(5), in the amount of $80.00 per acre, or fraction of acres to the nearest onetenth acre, of land-disturbing activity, and these fees shall be
calculated and be paid by the primary permittee as defined in the state general permit for each are of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. Out of the $80.00 per
disturbed acre collected, $40.00 shall be submitted to the division; and any and all fees due from an entity which is required
to give notice pursuant to O.C.G.A. § 12-7-17(9) or (10) shall be submitted in full to the division.
e. Soil erosion and sediment control permits shall terminate 12 months from the date of issuance. If the land-disturbing activity has not commenced within said 12 months from
the date of issuance, the person or entity in whose name the permit was issued shall make a new application and pay a reapplication fee as established in the Hall County Plan Review and Inspection Fee Schedule to obtain a new permit pursuant to these regulations before commencing such land-disturbing activity. However, if the landdisturbing activity has commenced but not completed and inspections have been made by
the local issuing authority within said 12 months from the date of issuance, the person or entity in whose name the permit was issued shall make a new application and pay a reapplication fee as established in the Hall County Plan Review and Inspection Fee Schedule to obtain a new permit pursuant to this section before commencing such land-disturbing activity. Should the permit expire and the person or entity in
whose name the permit was issued fail to make a new application within 12 months from the original date of issuance, the permit will be deemed terminated, and the person or
entity will be required to permit the site from start by following subsections 10.1.4.C.2c(a)—(c) above. The foregoing notwithstanding, once the landdisturbing activity has commenced, it shall be completed within six months of the date
of commencement. The reapplication fee for noncommercial sites meeting the criteria as
set forth in subsection 10.1.2.A.8. shall be that fee established in the Hall County Plan Review and Inspection Fee Schedule regardless of whether or not land-disturbing activity has commenced in the past year. Termination of
the permit shall not relieve the property owner of the responsibility for fulfilling the soil erosion and sediment control requirements of the permit, or of this section. From time to time, upon the recommendation of the county engineer and approval of the
board of commissioners of Hall County, Georgia, the above fee schedule may be revised as deemed necessary.
f. Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its
review and approval or disapproval concerning the adequacy of the erosion, sedimentation
and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of a district to
act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by Sec.
10.1.3.C.19., 20., and 21. and bonding, if required as per Sec.
10.1.4.C.2.g.(2), have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district.
g. If a permit applicant has had two or more violations of previous permits, this section, or the Erosion and Sedimentation Act of the State of Georgia, as amended, within three years
prior to the date of the filing of the application under consideration, the local issuing authority may deny the permit application.
The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof, up to but not exceeding $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the landdisturbing activity and bring it into compliance. This subsection shall not apply unless there is in effect an ordinance or
statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
3. Plan requirements.
a. Plans must be prepared to meet the minimum requirements as contained in Secs. 10.1.3.B. and 10.1.3.C. Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the
Georgia Soil and Water Conservation Commission as a guide; or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia, published by the Georgia Soil
and Water Conservation Commission, is hereby incorporated by reference into this section.
The plan for the land-disturbing activity shall consider the interrelationship of the soil
types, geological, and hydrological characteristics, topography, watershed, vegetation, proposed
permanent structures including roadways constructed waterway, sediment control and
storm water management facilities, Hall County ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design
professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections of any land-disturbing activity shall meet the education and training certification requirements, dependent on his
or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12- 7-20.
b. Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the
Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted. Erosion, sedimentation and pollution
control plans shall include:
i. Narrative or notes, and other information. Notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes.
ii. Description of existing land use at project site and description of proposed project.
iii. Name, address, and phone number of the property owner.
iv. Name, phone number, and email address of 24-hour local contact that is responsible for erosion and sedimentation controls.
v. Size of project, or phase under construction, in acres.
vi. Activity schedule including anticipated starting and completion dates for
the project. Include the statement in bold letters, that "the installation of erosion and sediment control measures and practices shall occur prior to or concurrent with landdisturbing activities."
vii. Stormwater and sedimentation management systems, storage capacity, hydrologic study,
calculations, including offsite draining areas and other information as may
be needed to satisfy the requirements of Secs. 10.1 and 10.4.
viii. Location of erosion and sediment control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, and meeting the requirements of this section. Practices may include, but are not
limited to:
i. Construction exit.
ii. Sediment barrier.
iii. Sediment basin.
iv. Grassed waterway (open swale).
v. Storm drain outlet protection.
vi. A plan for temporary and permanent vegetative and structural erosion and sediment control measures.
ix. Vegetative plan for all temporary and permanent vegetative practices, including species, planting dates, and seeding, fertilizer, lime and mulching rates. The vegetative plan should show options
for year-round seeding.
x. Detail drawings for all structural practices.
Specifications shall follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.
xi. A maintenance statement shall be printed on the plan as follows: "Erosion and sedimentation control measures will be maintained at all times.
Additional erosion and sedimentation control measures and practices will be installed if deemed necessary by on-site inspection."
xii. A description of the sedimentation control program and sedimentation control practices.
xiii. An adequate description of general topographic and soil conditions of the tract as available from the Hall County Soil and Water Conservation District.
xiv. A description of the maintenance program for sediment control facilities including inspection programs, vegetative
establishment of exposed soils, method and frequency of removal and disposal of solid waste material removed from control facilities and disposition of temporary structural measures.
xv. Any additional requirement established by the commission.
4. Permits.
a. Permits shall be issued or denied as soon as practicable but, in any event, not later than 45 days after receipt by the local issuing authority of a completed application, providing variance and bonding are obtained, where necessary and
all applicable fees have been paid prior to permit issuance.
The permit shall include conditions under which the activity may be undertaken.
b. No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the
district, and the local issuing authority has affirmatively determined that the plan is in compliance with this section, any variances required by Secs.
10.1.3.C.16. and 17. are obtained, bonding requirements, if necessary, as per Sec.
10.1.4.C.2.g.(2) are met and all ordinances and rules and regulations in effect within the unincorporated area of the county are met. If Hall County is the local issuing authority, then no permit shall be issued without the written approval of the Hall County Engineering Division and the Hall County Department of Planning and Zoning. If the permit is denied, the reason for denial
shall be furnished to the applicant. No permit will be issued unless the plan has been approved by the district and the Department of Planning and Zoning.
c. Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this section, and any other ordinances related to land development, as are applied to private persons, and the division shall enforce such requirements upon the local issuing authority.
d. If the tract is to be developed in phases, then a separate permit shall be required for each phase.
e. The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or that person's successor in the title
is not in compliance with the approved erosion, sedimentation and pollution control plan or that the holder or his successor in title is in violation of this section. A holder of a
permit shall notify any successor in title to him or her as to all or any portion of the land
affected by the approved plan of the conditions contained in the permit.
f. The local issuing authority may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A.
§ 12-7-7(f)(1).
g. No permit may be issued unless the applicant has secured necessary permits from other governing agencies, such as, but not limited to: U.S. Army Corps of Engineer Permits and Georgia Department of Transportation.
h. The development or landdisturbing activity permit must be posted in clear view on the
site.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.