Skip to content
Georgia Commons
Menu

Hall County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE

10.2.1. General Provisions

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Purpose and Intent The purpose of this section is to protect, maintain and enhance the public health, safety, environment and general welfare and to minimize public and private losses due to flood conditions in flood hazard areas, as well as to protect the beneficial uses of floodplain areas for water quality protection, stream bank and stream corridor protection, wetlands preservation and ecological and environmental protection by provisions designed to:

1. Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;

2. Restrict or prohibit uses which are dangerous to health, safety and property due to flooding or erosion hazards, or which increase flood heights, velocities, or erosion;

3. Control filling, grading, dredging and other development which may increase flood damage or erosion;

4. Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or

which may increase flood hazards to other lands;

5. Limit the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of flood waters; and,

6. Protect the stormwater management, water quality, stream bank protection, stream corridor protection, wetland preservation, and ecological functions of natural

floodplain areas.

B. Applicability This section shall be applicable to all areas of special flood hazard within Hall County.

C. Designation of Section Administrator The Hall County Engineer or their designee is hereby appointed to administer and implement the provisions of this section.

D. Basis for Establishing Areas of Special Flood Hazard, Areas of Future-Conditions Flood Hazard and Associated Floodplain Characteristics—Flood Area Maps and Studies For the purposes of defining and determining "areas of special flood hazard," "areas of future-conditions flood hazard," "areas

of shallow flooding," "base flood elevations," "floodplains," "floodways," "futureconditions flood elevations," "futureconditions floodplains," potential flood hazard or risk categories as shown on

FIRM maps, and other terms used in this section, the following documents and sources may be used for such purposes and are adopted by reference thereto:

1. The flood insurance study (FIS) dated September 29, 2006, with accompanying maps and other supporting data and any revision thereto.

2. Other studies which may be relied upon for the establishment of the base flood elevation or delineation of the base or one percent (100- year) floodplain and flood prone areas, including:

a. Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey or any other local, state or federal agency applicable to Hall County; and

b. Any base flood study conducted by a licensed professional engineer which has been prepared by utilizing FEMA approved methodology and approved by the Hall County Engineer.

3. Other studies, which may be relied upon for the establishment of the future-conditions flood elevation or delineation of the future-conditions floodplain and flood prone areas, including:

a. Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey, or any other local, state or federal agency applicable to Hall County; and

b. Any future-conditions flood study conducted by a licensed professional engineer which has been prepared utilizing FEMA approved methodology approved by the Hall County Engineer.

4. The repository for public inspection of the FIS, accompanying maps and other supporting data is located at the Hall County Engineering Office.

E. Compatibility with Other Regulations This section is not intended to modify or repeal any other ordinance, rule, regulation, statute, easement, covenant, deed restriction or other provision of law. The

requirements of this section are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective

standards for human health or the environment shall control.

F. Severability It the provisions of any section, subsection, paragraph, subdivision or clause of this section shall be adjudged invalid by

a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/zoning/10.2.1@2026-05-28-73dd24a540

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Zoning Ordinance, 10.2.1. General Provisions | Georgia Commons