The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Addition. Any walled and roofed expansion to the perimeter or height of a building.
Adjacent. Areas located within the defined horizontal distance from the future-conditions floodplain boundary that are at or lower in
elevation than either three feet above the base flood elevation or one foot above the futureconditions flood elevation, whichever is higher, unless the area is hydraulically independent, (meaning absolutely no connection to the flooding source such as through pipes, sewer laterals, down drains, foundation drains, ground seepage, overland flow, gated or valved pipes, excavated and backfilled trenches, etc., with no fill or other manmade barriers creating the separation).
Appeal. A request for a review of the Hall County Engineer's interpretation of any provision of this section.
Area of future-conditions flood hazard. The land area that would be inundated by the one percent annual chance flood based on futureconditions hydrology (100-year future-conditions flood).
Area of shallow flooding. A designated AO or AH Zone on a community's flood insurance rate map (FIRM) with a one percent or greater
chance of flooding to an average depth of one to three feet, where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
Area of special flood hazard. The land area subject to a one percent or greater chance of flooding in any given year. This includes all floodplain and areas at or below the base flood elevation designated as Zones A, A1-30, A-99, AE, AO, AH, and AR on a community's flood
insurance rate map (FIRM).
Accessory structure or facility. A structure which is on the same parcel of property as the principal structure and the use of which is
incidental to the use of the primary structure.
Base flood. The flood having a one percent chance of being equaled or exceeded in any given year, also known as the 100-year flood.
Base flood elevation. The highest water surface elevation anticipated at any given location during the base flood.
Basement. Any area of a building having its floor subgrade below ground level on all sides.
Building. The same meaning as "structure."
Development. Any manmade change to improved or unimproved real estate, including, but not limited to buildings or other structures, mining, dredging, tilling, clearing, grubbing, grading, paving, any other installation of impervious
cover, excavation or drilling operations or storage of equipment or materials.
Elevated building. A nonbasement building which has its lowest elevated floor raised above the ground level by foundation walls, shear
walls, post, piers, pilings or columns.
Existing construction. Any structure for which the "start of construction" commenced before the effective date of the initial FIRM, November 2, 1983.
Existing manufactured home park or subdivision. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is
completed before the effective date of the initial FIRM, November 2, 1983.
Expansion to an existing manufactured home park or subdivision. The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.
FEMA. The Federal Emergency Management Agency.
Flood or flooding. A general and temporary condition of partial or complete inundation of normally dry land areas from:
1. The overflow of inland or tidal waters;
2. The unusual and rapid accumulation or runoff of surface waters from any source.
Flood insurance rate map or FIRM. An official map of a community, issued by FEMA, delineating the areas of special flood hazard and/or risk premium zones applicable to the
community.
Flood insurance study or FIS. The official report by FEMA providing an examination, evaluation and determination of flood hazards and corresponding flood profiles and water surface elevations of the base flood.
Floodplain or flood prone area. Any land area susceptible to flooding.
Floodproofing. Any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real
property, water and sanitary facilities, structures and their contents.
Floodway or regulatory floodway. The channel of a stream, river, or other watercourse and the adjacent areas that must be reserved in
order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Functionally dependent use. A use which cannot perform its intended purpose unless it is located or carried out in close proximity to water.
The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities.
Future-conditions flood. The flood having a one percent chance of being equaled or exceeded in any given year based on future-conditions
hydrology. Also known as the 100-year futureconditions flood.
Future-conditions flood elevation. The highest water surface elevation anticipated at any given location during the future-conditions flood.
Future-conditions floodplain. Any land area susceptible to flooding by the future-conditions flood.
Future-conditions hydrology. The flood discharges associated with projected land use conditions based on a community's zoning maps, comprehensive land use plans, and/or watershed study projections, and without consideration of projected future construction of stormwater
management (flood detention) structures or projected future hydraulic modifications within a stream or other waterway, such as bridge and culvert construction, fill, and excavation.
Highest adjacent grade. The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
Historic structure. Any structure that is:
1. Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district
preliminarily determined by the Secretary of the Interior to qualify as a registered historic district;
3. Individually listed on a state inventory of historic places by states with historic
preservation programs which have been approved by the Secretary of the Interior;
or
4. Individually listed on a local inventory of historic places by communities with
historic preservation programs that have been certified either:
a. By an approved state program as determined by the Secretary of the Interior, or
b. Directly by the Secretary of the Interior in states without approved programs.
Lowest floor. The lowest floor of the lowest enclosed area, including basement. An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access, or storage, in an area other than a basement area, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this section.
Manufactured home. A structure, transportable in one or more sections, which is built on a permanent chassis and is designed to be used
with or without a permanent foundation when attached to the required utilities. The term includes any structure commonly referred to as a "mobile home" regardless of the date of
manufacture. The term also includes parked trailers, travel trailers and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved
property. The term does not include a "recreational vehicle."
Mean sea level. The datum to which base flood elevations shown on a community's flood insurance rate map (FIRM) are referenced. For purposes of this section, the term is synonymous with National Geodetic Vertical Datum (NGVD)
of 1929 or the North American Vertical Datum (NAVD) of 1988.
New construction. Any structure for which the "start of construction" commenced on or after the effective date of the initial FIRM, November 2, 1983, and includes any subsequent improvements to the structure.
New manufactured home park or subdivision. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the
effective date of the initial FIRM, November 2, 1983.
Owner. The legal or beneficial owner of a site, including, but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Permit. The permit issued by Hall County to the applicant which is required prior to undertaking any development activity.
Recreational vehicle. A vehicle which is:
1. Built on a single chassis;
2. Four hundred square feet or less when measured at the largest horizontal projection;
3. Designed to be self-propelled or permanently towable by light duty truck;
and,
4. Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Repetitive loss. Flood-related damage sustained by a structure on two separate occasions during a ten-year period for which the cost of repairs at the time of each such flood event, on the average, equals or exceeds 25 percent of the market value of the structure before the damage occurred.
Site. The parcel of land being developed, or the portion thereof on which the development project is located.
Start of construction. Includes "substantial improvement," and means the date the permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of the structure on a site such as the pouring of slabs or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation, or the placement of a manufactured home on a foundation.
Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include
excavation for a basement, footings, piers or foundations or the erection of temporary forms;
nor does it include the installation on the property of accessory buildings such as garages or sheds not occupied as dwelling units or part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure. A walled and roofed building (including a gas or liquid storage tank) that is principally above ground, or a manufactured home.
Subdivision. The division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection
with the layout or development of a new street or roadway or a change in an existing street or
roadway.
Substantial damage. Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.
Substantial improvement. Any reconstruction, rehabilitation, addition, or other improvement to a structure taking place during a tenyear period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure prior to the improvement. The market value of the building means (1) the appraised value of the structure prior to the start of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to the damage occurring. This term includes structures which have incurred "substantial damage," regardless of the actual repair work performed. The term does not, however, include those improvements of a structure required to comply with existing state or local health, sanitary, or safety code specifications which are the minimum necessary to assure safe living conditions, which have been identified by the Hall County Building
Official or Hall County Enforcement Officer. The term also does not include any alteration of a historic structure, provided that the alteration will not preclude the structure's continued
designation as a historic structure.
Substantially improved existing manufactured home park or subdivision.
The repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
Variance. A grant of relief from the requirements of this section.
Violation. The failure of a structure or other development to be fully compliant with the
requirements of this section. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this section is presumed to be in violation until such time as that
documentation is provided.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.