A. Definition of Floodplain Boundaries

1. Studied "A" zones, as identified in the FIS, shall be used to establish base flood elevations whenever available.

2. For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations shall be provided by the Hall County Engineer. If future-conditions elevation data is not available from the Hall County Engineer, then it shall

be determined by a licensed profesAPPENDIX A—UNIFIED DEVELOPMENT CODE § 10.2 sional engineer using a method

approved by FEMA and the Hall County Engineer.

B. Definition of Floodway Boundaries The width of a floodway shall be determined from the FIS or FEMAapproved flood study. For all streams with a drainage area of 100 acres or

greater, the regulatory floodway shall be provided by the Hall County Engineer. If floodway data is not available from the Hall County Engineer, then it shall be determined by a licensed professional engineer using a method approved by FEMA and the Hall County Engineer.

C. General Standards

1. No development shall be allowed within any area of special flood hazard of area of future-conditions flood hazard that could result in any of the following:

a. Raising the base flood elevation or future-conditions flood elevation equal to or more than

0.01 foot;

b. Reducing the base flood or future-conditions flood storage capacity;

c. Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future-conditions flood as they pass both the upstream and the

downstream boundaries of the development area; or

d. Creating hazardous or erosionproducing velocities, or resulting in excessive sedimentation.

2. Any development within any area of special flood hazard or area of futureconditions flood hazard allowed under Sec. 10.2.4.C.1. shall also

meet the following conditions:

a. Compensation for storage capacity shall occur between the average ground water table elevation and the base flood elevation for the base flood, and between the average ground water table elevation and the future-condition flood elevation for the future-conditions flood, and lie either within the boundaries of ownership of

the property being developed and shall be within the immediate vicinity of the location of the encroachment. Acceptable

means of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas

to create additional floodplain storage. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the natural (pre-development) stream channel unless such excavation results from

the widening or relocation of the stream channel;

b. Cut areas shall be stabilized and graded to a slope of no less than 2.0 percent;

c. Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are

not increased or decreased;

d. Verification of no-rise conditions (0.01 foot or less), flood storage volumes, and flow

characteristics shall be provided via a step-backwater analysis meeting the requirements of Sec. 10.2.4.D.;

e. Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, shall be located and constructed to minimize or eliminate infiltration or contamination from flood waters; and

f. Any significant physical changes to the base flood floodplain shall be submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. The CLOMR submittal shall be subject to approval by the Hall County Engineer using the FEMA community concurrence forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. Within six months of the completion of development, the applicant shall submit as-built surveys and plans for a final letter of map revision (LOMR).

D. Engineering Study Requirements for Floodplain Encroachments An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except

for a residential single-lot development on streams without established base flood elevations and floodways. This study shall be prepared by a licensed professional

engineer and made a part of the application for a permit. This information shall be submitted to and approved by the Hall

County Engineer prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. Such study shall include:

1. Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;

2. Step-backwater analysis, using a FEMA-approved methodology approved by the Hall County Engineer. Cross-sections (which may be supplemented by the applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles;

3. Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development; and

4. The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.

E. Floodway Encroachments Located within areas of special flood hazard are areas designated as floodway.

A floodway may be an extremely hazardous area due to velocity flood waters, debris or erosion potential. In addition,

floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood

heights. Therefore, the following provisions shall apply:

1. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway, except for activities specifically allowed in Sec.

10.2.4.E.2. below;

2. Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic

analyses performed in accordance with standard engineering practice that the encroachment will not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A licensed

professional engineer must provide supporting technical data and certification thereof; and

3. If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the Hall County Engineer until an affirmative conditional letter of map revision (CLOMR) is issued by FEMA or a no-rise certification is approved by the Hall County Engineer.

F. Maintenance Requirements The property owner shall be responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on the property so that the flood-carrying or flood storage

capacity is maintained. The Hall County Engineer may direct the property owner (at no cost to Hall County) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not

performed maintenance as required by the approved floodplain management plan on file with the Hall County Engineer.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/zoning/10.2.4@2026-05-28-69b18e3b3e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Zoning Ordinance, 10.2.4. Standards for Development | Georgia Commons