Hall County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE
10.4.10. Additional Information Requirements for Development on Buffer Zone
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Properties
A. Any permit applications for property requiring buffers and setbacks hereunder must include the following:
1. A site plan showing:
a. The location of all streams on the property;
b. Limits of required stream buffers and setbacks on the property;
c. Buffer zone topography with contour lines at no greater than five-foot contour intervals;
d. Delineation of forested and open areas in the buffer zone; and,
e. Detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback;
2. A description of all proposed land development within the buffer and setback; and,
3. Any other documentation that Hall County, Georgia may reasonably deem necessary for review of the application and to ensure that the requirements of this section are addressed in the approval process.
B. During development activities, and all phases of construction, the buffer
perimeters shall be marked with a temporary sign at an interval of one per parcel, or every 100 feet, whichever is
less. Signs shall remain in place prior to and during approved construction activities. The sign shall contain the following statement "Streamside Buffer—Do Not
Remove or Alter Existing Native Vegetation." Other plainly visible marking methods are acceptable in lieu of the
signage, including, but not limited to tree save fencing, painted markings on trees, or orange silt fence.
C. Replanting of the buffer shall be required where buffer disturbance has occurred.
The replanting shall be accomplished within 14 days of the buffer impact using native vegetation or by following current Natural Resources Conservation Service
(NRCS) conservation practice standards.
The Hall County Engineer or his/her designee shall approve the revegetation plan.
D. All buffer and setback areas must be recorded on the final plat of the property following plan approval.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.