All land development activity subject to this section shall meet the following requirements: A. An undisturbed natural vegetative buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank. This buffer shall not be altered or reduced by any method in this section. B. An additional setback shall be maintained beyond the natural vegetative buffer, in which all impervious cover shall be prohibited. Stormwater management structures shall be allowed within this setback however, all other grading, filling and earthmoving shall be minimized. The setback shall be either of the following dimensions: 1. For a uniform distance of 25 feet, measured horizontally, from the undisturbed natural vegetative buffer boundary. 2. For a variable distance, measured horizontally, from the undisturbed natural vegetative buffer boundary, provided that the total area encompassed by this impervious setback on the land development activity is equal to, or greater than, the total area that would be encompassed by the uniform distance of 25 feet. C. On properties between 10 acres and 49.9 acres, the impervious setback area may be reduced such that the sum of the undisturbed buffer area and the impervious setback area do not exceed 12 percent of the total property area of the development activity. However, in no case shall the 50-foot undisturbed buffer be reduced or altered to achieve this percentage. D. On properties of 50 acres or larger, the impervious setback area may be reduced such that the sum of the undisturbed buffer area and the impervious setback area do not exceed eight percent of the total property area of the development activity. However, in no case shall the 50-foot undisturbed buffer be reduced or altered to achieve this percentage. E. No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback, except that existing septic systems constructed prior to the effective date of this section may be maintained or replaced, but not enlarged within the required buffer and setback area. F. For water supply watershed districts subject to the requirements of Sec. 6.5 of this UDC, the minimum stream buffer setbacks shall be the greater of the applicable requirements of this section or those in Sec. 6.5.