Hall County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE
10.5.3. Definitions
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
For this section, the terms below shall have the following meanings:
Administrator. The person appointed to administer and implement this section on postconstruction stormwater management for new development and redevelopment in accordance
with Sec. 10.5.5.
Applicant. A person submitting a land development application for approval.
BMP, or best management practice. Both structural devices to store or treat stormwater runoff and nonstructural programs or practices which are designed to prevent or reduce the pollution of the waters of the state.
BMP landscaping plan. A design for vegetation and landscaping that is critical to the performance and function of the BMP including
how the BMP will be stabilized and established with vegetation. It shall include a layout of plants and plant names (local and scientific).
Channel. A natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water.
Detention. The temporary storage of stormwater runoff in a stormwater detention facility for the purpose of controlling the peak discharge.
Detention facility. A structure designed for the storage and gradual release of stormwater runoff at controlled rates.
Development. New development or redevelopment.
Extended detention. The storage of stormwater runoff for an extended period of time.
Extreme flood protection. Measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more.
Flooding. A volume of surface water that exceeds the banks or walls of a BMP, or channel; and overflows onto adjacent lands.
GSMM. The latest edition of the Georgia Stormwater Management Manual, Volume 2: Technical Handbook, and its Appendices.
Hotspot. A land use or activity on a site that has the potential to produce higher than normally found levels of pollutants in stormwater runoff.
As defined by the administrator, hotspot land use may include gasoline stations, vehicle service and maintenance areas, industrial facilities (both permitted under the industrial stormwater general permit and others), material storage sites, garbage transfer facilities, and commercial parking lots
with high-intensity use.
Impervious surface. A surface composed of any material that significantly impedes or prevents the natural infiltration of water into the soil. Gravel parking areas, pavement, and buildings are examples of impervious surfaces, but most retaining walls would not be considered impervious surface due to the nature of their minimal surface area.
Industrial stormwater general permit. The National Pollutant Discharge Elimination System (NPDES) permit issued by Georgia Environmental Protection Division to an industry for stormwater discharges associated with industrial activity. The permit regulates pollutant levels associated with industrial stormwater discharges
or specifies on-site pollution control strategies based on standard industrial classification (SIC) code.
Infiltration. The process of percolating stormwater runoff into the subsoil.
Inspection and maintenance agreement. A written agreement providing for the long-term inspection, operation, and maintenance of the stormwater management system and its components on a site.
Land development application. The application for a land development permit on a form provided by the county along with the supporting documentation required in Sec. 10.5.11.
Land development permit. The authorization necessary to begin construction-related, landdisturbing activity.
Land disturbing activity. Any activity which may result in soil erosion from water or wind and the movement of sediments into state water or onto lands within the state, including, but not limited to clearing, dredging, grading, excavating, and filling of land. Land disturbing activity does not include agricultural practices as described O.C.G.A. § 12-7-17(5) or silvicultural land management activities as described O.C.G.A. § 12-7- 17(6) within areas zoned for these activities.
Linear feasibility program. A feasibility program developed by the county and submitted to the Georgia Environmental Protection Division, which sets reasonable criteria for determining when implementation of stormwater management standards for linear transportation
projects being constructed by the county is infeasible.
Linear transportation projects. Construction projects on traveled ways including, but not limited to roads, sidewalks, multi-use paths and trails, and airport runways and taxiways.
MS4 permit. The NPDES permit issued by Georgia Environmental Protection Division for discharges from the county's municipal separate storm sewer system.
New development. Land disturbing activities, structural development (construction, installation of a building or other structure), and/or creation of impervious surfaces on a previously
undeveloped site.
Nonpoint source pollution. A form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water or groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.
Overbank flood protection. Measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e., flow events that exceed the capacity of the channel and enter
the floodplain).
Owner. The legal or beneficial owner of a site, including, but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Person. Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the
state, any interstate body or any other legal entity.
Post-construction stormwater management.
Stormwater best management practices that are used on a permanent basis to control and treat runoff once construction has been completed in accordance with a stormwater management plan.
Post-development. The conditions anticipated to exist on site immediately after completion of the proposed development.
Practicability policy. The latest edition of the Metropolitan North Georgia Water Planning District's policy on practicability analysis for runoff reduction.
Pre-development. The conditions that exist on a site immediately before the implementation of the proposed development. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time before the first item being
approved or permitted shall establish predevelopment conditions.
Pre-development hydrology. For new development, the runoff curve number determined using natural conditions hydrologic analysis based on
the natural, undisturbed condition of the site immediately before implementation of the proposed development. For redevelopment, the existing conditions hydrograph may take into account the existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property.
Previously developed site. A site that has been altered by paving, construction, and/or land disturbing activity.
Redevelopment. Structural development (construction, installation, or expansion of a building or other structure), creation or addition of impervious surfaces, replacement of impervious surfaces not as part of routine maintenance, and land disturbing activities associated with
structural or impervious development on a previously developed site. Redevelopment does not include such activities as exterior remodeling.
Routine maintenance. Activities to keep an impervious surface as near as possible to its constructed condition. This includes ordinary maintenance activities, resurfacing paved areas, and exterior building changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.
Runoff. Stormwater runoff.
Site. An area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of development, the site includes all areas of land covered under an applicable land development permit.
Stormwater concept plan. An initial plan for post-construction stormwater management at the site that provides the groundwork for the stormwater management plan including the natural resources inventory, site layout concept, initial runoff characterization, and first round stormwater management system design.
Stormwater management facility. Any infrastructure that controls or conveys stormwater runoff.
Stormwater management plan. A plan for post-construction stormwater management at the site that meets the requirements of 8.180.180
D. and is included as part of the land development application.
Stormwater management standards. Those standards set forth in 8.180.170.
Stormwater management system. The entire set of nonstructural site design features and structural BMPs for collection, conveyance, storage, infiltration, treatment, and disposal of stormwater runoff in a manner designed to prevent increased flood damage, streambank channel
erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.
Stormwater runoff. Flow on the surface of the ground, resulting from precipitation.
Subdivision. The division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection
with the layout or development of a new street or roadway or a change in an existing street or roadway.
Other terms used but not defined in this section shall be interpreted based on how such terms are defined and used in the GSMM and Hall County MS4 permit.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.