Skip to content
Georgia Commons
Menu

Hall County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE

11.3.1. Purpose

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Within the districts established by this UDC, or amendments thereto that may later be adopted, there exist lots, structures and uses of land and structures which were lawful before this UDC was passed or amended, but which would be prohibited under the terms of this UDC or any future amendment.

B. To avoid undue hardship, nothing in this UDC may be deemed to require a change in the plans, construction or designated use of any building on which actual construction was lawfully begun before the effective date of adoption or amendment of this UDC and upon which actual building construction has been diligently

carried on. Actual construction is hereby defined to include the placing of construction materials in a permanent position and fastened in a permanent manner,

and demolition, elimination and removal of an existing structure in connection with such construction, provided that actual construction work must be diligently carried on until the completion of the building involved.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/zoning/11.3.1@2026-05-28-ec37e24da0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Zoning Ordinance, 11.3.1. Purpose | Georgia Commons