District Standards The protected groundwater recharge area overlays are hereby designated and consist of all lands within the jurisdiction of Hall County, Georgia that are mapped as significant recharge areas by the Georgia Department of Natural Resources in Hydrologic Atlas 18, 1989 edition and any amend-ments to the Atlas after the listed date. These districts may be further delineated and defined on the Ground Water Recharge Area Protection Overlay Map of the Hall County Official Zoning Map, which is hereby incorporated and made a part of this UDC by reference. A. Use Standards. All uses allowed in the underlying zoning districts, except for those listed as prohibited uses below, are permitted in a significant protected groundwater recharge area overlay, subject to the following conditions and standards: 1. The Department of Natural Resources may not issue any permits for new sanitary landfills not having synthetic liners and leachate collection systems. 2. The Department of Natural Resources may not issue any new permits for the land disposal of hazardous waste. 3. The Department of Natural Resources may require all new facilities permitted or to be permitted to treat, store, or dispose of hazardous waste to perform such operations on an impermeable pad having a spill and leak collection system. 4. New above-ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, must have secondary containment for 110 percent of the volume of such tanks or 110 percent of the volume of the largest tank in a cluster of tanks. (Note: These figures are consistent with US EPA rules for oil pollution prevention, 40 CFR 112.1.) Such tanks used for agricultural purposes are exempt, provided they comply with all federal requirements. 5. New agricultural waste impoundment sites must be lined if they are within: a. A high pollution susceptibility area. b. A medium pollution susceptibility area and exceed 15 acrefeet. c. A low pollution susceptibility area and exceed 50 acre-feet. As a minimum, the liner must be constructed of compacted clay having a thickness of one-foot and a vertical hydraulic conductivity of less than 5 × 10-7 cm/sec or other criteria established by the Natural Resources Conservation Service. (The average size of existing agricultural waste impoundments in Georgia is about 15 acre-feet; sheeps-foot rollers or pans with heavy rubber tires, which are normal equipment for most Georgia earth moving contractors, should be able to compact clay to the recommended vertical hydraulic conductivity.) 6. New homes served by a septic tank or drain field system must be on lots having minimum size limitations as follows, based on application of Table MT-1 of the Department of Public Health Manual (DPH Table MT-1). The minimums set forth in DPH Table MT-1 may be increased further based on consideration of other factors (set forth in Sections A—F) of the DPH Manual. a. 150 percent of the district minimum lot size calculated based on application of DPH Table MT-1 if they are within a high pollution susceptibility area. b. 125 percent of the district minimum lot size calculated based on application of DPH Table MT-1 if they are within a medium pollution susceptibility area. c. 110 percent of the district minimum lot size calculated based on application of DPH Table MT-1 if they are within a low pollution susceptibility area. 7. New manufactured home parks served by septic tank or drain field systems must have lots or spaces having the following size limitations as follows, based on application of Table MT-2 of the Department of Public Health Manual (DPH Table MT-2). The minimums set forth in DPH Table MT-2 may be increased further based on consideration of other factors (set forth in sections A—F) of the DPH manual. a. 150 percent of the subdivision minimum lot or space size calculated based on application of DPH Table MT-2 if they are within a high pollution susceptibility area. b. 125 percent of the subdivision minimum lot or space size calculated based on application of DPH Table MT-2 if they are within a medium pollution susceptibility area. c. 110 percent of the subdivision minimum lot or space size calculated based on application of DPH Table MT-2 if they are within a low pollution susceptibility area. Each recharge area may be determined to have a pollution susceptibility of high, medium, or low based on the Georgia Pollution Susceptibility Map, Hydrologic Atlas 20, 1992 edition. Said map is hereby adopted and made a part of this section. 8. If Hall County requires a larger lot size than required by this Sec. 6.5.5 for homes or manufactured homes, the larger lot size must be used. 9. No construction may proceed on a building or manufactured home to be served by a septic tank unless the Hall County Health Department first approves the proposed septic tank installation as meeting the requirements of the DPH Manual and this Sec. 6.5.5. 10. New facilities which handle hazardous material of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and amounts of ten thousand (10,000) pounds or more on any one day, must perform their operations on impervious surfaces in conformance with any applicable federal spill prevention requirements or the requirements of the Standard Fire Prevention Code. 11. The Department of Natural Resources may require conservative design in any new permits for the spray irrigation of wastewater or the land spreading of wastewater sludge in areas having high pollution susceptibility. This may be accomplished by comparing the Department's Criteria for Slow Rate Land Treatment (February, 1986 or latest edition) with amendments and other technical publications to site specific information submitted by a registered professional engineer for each project. 12. Permanent stormwater infiltration basins may not be constructed in areas having high pollution susceptibility. 13. Exclusive of mining settling basins, new wastewater treatment basins must have an impermeable liner in areas having high pollution susceptibility. B. Any lot of record approved prior to the date of the adoption of this resolution may be exempt from the lot size standards in 6. and 7. above.