--- title: Hall County Zoning Ordinance, Sec. 7.4.5.M.4 collection: local-codes id: local-code:hall-county/zoning/7.4.5.m.4 cite_as: Hall County, Ga., Zoning Ordinance ยง 7.4.5.M.4 canonical_url: https://georgiacommons.org/code/local/hall-county/zoning/7.4.5.m.4 md_url: https://georgiacommons.org/code/local/hall-county/zoning/7.4.5.m.4.md text_url: https://georgiacommons.org/code/local/hall-county/zoning/7.4.5.m.4/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hall-county/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/hall-county/zoning/7.4.5.md next: https://georgiacommons.org/code/local/hall-county/zoning/7.4.5.g.4.md index: https://georgiacommons.org/code/local/hall-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/zoning/7.4.5.m.4@2026-05-28-a7e796998a --- # Hall County Zoning Ordinance, Sec. 7.4.5.M.4 > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / 7.4 - Public/Institutional Uses An application for a tall structure permit shall not be accepted for processing without the information required in this section. An application fee shall be charged by the Department for each such application consistent with applicable law in an amount calculated to reimburse the County for the cost of processing and administering the tall structure application. 4. Exhibits required. Each applicant requesting a tall structure permit under this section shall submit a scaled site plan, scaled elevation view, and supporting drawings, calculations, and other documentation signed and sealed by appropriate licensed professionals or qualified industry experts, showing the location and dimensions of all improvements, including topography (utilizing minimum two-foot contour intervals), tower height require- ments, setbacks, access driveways or easements, parking, fencing, landscaping, adjacent uses, affidavit of inventory as set forth in Sec. 7.4.5.H, and any other information deemed by the Department of Planning and Zoning to be necessary to assess compliance with this section and compatibility with surrounding uses. 5. Review of application by radiofrequency engineer. a. Within five business days of accepting a tall structure permit application, the Department of Planning and Zoning shall refer that tall structure permit application to a radiofrequency engineer for review and recommendation. Within 30 business days after receiving the tall structure permit application for review, the radiofrequency engineer shall submit a detailed report and findings regarding the application to the Department of Planning and Zoning including, but not limited to, the need for the tower in the proposed location, whether or not the height of the tower should be lower than the height requested by the applicant, and possible alternatives for the location of the tower. These findings shall be submitted to the county's Board of Commissioners and the applicant for review within ten business days of receipt by the Department of Planning and Development, along with any staff report or recommendations prepared by the Department of Planning and Development for the Board of Commissioners' consideration. b. The applicant shall have ten business days after receiving the findings of the radiofrequency engineer and staff report to withdraw the tall structure permit application without prejudice. If the application is not withdrawn by the applicant within such time period, it shall be placed on the next available agenda for a public hearing by the Board of Commissioners, consistent with the notice requirements of Sec. 7.4.5.J. 6. Collocation of antennas required. Applicants for the erection of a tower or antenna, except amateur radio operators, shall be required to collocate upon an existing tower structure. An exception to collocation shall only be made if the applicant adequately demonstrates that an existing tower suitable for collocation does not exist in the geographic antenna placement area utilizing the tower inventory maintained by the department, and that no suitable alternative tower structure is available as set forth in