Skip to content
Georgia Commons
Menu

Hall County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / 9.2 - General Design Requirements

9.2.12. Subdivisions Adjacent to or Containing Dams

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The subdividing of land, any portion of which is or will be adjacent to a proposed or existing dam, must be such that:

A. Subdivision lots must have at least 50 feet of frontage on a street dedicated to public use which meets the requirements

for acceptance into, or which is part of, the county road maintenance system.

B. Such lots must be accessible by streets which meet the requirements for

acceptance into, or which are currently part of, the county road maintenance system.

C. There may be no lots which are accessible only by use of a street or streets which cross a proposed or existing dam.

D. No lot may be allowed on any portion of an entire street which crosses a proposed or existing dam unless such lot fronts on a street which meets the requirements

for acceptance into, or which is part of, the county road maintenance system.

E. No dwellings or other buildings designed for human occupancy may be constructed

below any dam within the breach floodway of the dam.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/zoning/9.2.12@2026-05-28-2368b1a857

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Zoning Ordinance, 9.2.12. Subdivisions Adjacent to or Containing Dams | Georgia Commons