--- title: Hall County Zoning Ordinance, 9.3.12. Temporary Dead-End Streets collection: local-codes id: local-code:hall-county/zoning/9.3.12 cite_as: Hall County, Ga., Zoning Ordinance ยง 9.3.12 canonical_url: https://georgiacommons.org/code/local/hall-county/zoning/9.3.12 md_url: https://georgiacommons.org/code/local/hall-county/zoning/9.3.12.md text_url: https://georgiacommons.org/code/local/hall-county/zoning/9.3.12/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hall-county/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/hall-county/zoning/9.3.11.md next: https://georgiacommons.org/code/local/hall-county/zoning/9.3.13.md index: https://georgiacommons.org/code/local/hall-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/zoning/9.3.12@2026-05-28-789def05dc --- # Hall County Zoning Ordinance, 9.3.12. Temporary Dead-End Streets > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / 9.3 - Streets and Other Rights-of-Way Temporary dead-end streets must be provided with a temporary turnaround area which meets the construction requirements for design (sidewalks, curb and gutter not required), maintenance, and removal. If the absence of curb and gutter on a temporary cul-de-sac creates a drainage problem, the subdivider will be required to install appropriate stormwater conveyance devices with concurrence from Hall County Engineering. No lots may be subdivided off any radius of a temporary turnaround. A performance bond is required, and the cul-de-sac must either be removed and the new phase of construction final platted, or the cul-de-sac must be completed, including sidewalks, and curb and gutter, within 15 months or 75 percent buildout, whichever occurs last, from time of final platting.