Temporary dead-end streets must be provided with a temporary turnaround area which meets the construction requirements for design (sidewalks, curb and gutter not required), maintenance, and removal. If the absence of curb and gutter on a temporary cul-de-sac creates a drainage problem, the subdivider will be required to install appropriate stormwater conveyance devices with concurrence from Hall County Engineering. No lots may be subdivided off any radius of a temporary turnaround. A performance bond is required, and the cul-de-sac must either be removed and the new phase of construction final platted, or the cul-de-sac must be completed, including sidewalks, and curb and gutter, within 15 months or 75 percent buildout, whichever occurs last, from time of final platting.