A. Streets The binder layer of asphalt on streets must be placed before final platting. The final topping will be placed up to one year after plat approval or at 75 percent build-out. B. Turn Lanes and Deceleration Lanes Bituminous plant mix paving must consist of a minimum of one and one-quarter inch asphaltic concrete (Type II 9.5 mm Superpave) placed on top of a minimum of four-inch asphaltic concrete binder (19 mm Superpave). The binder and the topping layer of asphalt on residential turn lanes and deceleration lanes must be placed before final platting.