--- title: Hall County Zoning Ordinance, 9.4.9. Sidewalk Construction Requirements collection: local-codes id: local-code:hall-county/zoning/9.4.9 cite_as: Hall County, Ga., Zoning Ordinance ยง 9.4.9 canonical_url: https://georgiacommons.org/code/local/hall-county/zoning/9.4.9 md_url: https://georgiacommons.org/code/local/hall-county/zoning/9.4.9.md text_url: https://georgiacommons.org/code/local/hall-county/zoning/9.4.9/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hall-county/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/hall-county/zoning/9.4.8.md next: https://georgiacommons.org/code/local/hall-county/zoning/9.5.md index: https://georgiacommons.org/code/local/hall-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/zoning/9.4.9@2026-05-28-8be965da9e --- # Hall County Zoning Ordinance, 9.4.9. Sidewalk Construction Requirements > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / 9.4 - Street Construction Requirements In addition to the requirements of Sec. 8.4, the following sidewalk construction requirements apply to all in new residential subdivisions: A. The preliminary engineering plans for sidewalk subdivisions must depict the necessary cross-section, shoulder width, and right-of-way to accommodate the sidewalks. B. For sidewalk installation after final platting, the subdivider is responsible for ensuring that driveways and yards have the necessary slope to accommodate the approved sidewalk cross-section. Driveways poured incorrectly will need to be demolished and reconstructed. Yards that have been graded as to not permit the proper construction of the sidewalk cross-section must be regraded. C. Upon receiving the 45-day punch-list letter, the subdivider is required to complete the construction of the sidewalks and correct any problems with the sidewalks as noted within said notice letter. D. The sidewalk system must be completed prior to release of performance bond. E. All sidewalks must comply with the Americans with Disabilities Act and the Georgia Accessibility Code. F. Once sidewalks are started in a development, sidewalks must be continued throughout the development. G. Sidewalks may be constructed on one or both sides of the street. H. When new sidewalks are placed next to existing sidewalks, a smooth transition is required. I. Expansion joints must be placed between existing and new sidewalks. J. Sidewalks may not be used as part of the driveway. K. Disturbed areas resulting from sidewalk construction must be back-filled, grassed, and mulched. L. Overhead obstructions must be removed prior to completion of sidewalk construction. M. ADA compliant ramps must be installed by the subdivider during curb and gutter installation prior to final plat approval. N. For specific construction requirements and utility locations for streets with sidewalks please see the plates as set forth in the Hall County Standard Details.