--- title: Hall County Zoning Ordinance, 9.5.1. Water Systems collection: local-codes id: local-code:hall-county/zoning/9.5.1 cite_as: Hall County, Ga., Zoning Ordinance ยง 9.5.1 canonical_url: https://georgiacommons.org/code/local/hall-county/zoning/9.5.1 md_url: https://georgiacommons.org/code/local/hall-county/zoning/9.5.1.md text_url: https://georgiacommons.org/code/local/hall-county/zoning/9.5.1/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hall-county/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/hall-county/zoning/9.5.md next: https://georgiacommons.org/code/local/hall-county/zoning/9.5.2.md index: https://georgiacommons.org/code/local/hall-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/zoning/9.5.1@2026-05-28-15f8a15e0c --- # Hall County Zoning Ordinance, 9.5.1. Water Systems > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE Water systems in subdivisions must meet the following requirements. A. Public Water Systems All water systems must be designed and built in accordance with the rules and regulations of the territory service provider. B. Single-Family Residential Subdivision Water Systems 1. All main lines of a community system must be a minimum of 8 inches in diameter. Individual connection must be made to each lot, and pipe sizes for service lines may be no less than three-fourths of an inch in diameter. 2. Systems constructed in subdivisions must have an average pressure of 30 pounds per square inch at each lot and must meet the requirements of Table 9.5.1, Sec. 9.5.2, and the "Standard Construction Practices for Water and Wastewater Systems, Hall County, Georgia." 3. The system must be designed by an engineer licensed in the State of Georgia. Table 9.5.1. Instantaneous Water Demands for Single-family Residential Subdivision Water Systems Total Number of Lots Served GPM per Lot 5 8.0 10 5.0 20 4.3 30 3.8 40 3.4 50 3.0 60 2.7 70 2.5 80 2.2 90 2.1 100 2.0 150 1.6 200 1.3 300 1.2 400 0.9 500 0.8 750 0.7 1,000 0.6 Source: Ameen, Joseph S., Community Water Systems Source Book, p. 50, Technical Proceeding, High Point, N.C., 1965.