--- title: Hall County Zoning Ordinance, 9.6.4. Procedures for Subdivisions collection: local-codes id: local-code:hall-county/zoning/9.6.4 cite_as: Hall County, Ga., Zoning Ordinance ยง 9.6.4 canonical_url: https://georgiacommons.org/code/local/hall-county/zoning/9.6.4 md_url: https://georgiacommons.org/code/local/hall-county/zoning/9.6.4.md text_url: https://georgiacommons.org/code/local/hall-county/zoning/9.6.4/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hall-county/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/hall-county/zoning/9.6.2.md next: https://georgiacommons.org/code/local/hall-county/zoning/9.6.5.md index: https://georgiacommons.org/code/local/hall-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/zoning/9.6.4@2026-05-28-5be9e6027d --- # Hall County Zoning Ordinance, 9.6.4. Procedures for Subdivisions > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / 9.6 - Street Lighting Street lights are required to be provided by the subdivider of all new subdivisions involving new streets, unless waived by the Hall County Traffic Engineer. Unless waived, the subdivider must, at the time of submission of the preliminary plat of the subdivision, present a street light layout prepared by the utility company which will provide the street light service in the subdivision. At the time of and as a requirement of the submission of the final plat, unless granted a waiver as herein provided, the developer must: A. Submit a final street light layout approved by the utility company which will provide the lighting service showing exact location of street lights within the subdivision. This drawing must be approved by the Hall County Traffic Engineer prior to obtaining any building permit within that subdivision. Said layout may be shown on the final plat. Fixtures and standards/poles installed or used must be approved by both the utility company responsible for the maintenance of the facilities and Hall County. The fixtures must be mounted at least 16 feet above the ground and must be appropriately designed to place the majority of the light output over the street. One light must be located at each street intersection, and one light must be located in each cul-de-sac within the subdivision. B. Pay all costs for standards/poles, fixtures, and any other related items or materials necessary for the installation. C. Submit proof of payment for complete installation to the Hall County Traffic Engineer. D. Submit a copy of an executed agreement with the utility company for complete maintenance of all installations.