--- title: Hall County Zoning Ordinance, 9.7.2. Street Improvements Standards collection: local-codes id: local-code:hall-county/zoning/9.7.2 cite_as: Hall County, Ga., Zoning Ordinance ยง 9.7.2 canonical_url: https://georgiacommons.org/code/local/hall-county/zoning/9.7.2 md_url: https://georgiacommons.org/code/local/hall-county/zoning/9.7.2.md text_url: https://georgiacommons.org/code/local/hall-county/zoning/9.7.2/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hall-county/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/hall-county/zoning/9.7.1.md next: https://georgiacommons.org/code/local/hall-county/zoning/9.7.3.md index: https://georgiacommons.org/code/local/hall-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/zoning/9.7.2@2026-05-28-27a4e2db54 --- # Hall County Zoning Ordinance, 9.7.2. Street Improvements Standards > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / 9.7 - Required Improvements A. Specific standards for street construction are contained in Sec. 9.4. B. On-Site Inspection. All construction may be tested following on-site inspection as determined necessary by the County Engineer, should the County Engineer determine that laboratory analysis and/or testing procedures are required to evaluate the quality and/or quantity of a particular improvement. The County Engineer may be authorized to employ a recognized consultant or a recognized testing laboratory or testing service to conduct any necessary examinations. All reports must be made in writing to the County Engineer and a copy provided to the subdivider. Following the collection of samples, the owner must repair all damage. C. Inspection Costs. The subdivider will bear all expense of all testing or examination of street improvements.