A. Specific standards for street construction are contained in Sec. 9.4. B. On-Site Inspection. All construction may be tested following on-site inspection as determined necessary by the County Engineer, should the County Engineer determine that laboratory analysis and/or testing procedures are required to evaluate the quality and/or quantity of a particular improvement. The County Engineer may be authorized to employ a recognized consultant or a recognized testing laboratory or testing service to conduct any necessary examinations. All reports must be made in writing to the County Engineer and a copy provided to the subdivider. Following the collection of samples, the owner must repair all damage. C. Inspection Costs. The subdivider will bear all expense of all testing or examination of street improvements.