Skip to content
Georgia Commons
Menu

Hapeville · Zoning Ordinance

Part II - CODE OF ORDINANCES / Part C - PLANNING AND DEVELOPMENT / Chapter 93 - ZONING / Article 18 - B-P ZONE (BUSINESS PARK)

Sec. 93-18-5. Site development and improvement standards.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

In order to establish and maintain the B-P (Business Park) district as a quality area which will preserve the investments of all landowners and developers, as well as the tax base of the city, all construction and development within the B-P district shall comply with the following standards:

(1) Minimum lot area. The minimum lot area for any building site shall be 10,000 square feet.

(2) Setbacks for front, rear and side yards.

a. There is no setback requirement.

b. Only driveways, interior vehicular circulation drives, permitted signs, and landscaped areas shall be allowed between a building and the front property line.

(3) Buildings.

a. Exterior wall materials shall be one or more of the following:

1. Hard-coat stucco;

2. Stone with either a weathered face or a polished, fluted or broken face. No quarry-faced stone shall be used except in retaining walls;

3. Fiber-cement siding;

4. Glass;

5. Metal and metal panel; or

6. Concrete masonry.

i. Units shall be those generally described by the National Concrete

Masonry Association as "customized architectural concrete masonry units" or shall be broken faced brick-type units with marble aggregate. There shall be no exposed concrete block on the exterior of any building visible from any public right-of-way. Any concrete masonry units that have gray cement color visible from any public right-ofway shall be coated with a coating approved by the

design review committee.

ii. Concrete may be poured in-place, tilt-up or precast.

Poured in-place and tilt-up walls may be exposed or have a finish of stone, a texture, metal panels or screening, or a coating.

Textured finishes shall be coated. Coating shall be an approved cementitious of any epoxy type with a life expectancy of at least ten years.

b. Other exterior wall materials may be used only with the prior approval of the design review committee.

Approval or disapproval will be judged on the appropriateness of the materials when considered in context with other buildings in the same business park.

c. Outside storage of materials is prohibited.

d. Roof-mounted equipment shall be located and/or screened to minimize visibility from streets or surrounding buildings.

(4) Landscaping. Landscaping design standards shall be established during design review. Approval or disapproval will be judged on the appropriateness of the materials when considered in context of the location of the landscaping, the

visibility of the landscaping to the general public on the nearest public right-of-way and in context with other buildings in

the same business park.

(5) Exterior lighting. All exterior lighting shall comply with FAA requirements

related to aircraft safety, and all exterior lighting shall be maintained in accordance with plans and specifications submitted

to and approved by the building official.

History

The history line the source prints at the end of the section.

(Code 1981, § 8-5-170.7; Ord. No. 94-23, § 1, 8-11-1994; Ord. No. 2019-14, § 5, 7-2-2019)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hapeville/zoning/93-18-5@2026-11-11-1606bc12e0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.