In all zoning districts, a grading and drainage plan shall be submitted along with an application for a building permit for the proposed construction of a structure and the pavement of driveways and parking which will cover an excess of 35 percent of the lot area with impervious materials. The plans shall include an analysis of stormwater runoff under existing site conditions and under proposed developed site conditions. If the city engineer determines an increase in the stormwater runoff would create flooding of public and/or private property during a ten-year frequency storm, those plans shall include the details of providing and maintaining a flow and storage capacity sufficient to avoid potential flooding identified. The issuance of an occupancy permit shall not be granted until required drainage improvements are completed and approved by the city engineer.