Skip to content
Georgia Commons
Menu

Hapeville · Zoning Ordinance

Part II - CODE OF ORDINANCES / Part C - PLANNING AND DEVELOPMENT / Chapter 93 - ZONING / Article 30 - SOLAR ENERGY SYSTEMS

Sec. 93-30-6. Requirements for rooftop solar energy systems.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Solar access. Consistent with O.C.G.A.

§ 44-9-20 et seq., a property owner may obtain a solar easement from another property owner for the purpose of ensuring the rooftop SES adequate exposure to sunlight.

(b) Tree removal. The removal of trees or natural vegetation for a rooftop SES shall be avoided to the extent reasonably practicable and shall comply with the requirements of section 93-2-14.

(c) Height. A rooftop SES shall be given an equivalent exemption, if any, to the applicable zoning district's height restrictions for roofmounted mechanical devices or equipment, except a rooftop SES mounted on a sloped roof shall not

vertically exceed the highest point of the roof to which it is attached.

(d) Roof setback. A setback from all roof edges, as defined by most recent the International Fire Code adopted by the state at the time the rooftop solar energy system is installed, shall be provided for rooftop solar energy systems to ensure that firefighters may access the roof in a quick and safe manner and may penetrate the roof to create ventilation if necessary.

(e) Visibility. Solar energy systems shall not be allowed on a street-facing sloped roof unless the building owner demonstrates that other locations will result in a decrease in expected energy production of at least 40 percent.

(f) Slope. Street facing rooftop SES shall be flush with or parallel to the roofline on a sloped roof. Solar panels not visible from the right-ofway may be tilted up to 15 percent from the roofline on a sloped roof.

(g) Equipment placement. Solar energy equipment shall be installed, when possible, inside walls and attic spaces to reduce their visual

impact.

(h) Decommissioning plan. A decommissioning plan will be required for all rooftop systems and subject to current state and local regulations.

History

The history line the source prints at the end of the section.

(Ord. No. 2020-23, § 1, 9-15-2020)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hapeville/zoning/93-30-6@2026-11-11-2c7f6bcef4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hapeville Zoning Ordinance, Sec. 93-30-6. Requirements for rooftop solar energy systems | Georgia Commons