Haralson County · Zoning Ordinance
Part - CODE OF ORDINANCES / Chapter 50 - ZONING TABLE OF CONTENTS / Article I - IN GENERAL
Sec. 50-6. Individual detached single-family dwellings.
About this text
- As published by Municode, current through 2023-06-06
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Any single-family dwelling shall be constructed or installed so as to comply with the codes currently in effect in the county at the time a permit is issued; provided, however, said dwelling shall contain not less than 800 square feet of habitable area.
(b) For construction purposes, a temporary utility connection may be obtained after securing a building permit. Permanent utility installation will be allowed only after the final inspection of the building, approval of the building inspector, and the issuance of a certificate of occupancy.
(c) Any dwelling which is damaged beyond repair by fire or a natural or manmade disaster shall be removed and disposed of within a time period not to exceed 60 days after said damage occurred. An extension of this time may be approved by the zoning administrator or his designated agent.
History
(Ord. of 12-7-2004, art. VI, § 6.2)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.