Skip to content
Georgia Commons
Menu

Haralson County · Zoning Ordinance

Part - CODE OF ORDINANCES / Chapter 50 - ZONING TABLE OF CONTENTS / Article I - IN GENERAL

Sec. 50-6. Individual detached single-family dwellings.

About this text

  • As published by Municode, current through 2023-06-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Any single-family dwelling shall be constructed or installed so as to comply with the codes currently in effect in the county at the time a permit is issued; provided, however, said dwelling shall contain not less than 800 square feet of habitable area.

(b) For construction purposes, a temporary utility connection may be obtained after securing a building permit. Permanent utility installation will be allowed only after the final inspection of the building, approval of the building inspector, and the issuance of a certificate of occupancy.

(c) Any dwelling which is damaged beyond repair by fire or a natural or manmade disaster shall be removed and disposed of within a time period not to exceed 60 days after said damage occurred. An extension of this time may be approved by the zoning administrator or his designated agent.

History

The history line the source prints at the end of the section.

(Ord. of 12-7-2004, art. VI, § 6.2)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:haralson-county/zoning/50-6@2023-06-06-358f116632

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Haralson County Zoning Ordinance, Sec. 50-6. Individual detached single-family dwellings | Georgia Commons