--- title: Haralson Zoning Ordinance, 15.13. Building Permit Required collection: local-codes id: local-code:haralson/zoning/15.13 cite_as: Haralson, Ga., Zoning Ordinance ยง 15.13 canonical_url: https://georgiacommons.org/code/local/haralson/zoning/15.13 md_url: https://georgiacommons.org/code/local/haralson/zoning/15.13.md text_url: https://georgiacommons.org/code/local/haralson/zoning/15.13/text source_url: https://library.municode.com/ga/haralson date: 2026-11-11 status: active jurisdiction: city:haralson jurisdiction_name: Haralson place_fips: "1336528" corpus_version: local-codes-haralson-da13393e121d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/haralson/zoning/~appendix-a/~article-15.md previous: https://georgiacommons.org/code/local/haralson/zoning/15.12.md next: https://georgiacommons.org/code/local/haralson/zoning/15.14.md index: https://georgiacommons.org/code/local/haralson.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:haralson/zoning/15.13@2026-11-11-ed9baaea20 --- # Haralson Zoning Ordinance, 15.13. Building Permit Required > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article 15 - ADMINISTRATION A. No building or other structure shall be located, erected, moved, added to, or structurally altered, to include rewiring of any electrical system or alterations or additions in plumbing without a building permit issued by the Building Inspector. No building permit shall be issued except in conformity with the provisions of this Ordinance. B. It shall be unlawful to commence the excavation or filling of any lot for construction of any building until a building permit has been issued for such work. C. No permit shall be required for any non-structural repairs of any building which does not increase the floor area of such building. D. All applications for building permits shall be accompanied by plans or sketch in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the sizes and locations on the lot of any existing buildings or structures, the shape, size, height, use and location on the lot of the building or structure proposed to be erected or altered, setback distances, any parking spaces, and such other information as may be necessary to provide for the enforcement of the provisions of this Ordinance. If no substantial construction progress has been made within six months of the date of the issuance of the building permit, the permit becomes invalid and a new building permit shall have to be issued.