6.8. Underground Utilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All utilities are required to be placed underground in all new developments of two (2) or more lots except where the Council determines underground utilities are infeasible due to shallow rock, high water table, or other similar geologic or hydrologic conditions.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:haralson/zoning/6.8@2026-11-11-7eab2c7bbb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.