Harlem · Zoning Ordinance
Part III - LAND DEVELOPMENT CODE / Chapter 102 - BUILDING REGULATIONS / Article I - IN GENERAL
Sec. 102-5. Construction restrictions.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) No construction may be initiated within the city for any residential building of any type which:
(1) Employs a gravity tank type, flushometer-valve, or flushometer-tank that uses more than an average of 1.6 gallons of water per flush;
(2) Employs a showerhead that allows a flow of more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure;
(3) Employs a urinal that uses more than an average of 1.0 gallons of water per flush;
(4) Employs a lavatory faucet or lavatory replacement aerator that allows a flow of more than 2.0 gallons of water per minute; or
(5) Employs a kitchen faucet or kitchen replacement aerator that allows a flow of more than 2.5 gallons of water per minute.
(b) There shall be no construction of any commercial building initiated within the city for any commercial building of any type which does not meet the requirements of subsection (a) of this section.
(c) The requirements of subsection (a) of this section shall apply to any residential construction and to any commercial construction which involves the repair or renovation of or addition to any existing building when the repair or renovation of or addition to the existing building includes replacement of toilets or showers or both.
History
(Code 2004, § 53.03; Ord. No. 316, 5-13-1991)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.