Any facility engaged in the extraction of earth products, such as sand, soil, gravel, rock, stone, clay, or other mining operations, etc. shall comply with the following: (1) Permanent roads, defined as those to be used in excess of one year, within the excavation site shall be surfaced with a dust-free material. (2) Roads other than permanent roads shall be treated with dust inhibitors that will reduce the generation from dust from the road surfaces as a result of wind or vehicular action. (3) The proposed extraction shall not take place within 300 feet of a property containing a dwelling, school, church, hospital, or public building. (4) Product piles, spoil piles, and other accumulations of by-products shall not be created to a height more than 35 feet above the original contour. (5) All blasting operations shall occur between sunrise and one hour after sunset.