Skip to content
Georgia Commons
Menu

Harlem · Zoning Ordinance

Part III - LAND DEVELOPMENT CODE / Chapter 108 - LAND USE / Article IV - REGULATIONS FOR SPECIFIC USES

Sec. 108-112. Solid waste handling facilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Access from paved streets, with acceleration and deceleration lanes, built according to state DOT specifications, shall be required.

(b) Access shall not be allowed through any residential subdivision or residential development.

(c) A minimum 100-foot wide buffer is required adjacent to any property line containing a residential use.

(d) A minimum 50-foot wide buffer is required adjacent to public rights-of-way.

(e) A minimum six-foot high solid fence/wall shall be required inside buffers adjacent to any property line containing a residential use.

(f) The owner shall provide the community development director with a current copy of a state solid waste-handling permit prior to applying for a land disturbance permit.

(g) Vehicles shall be allowed into a landfill site only if waste is covered to prevent blowing of material from the vehicle.

History

The history line the source prints at the end of the section.

(Code 2004, § 152.081; Ord. No. 381, 4-10-2006)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harlem/zoning/108-112@2026-11-11-928fbf9012

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harlem Zoning Ordinance, Sec. 108-112. Solid waste handling facilities | Georgia Commons