All solar energy systems are subject to supplemental and use-specific regulations. Principal solar energy systems and accessory solar energy systems referenced as a conditional use require legislative approval as provided by this chapter and are subject to all conditions listed in applicable sections of this chapter and may be subject to additional conditions of the legislative body. Accessory solar energy systems referenced as administrative permit uses may be approved by the community development director or his designee subject to the adherence to the conditions listed in the applicable sections of this chapter. (1) Land uses listed in table 3.1 shall be permitted with conditions or permitted as a conditional use in each applicable zoning district. Uses shall not be permitted, buildings and structures associated with such use shall not be erected, structurally altered or enlarged on property, unless said use is permitted within the applicable zoning district as listed in table 3.1 and in accordance with one of the following designations: a. P (permitted use): indicates that the use is permitted in the zoning district. b. AP (administrative permit): indicates the use is permitted in the zoning district subject to administrative review and use-specific requirements contained in section 110-9. c. C (conditional use): indicates that the use may be permitted by the governing body subject to use-specific requirements contained in section 110-8 and procedural requirements listed in the city/town/county ordinance. (2) Any listed use that does not have a letter P, AP, or C listed in a particular zoning district is prohibited in that zoning district. (3) The size of any solar system within this jurisdiction shall be determined based first upon the square footage of all equipment and, if necessary, second upon electrical capacity of the system. TABLE 3.1. SOLAR ENERGY SYSTEM—APPLICATION REVIEW PROCESS Residential Low-Density (R-1A and R-1B) Residential Medium Density (R-2 and R-3) Residential High-Density (R-4) Commercial/Business (B-1, B-2, B-3, P-1) Industrial (I-1) and Agriculture (A-1) PUDs, MUDs, Conservation Preservation Principal solar energy system (PSES) Groundmounted solar energy system CCCCCC Accessory solar energy system (ASES) Groundmounted with coverage of more than 50 percent of the footprint of the principal structure on the lot SC C C C C C Groundmounted with coverage of less than 50 percent of the footprint of the principal structure the on lot AP AP AP AP AP AP Residential Low-Density (R-1A and R-1B) Residential Medium Density (R-2 and R-3) Residential High-Density (R-4) Commercial/Business (B-1, B-2, B-3, P-1) Industrial (I-1) and Agriculture (A-1) PUDs, MUDs, Conservation Preservation Buildingmounted (non-flush mounted) or parkingmounted AP AP AP AP AP AP Buildingmounted (flushmounted) or building integrated PPPPPP S—Not permitted by right, but are subject to approval by a locally appointed and elected body. AP—Permitted by right but are subject to additional land-use specific provisions (administrative process). P—Permitted by right and are processed through building permit procedures.