--- title: Harlem Zoning Ordinance, Sec. 112-120. Minimum control requirements collection: local-codes id: local-code:harlem/zoning/112-120 cite_as: Harlem, Ga., Zoning Ordinance § 112-120 canonical_url: https://georgiacommons.org/code/local/harlem/zoning/112-120 md_url: https://georgiacommons.org/code/local/harlem/zoning/112-120.md text_url: https://georgiacommons.org/code/local/harlem/zoning/112-120/text source_url: https://library.municode.com/ga/harlem date: 2026-11-11 status: active jurisdiction: city:harlem jurisdiction_name: Harlem place_fips: "1336696" corpus_version: local-codes-harlem-95c10ecad62b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harlem/zoning/~part-iii/~chapter-112/~article-v.md previous: https://georgiacommons.org/code/local/harlem/zoning/112-89-to-112-119.md next: https://georgiacommons.org/code/local/harlem/zoning/112-121.md index: https://georgiacommons.org/code/local/harlem.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:harlem/zoning/112-120@2026-11-11-99da2eb96a --- # Harlem Zoning Ordinance, Sec. 112-120. Minimum control requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - LAND DEVELOPMENT CODE / Chapter 112 - STORMWATER MANAGEMENT / Article V - BASIC STORMWATER MANAGEMENT DESIGN CRITERIA All stormwater management practices will be designed so that the specific storm frequency storage volumes (e.g., recharge, water quality, channel protection, ten-year, 100-year) as identified in the LDM are met, unless the city grants the applicant a waiver or the applicant is exempt from such requirements. In addition, if hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, the city's right to impose any and all additional requirements deemed in volume, timing, and rate of runoff. ## History (Ord. No. 1812, § 5.1, 7-23-2018)