Skip to content
Georgia Commons
Menu

Harlem · Zoning Ordinance

Part III - LAND DEVELOPMENT CODE / Chapter 112 - STORMWATER MANAGEMENT / Article VII - CONSTRUCTION INSPECTION

Sec. 112-170. As-built plans.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All applicants are required to submit actual as-built plans for any stormwater management practices located both on-site and off-site after final construction is completed in a format specified in the current LDM. The plan must show the final design specifications for all stormwater management facilities and must be certified by a professional engineer, landscape architect or registered surveyor licensed in the state. A final inspection by the city is required before the release of any performance securities can occur.

History

The history line the source prints at the end of the section.

(Ord. No. 1812, § 7.2, 7-23-2018)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harlem/zoning/112-170@2026-11-11-5bd16d56bf

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harlem Zoning Ordinance, Sec. 112-170. As-built plans | Georgia Commons