Sec. 114-152. Final plat review process.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The developer of a proposed subdivision shall meet with the city manager to discuss what is required for final plat approval in terms of documents, fees, and schedules. The developer shall submit to the city manager two complete final plat application packages. The final plat application package shall be carefully checked by the city manager or designee to determine whether or not it is complete. If it is incomplete it will be returned to the developer with an explanation of why it is incomplete and what must be done to make it complete. For every submittal, the city manager shall have at least 15 working days for review of the final plat, and preparing comments.

If the final plat application package is complete, it will be accepted by the city manager or designee; the date of acceptance will be noted. If after review of the submitted final plat the city manager approves the final plat, it shall be placed on the next regularly scheduled meeting agenda for the planning and zoning commission and forwarded to the planning and zoning commission for approval. After approval by the planning commission, the final plat shall be signed by the city manager and planning director and recorded.

Prior to recording the final plat, the developer shall provide to the city manager a complete and accurate set of as-built drawings in both paper and electronic form. These as-built drawings must be approved by the city prior to approval of the final plat. Prior to recording the final plat, the developer shall complete all required improvements. The city may allow for sidewalks to be installed at the time building permits are issued as a requirement of the development. However, installation of sidewalks and other pedestrian paths adjacent to public amenities shall be installed in conjunction with said amenities construction. In regards to the the installation of landscaping for the public areas, those improvements must also be inspected and approved by the city. If for any reason, it is not possible or practical for the developer to be able to complete the landscape work within a reasonable period of time, the developer may post a cash bond or acceptable performance bond, the amount of which shall be determined by the city, pending the satisfactory completion of the work. Prior to recording the final plat, the developer must post with the city an acceptable maintenance bond to guarantee the quality and workmanship of the required improvements for a period of not less than two years following the date the final plat is actually recorded.

History

The history line the source prints at the end of the section.

(Code 2004, § 155.68; Ord. No. 1710, 7-24-2017; Ord. No. 1902, 2-25-2019)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harlem/zoning/114-152@2026-11-11-34ef4983c8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harlem Zoning Ordinance, Sec. 114-152. Final plat review process | Georgia Commons