Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 1 - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL ORDINANCE

1005.02. Minimum requirements/BMPs.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Best management practices (BMPs) as set forth in Sections 1005.02 and 1005.03 of this article shall be required for all land-disturbing activities. Proper design, installation, and maintenance of BMPs shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph

(b) of this subsection or any substantially similar terms contained in a permit for the discharge of storm water issued pursuant to O.C.G.A. § 12-5- 30(f), the "Georgia Water Quality Control Act".

As used in this subsection, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A.

§ 12-7-6(b).

(b) A discharge of storm water runoff from disturbed areas where BMPs have not been properly designed, installed, and maintained shall constitute a separate violation of any landdisturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act", for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.

(c) Failure to properly design, install, or maintain BMPs shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A.

§ 12-5-30(f), the "Georgia Water Quality Control Act", for each day on which such failure occurs.

(d) The director may require, in accordance with regulations adopted by the Board of Natural Resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.

(e) The local issuing authority may set more stringent buffer requirements than stated in subsection 1005.03(o), in light of O.C.G.A. § 12- 7-6(c).

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/1005.02@2023-12-05-3c34ae35b5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 1005.02. Minimum requirements/BMPs | Georgia Commons