--- title: Harris County Zoning Ordinance, 1008.02. Stop-work orders collection: local-codes id: local-code:harris-county/zoning/1008.02 cite_as: Harris County, Ga., Zoning Ordinance ยง 1008.02 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/1008.02 md_url: https://georgiacommons.org/code/local/harris-county/zoning/1008.02.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/1008.02/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-10/~division-1.md previous: https://georgiacommons.org/code/local/harris-county/zoning/1008.01.md next: https://georgiacommons.org/code/local/harris-county/zoning/1008.03.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/1008.02@2023-12-05-5ce5009f84 --- # Harris County Zoning Ordinance, 1008.02. Stop-work orders > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 1 - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL ORDINANCE / 1008 - Penalties and incentives. (a) For the first and second violations of the provisions of this article, Community Development Director or designee shall issue a written warning to the violator. The violator shall have 5 days to correct the violation. If the violation is not corrected within 5 days, the Community Development Director or designee shall issue a stop-work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning; (b) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order; and; (c) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. (d) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where BMPs have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop-work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion, sedimentation and pollution controls.