Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT / 1013 - Applicability and exemptions.

1013.01. Applicability.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) An adequate drainage system, designed in accordance with this section, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be provided for the proper drainage of

all surface water.

(b) All persons proposing development or construction in the County shall prepare a stormwater management plan. The stormwater management plan shall address the requirements of this section, and the on-site drainage including lot-to-lot drainage and off-site impacts.

The stormwater management plan shall also meet the minimum standards of the current edition of the "Georgia Stormwater Management Manual." No final subdivision plat shall be approved and no development or building permit shall be issued until and unless the stormwater management plan has been reviewed and approved by the Community Development Department Director, except as exempt below.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/1013.01@2023-12-05-811d1eb0f2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 1013.01. Applicability | Georgia Commons