--- title: Harris County Zoning Ordinance, 1014.03. Stormwater detention facility collection: local-codes id: local-code:harris-county/zoning/1014.03 cite_as: Harris County, Ga., Zoning Ordinance ยง 1014.03 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.03 md_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.03.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.03/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-10/~division-2.md previous: https://georgiacommons.org/code/local/harris-county/zoning/1014.02.md next: https://georgiacommons.org/code/local/harris-county/zoning/1014.04.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/1014.03@2023-12-05-bed6091c9b --- # Harris County Zoning Ordinance, 1014.03. Stormwater detention facility > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT location criteria. For purposes of these regulations, a detention facility shall be deemed to consist of the area within the maximum design ponding limits, the dam (if one) including all embankment slopes and wall footings (if applicable), primary and emergency outlet works, any drainage and access easements, and any energy dissipation devices. (a) In residential subdivisions, any required retention and/or detention areas shall be incorporated into the common areas of the residential development or incorporated into an individually platted parcel, which the homeowners association shall be responsible for its maintenance and continuing operation. (b) In nonresidential subdivisions, the detention facility may be located on a separate lot and owned by a property owners' association, which shall be responsible for its maintenance and continuing operation; or located on each lot within the subdivision and constructed when the lot is developed. (c) In multi-family and nonresidential development projects, separate detention facilities shall be provided for each development. The owner of the property shall be responsible for maintenance and continuing operation of the facility. (d) The county may approve stormwater detention facilities serving 2 or more developments, provided that private ownership of the facilities and provisions for their perpetual maintenance and continuing operation are clearly established in a manner acceptable to the County attorney. (e) No portion of any detention facility shall disturb any required (as opposed to voluntary) buffer not otherwise authorized without first obtaining the required approvals.