Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT

1014.04. Stormwater detention facility

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

easement requirements.

(a) An easement at least 25 feet in width shall be required to provide access to all detention facilities from a public street. This easement shall be cleared, grubbed and/or graded so that it can be utilized by rubber-tired construction vehicles. The easement shall include a 15-foot access drive graded to maximum 15% grade. Its location shall be such as to minimize the amount of grading required.

(b) Every normally dry detention basin or detention facility shall be completely enclosed within a drainage easement. The drainage easement shall extend at least 10 feet beyond the limits of the detention facility and related facilities including fencing.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/1014.04@2023-12-05-3717882cf1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 1014.04. Stormwater detention facility | Georgia Commons