--- title: Harris County Zoning Ordinance, 1014.05. Stormwater detention facility collection: local-codes id: local-code:harris-county/zoning/1014.05 cite_as: Harris County, Ga., Zoning Ordinance ยง 1014.05 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.05 md_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.05.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.05/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-10/~division-2.md previous: https://georgiacommons.org/code/local/harris-county/zoning/1014.04.md next: https://georgiacommons.org/code/local/harris-county/zoning/1014.06.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/1014.05@2023-12-05-a9b6a57198 --- # Harris County Zoning Ordinance, 1014.05. Stormwater detention facility > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT design considerations. Permanent detention facilities, when required, shall be designed so that the following standards shall apply: (a) The location and size of all proposed stormwater improvements shall be designed in accordance with and meet all standards relating to stormwater management of this Development Code and the current edition of the "Georgia Stormwater Management Manual." (b) Stormwater detention facilities providing for the storage and controlled release of runoff shall be required for any development activity that will increase the peak rate of discharge by 1 cubic foot per second or more for the 10-year frequency storm at any point of discharge from the property. All stormwater detention facilities shall be designed to control the runoff volumes associated with storms having 2-year, 5-year, 10-year and 25-year frequencies and safe overflow for 100- year storm. (c) The structure shall be constructed such that trash and pollutants are prevented from exiting the pond. (d) The reservoir routing method or an equivalent method shall be used in sizing detention ponds. (The bowstring method is not acceptable.) (e) An emergency overflow device (which does not include the throttling device) for a detention pond shall be designed to pass the 100-year peak developed inflow without overtopping the dam. (f) Pond discharge locations shall be in defined drainage ditches. The developer's engineer shall include in the hydrology study a discussion of existing conditions downstream of the detention pond and an explanation of how downstream property owners will not be adversely affected by the "concentrated" runoff from the project boundary up to and including the ten percent point of analysis. (g) The steepest fill slopes shall be 3:1. Cut slopes shall be no steeper than 2:1. (h) The top of the berm shall be a minimum of ten feet wide when 3:1 slopes are used. (i) Slopes shall be stable under all conditions including maintenance. (j) Full and living coverage of an approved permanent grass or ground cover devoid of noxious weeds shall be provided. (k) The bottom of the pond shall be firm enough to be maintained by mechanical means. (l) Fences are required around the perimeter of a detention facility except as provided by paragraph (c) of this subsection. (1) The fence shall be commercial gauge chain link fence of 6 feet in height with a 12-foot wide two-section gate aligned with the access easement. A 10-foot wide clear area shall be provided outside of the fenced area. (2) The fence shall be constructed within the drainage easement for a detention pond and enclose the outlet piping. (3) The Public Works Director may waive the fencing requirement if the slope of the interior side slopes of the detention facility is no more than 3:1, and the 100-year ponding depth is less than 4 feet. (4) The Community Development Department may waive the fencing requirement in commercial developments when the detention facility is located more than 500 feet from a residential district, or in instances of unusual topography.