--- title: Harris County Zoning Ordinance, 1014.06. Alternate structural stormwater collection: local-codes id: local-code:harris-county/zoning/1014.06 cite_as: Harris County, Ga., Zoning Ordinance ยง 1014.06 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.06 md_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.06.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/1014.06/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-10/~division-2.md previous: https://georgiacommons.org/code/local/harris-county/zoning/1014.05.md next: https://georgiacommons.org/code/local/harris-county/zoning/1014.07.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/1014.06@2023-12-05-14ddfbbc65 --- # Harris County Zoning Ordinance, 1014.06. Alternate structural stormwater > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 2 - STORMWATER MANAGEMENT controls. (a) All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the current edition of the "Georgia Stormwater Management Manual." All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the current edition of the "Georgia Stormwater Management Manual," or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the County before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the County may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question. (b) Applicants shall consult the current edition of the "Georgia Stormwater Management Manual" for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control.